HomeMy WebLinkAbout0107691-Builidng (raze shed)OSHKOSH
ON THE WATER
.lob.Address 1123 OTTER AVE
Designer
Category
CITY OF OSHKOSH No
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS J/MICHEL SCHRADER Create Date
Contractor OWNER
182 - Wrecking Residential Accessory Structures Plan
107691
04/27/2004
Type I(~ Building (~ Sign (~ Canopy (~ Fence O Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Removed the existing shed. Per MT zoning checklist approval the structure was used as a shed and does not need to be replaced to
of Work provide compliant parking.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$500.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$20.00 Park Dedication $0.00
Date 04/27/2004 Final/O.P. 00/00/0000
Parcel Id # 0802520000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1123 OTTER AVE OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA: New Construction
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
ZONING:
Addition Alteration
COMPLIANCE CHECKLIST
DEFICIENT
Use
Lot Width
Lot Area
Lot Area Per Family
Flood Plain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
__ Signage Standards
Mechanical Equip. Screening
COMMENTS
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming
and when~ no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is
conforming and when no change is proposed.
~) APPROVED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY:
DENIED
DATE: