Loading...
HomeMy WebLinkAbout18. 20-225MAY 26, 2020 20-225 ORDINANCE FIRST READING (CARRIED PURPOSE INITIATED BY LOST LAID OVER WITHDRAWN ) APPROVE ZONE CHANGE FROM HEAVY INDUSTRIAL DISTRICT (HI) TO HEAVY INDUSTRIAL DISTRICT WITH A PLANNED DEVELOPMENT OVERLAY (HI-PD) AT 191 W. 28TH AVENUE HYDRITE CHEMICAL COMPANY PLAN COMMISSION RECOMMENDATION: Approved A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AMENDING SECTION 30-32 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO ZONING DISTRICTS. The Common Council of the City of Oshkosh do ordain as follows: SECTION 1. That Section 30-32 of the Oshkosh Municipal Code pertaining to Zoning Districts and the map therein described is hereby amended by changing the district character of the described property at 191 W. 281h Avenue from Heavy Industrial District (HI) to Heavy Industrial District with a Planned Development Overlay (HI-PD). LOT 1 OF CSM 7476 DOCUMENT NUMBER 1788858 RECORDED AT THE REGISTER OF DEEDS PLUS PUBLIC RIGHT OF WAY ADJACENT TO SAID LOT EXTENDING TO THE CENTERLINE OF OREGON STREET/ W. 28TH AVENUE, BRADLEY STREET AND W. WAUKAU AVENUE ALL IN THE 14TH WARD, CITY OF OSHKOSH, WINNEBAGO COUNTY, WISCONSIN. SECTION 2. This Ordinance shall be in full force and effect from and after its passage and publication. MAY 26, 2020 20-225 ORDINANCE FIRST READING CONT'D SECTION 3. Publication Notice. Please take notice that the City of Oshkosh enacted Ordinance #20-xxx APPROVE ZONE CHANGE FROM HEAVY INDUSTRIAL DISTRICT (HI) TO HEAVY INDUSTRIAL DISTRICT WITH A PLANNED DEVELOPMENT OVERLAY (HI-PD) 191 W. 28TH AVENUE on June 9, 2020. This ordinance changes the zoning at 191 W. 281h Avenue from Heavy Industrial District (HI) to Heavy Industrial District with a Planned Development Overlay (HI-PD). The full text of the Ordinance may be obtained at the Office of the City Clerk, 215 Church Ave. and on the City's website at www.ci.oshkosh.wi.us. Clerk's phone: (920) 236-5011. M i 0 ������ ♦OWN ��t '° En ) City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkosh assumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. For full disclaimer please go to mv.w.d.oshkosh.wi.usiGlSdisclaimer C:1Usersuninak,Cesktop12t;20 Plen Cammiss on Ste P€ar. Map Template.mxd N 1 in=0.06mi 1 in=300ft 'A — Printing Date: 5/6/2020 Prepared by: City of Oshkosh, WI I , rA City P a a (E�Serl' TO: Honorable Mayor and Members of the Common Council FROM: Mark Lyons Planning Services Manager DATE: May 21, 2020 RE: Approve Zone Change from Heavy Industrial District (HI) to Heavy Industrial District with a Planned Development Overlay (HI-PD) at 191 W. 28th Avenue (Plan Commission Recommends Approval) BACKGROUND The subject area consists of an approximately 19 acre parcel with frontage on W. 28th Avenue, Bradley Street and W. Waukau Avenue. The property is occupied by Hydrite Chemical and includes an industrial building, storage buildings and paved parking/storage areas as well as a railroad connection. The surrounding area consists of commercial and industrial uses. The 2040 Comprehensive Land Use Plans recommends industrial use for the subject area. ANALYSIS The applicant is proposing to construct a private rail yard that will connect to the Canadian National area service track that runs along the west side of the subject property. This rail yard will take the place of the existing unsecured facility located north of Oregon Street. The project includes five separate spur tracks for railcar storage to be constructed in the initial phase with space reserved to accommodate two additional spur tracks for future growth. The applicant is requesting a zone change to add a Planned Development Overlay to the existing Heavy Industrial (HI) base zoning to allow for the proposed expansion and potential future improvements, as the site has a unique lot configuration and land use related to the rail connection, resulting in difficulties meeting zoning requirements. Several Base Standard Modifications (BSMs) are required to allow for the proposed rail yard. Staff is supportive of adding the Planned Development Overlay for this purpose as the intent is io accommodate expansion of an industrial use with hardships related to the lot configuration. RECOMMENDATION The Plan Commission recommended approval of the zone change with conditions and findings at its May 19, 2020 meeting. Please see the attached staff report and meeting minutes for more information. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://w .ci.oshkosh.wi.us Respectfully Submitted, Mark Lyons Planning Services Manager Approved: Mark A. Rohloff City Manager City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://w .cl.oshkosh.wi.us ITEM: PUBLIC HEARING: ZONE CHANGE FROM HEAVY INDUSTRIAL DISTRICT (HI) TO HEAVY INDUSTRIAL DISTRICT WITH A PLANNED DEVELOPMENT OVERLAY (HI-PD) AND APPROVAL OF A GENERAL DEVELOPMENT PLAN AND SPECIFIC IMPLEMENTATION PLAN FOR A RAIL YARD EXPANSION AT 191 W. 28TH AVENUE Plan Commission meeting of May 19, 2020. GENERAL INFORMATION Owner /Applicant: Hydrite Chemical Company - Ron Carrington Action(s) Requested: The applicant requests a zone change from the existing Heavy Industrial District (HI) to Heavy Industrial District with a Planned Development Overlay (HI-PD). The applicant also requests approval of General Development Plan and Specific Implementation Plan to allow for expansion of a rail yard. Applicable Ordinance Provisions: The Zoning Ordinance does not establish criteria relative to appropriateness of changing zoning from one classification to another but relies on the Comprehensive Plan and good planning principles. Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Background Information: The subject area consists of an approximately 19 acre parcel with frontage on W. 281h Avenue, Bradley Street and W. Waukau Avenue. The property is occupied by Hydrite Chemical and includes an industrial building, storage buildings and paved parking/storage areas as well as a railroad connection. The surrounding area consists of commercial and industrial uses. The 2040 Comprehensive Land Use Plans recommends industrial use for the subject area. Subject Site Existing Land Use Zoning Industrial HI Adiacent Land Use and Zonin Comprehensive Plan Land Use Recommendation I Land Use 2040 Comprehensive Land Use Recommendation Industrial ANALYSIS Use The applicant is proposing to construct a private rail yard that will connect to the Canadian National area service track that runs along the west side of the subject property. This rail yard will take the place of the existing unsecured facility located north of Oregon Street. The project includes 5 separate spur tracks for railcar storage to be constructed in the initial phase with space reserved to accommodate 2 additional spur tracks for future growth. Zone Chance The applicant is requesting a zone change to add a Planned Development Overlay to the existing Heavy Industrial (HI) base zoning to allow for the proposed expansion and potential future improvements, as the site has a unique lot configuration and land use related to the rail connection, resulting in difficulties meeting zoning requirements. Several Base Standard Modifications (BSMs) are required to allow for the proposed rail yard. Staff is supportive of adding the Planned Development Overlay for this purpose as the intent is to accommodate expansion of an industrial use with hardships related to the lot configuration. Site Design The proposed rail yard will branch south from the existing railroad track along the Hydrite plant and extending into the southeast corner of the site. A stone/gravel "trackmobile " path will also be constructed on the east side of the property connecting to the rail yard from the existing storage buildings on -site where the trackmobiles will be housed. The rail yard will be enclosed with a combination of existing and new 8' tall chain link security fencing with barbed wire along the property lines. This request does not include additional parking areas and does not trigger the need for increased parking. With the additional railroad track areas, the property is still well under the maximum impervious surface ratio of 70% for the HI district. Re wired Provided Front Setback (south) 30 ft. min. 3.4 ft. (W. Waukau Ave.) Street Side Setback (east) 30 ft. min. 4.8 ft. (Bradley St.) Side Setback 20 ft. min. Same as existing Rear Setback 25 ft. min. Same as existing Impervious Surface 70% max. 52.13% The applicant is requesting BSMs related to setbacks. The proposed railroad tracks extend into the front and street side setbacks and the track -mobile path extends into the street side setback. One of the rail car bumpers will extend into the 30' X 30' vision clearance triangle, which will also require a BSM. According to the applicant, there are no alternative locations for the rail ITEM. Rezone, GDP & SIP 191 W. 28f" Ave. yard that do not extend into the front setback areas. The applicant's narrative notes that the rail system design was planned out to work within the confines of Hydrite's property and to also consider the realigned creek, drainage and stormwater management facilities. Staff is supportive of the requested setback reductions as site constraints related to the configuration of the lot restrict the ability to meet setback requirements. However, staff is recommending that the proposed setbacks be increased to 10' along both right-of-ways. The Department of Public Works has noted that the proposed site plan results in the ballast foundation entering the public right-of-way, which is not permissible. Therefore, they are requesting that the end of the track stub including its ballast foundation remain at least 10 ft. away from the property/right-of-way line to avoid hardships related to the constructability of the right-of-way. Additionally, this separation from the right-of-way will allow sufficient space for mature growth of proposed landscape features. To mitigate the reduced setbacks, staff is recommending a condition that required street frontage landscaping points along the Bradley St. and W. Waukau Ave. frontages be doubled and include medium/tall evergreen trees to screen the area from view. Staff is also supportive a BSM to allow the rail bumper within the 30' X 30' vision triangle as the bumper will be relative small (3' 4" tall X 7' 8" long) and should not obstruct vision clearance at the intersection. The Department of Public Works has requested a condition that the final bumper location be reviewed and approved by the Department of Public Works. The applicant is also requesting a BSM to allow 8 ft. tall chain link fencing with barbed wire to be located within the front yard, where code prohibits chain link fencing in front or street yards and fencing with barbed wire is required to meet principal structure setbacks. The applicant plans to replace/repair some of the existing fencing and install new fencing so that the entire property is surrounded by 8 ft. tall chain link fencing with 3 barbs to satisfy Department of Homeland Security requirements. According to the applicant, the 8' tall chain link fencing with barbed wire is needed along the entire perimeter of the property due to the nature of Hydrite's business and operations and compliance with the Department of Homeland Security safety requirements. Staff is supportive of this BSM as the fencing is needed to fully secure the site. The proposed stone/gravel surfacing of the trackmobile path will also require a BSM as code requires all circulation areas to be of a hard surface (concrete or asphalt). Staff does not have concerns with the proposed BSM as the surfacing will be consistent with the rail yard and will only be used for trackmobile access. Storm Water Management/Utilities Storm water management plans have been provided and are being reviewed by the Department of Public Works. To accommodate the track layout, the existing Gallups/Merritt Creek corridor will be re -aligned to minimize the amount of stream that would be enclosed by pipe. The applicant has applied for permits through the WDNR and Army Corps of Engineers for the realignment with approvals pending. Finalized storm water management plans will need to be submitted and approved as part of the Site Plan Review processes. ITEM. Rezone, GDP & SIP 191 W. 28r' Ave Landscaping Points Required Points Provided Building Foundation Not Required 0 Paved Area Not Required 0 Street Frontage StradStreet) 300 (150 medium trees) 1516 (348 medium trees) Street Frontage (W. Waukau Ave.) 46.5 (23.25 medium trees) 240 (0 medium trees) Yards 1,175 1,438.3 Total 1,521.5 3,194.3 Building Foundation Building foundation landscaping points are not required as no additional building areas are being constructed. Paved Area Paved are landscaping points are not required as no parking areas are being added to the site. Street Frontage Code requires 30 points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. As previously noted in this report, staff is recommending that the total landscaping points be doubled to mitigate the reduced setbacks. The applicant has provided more than double the code required landscaping points on the provided landscaping plan. Medium trees have not been provided along the W. Waukau Ave. frontage, which will require a BSM. Staff is supportive of a BSM as the provided tall evergreen trees are appropriate in this case as they will provide screening of the rail yard. The proposed placement and/or species of the plantings will need to be adjusted so that the plantings do not encroach into the public right-of-way at maturity. Staff is recommending a condition that the final landscaping be reviewed and approved by the Department of Community Development to verify that the plantings are placed accordingly to not extend into the public right-of-way. Yards Code requires 10 landscaping points per 1,000 sq. ft. of gross floor area, which in this case is applied to the expanded rail yard area. Per the provided plan, yard landscaping is being provided in conjunction with the rerouting of the stream and exceeds the total yard landscaping point requirement. Signage No signage is being proposed. Site Lighting ITEM. Rezone, GDP & SIP 191 W. 2ff Ave A lighting plan has been provided for the rail yard. As no new parking areas are being provided, minimum lighting levels are not required but the provided lighting must meet requirements for setbacks, pole height and fixtures type. The plan is in compliance with lighting standards with the exception that the eastern -most light pole extends into the street side setback as it shows a 26' 7/8" setback where a 30' setback is required. Staff is supportive of the reduced setback is it is necessary to provide lighting for the rail yard and increased landscaping is being utilized to mitigate the concerns related to setbacks as previously noted in this report. Building Facades No new buildings or exterior modifications to existing buildings are being proposed. Overall Site The applicant is requesting several BSMs, primarily related to setback requirements. To offset the requested setback reductions the applicant has provided roughly 5 times the required points for street frontage landscaping and more than doubled the total points required overall. The increased landscaping will serve to mitigate the impacts of the reduced setbacks on the surrounding area. Staff is comfortable that the applicant has adequately offset the requested BSMs and the overall site will not be detrimental to the surrounding area. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City's Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (f) The proposed Planned Development project design does not detract from areas of natural beauty surrounding the site. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. ITEM. Rezone, GDP & SIP 191 W. 28r' Ave (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptionsibase standard modifications variation of any standard or regulation of this Chapter. 0) For Planned Development projects that are proposed to be developed in phases, the applicant can provide a timeline for development and can demonstrate that the project would be successful even if all phases were not or could not be completed. Staff recommends approval of the rezone, General Development Plan and Specific Implementation Plan with the findings listed above with the proposed following conditions: 1. BSM to allow reduced front yard setback to 10' (south). 2. BSM to allow reduced street side setback to 10' (east). 3. BSM to allow reduced street side setback for light pole to 26' 7/8" (east). 4. BSM to allow rail bumper within 30' X 30' vision clearance triangle. 5. Final location of rail bumper shall be reviewed and approved by the Department of Public Works. 6. BSM to allow 8' tall chain link fencing with barbed wire fencing within front yard areas. 7. BSM to allow stone/gravel surfacing for the trackmobile path. 8. BSM to allow 0 street frontage landscaping points devoted to medium trees on the W. Waukau Avenue frontage. 9. Final landscaping plan shall be reviewed and approved by the Department of Community Development. The Plan Commission approved of the rezone, General Development Plan and Specific Implementation Plan as requested with findings and conditions noted. The following is the Plan Commissions discussion on this item. Site Inspections Report: Ms. Propp reported visiting the site. Staff report accepted as part of the record. The applicant requests a zone change from the existing Heavy Industrial District (HI) to Heavy Industrial District with a Planned Development Overlay (HI-PD). The applicant also requests approval of General Development Plan and Specific Implementation Plan to allow for expansion of a rail yard. Mr. Slusarek presented the item and reviewed the site and surrounding area as well as the land use and zoning classifications in this area. The applicant is proposing to construct a private rail yard that will connect to the Canadian National area service track that runs along the west side of the subject property. This rail yard will take the place of the existing unsecured facility located north of Oregon Street. The project includes 5 separate spur tracks for railcar storage to be constructed in the initial phase with space reserved to accommodate 2 additional spur tracks for future growth. The applicant is requesting a zone change to add a Planned Development Overlay due to the several Base Standard Modifications that are required to allow for the ITEM. Rezone, GDP & SIP 191 W. 28r' Ave. proposed rail yard. The applicant is requesting several BSMs, primarily related to setback requirements. To offset the requested setback reductions the applicant has provided roughly 5 times the required points for street frontage landscaping and more than doubled the total points required overall. The increased landscaping will serve to mitigate the impacts of the reduced setbacks on the surrounding area. He said staff recommends approval of the rezone, General Development Plan and Specific Implementation Plan with the findings and conditions listed in the staff report. Mr. Fojtik opened technical questions to staff. There were no technical questions on this item. Mr. Fojtik opened up the public hearing and asked if the applicant wanted to make any statements. There were no statements from the applicant. There were no public comments on this item. Mr. Fojtik closed the public hearing and asked if the applicant wanted to make any closing statements. There were no closing statements from the applicant. Mr. Fojtik closed public comments and asked if the applicant wanted to make any closing statements. There were no closing statements from the applicant. Motion by Propp to adopt the findings and recommendation as stated in the staff report. Conditions: 1. BSM to allow reduced front yard setback to 10' (south). 2. BSM to allow reduced street side setback to 10' (east). 3. BSM to allow reduced street side setback for light pole to 26' 7l8" (east). 4. BSM to allow rail bumper within 30' X 30' vision clearance triangle. 5. Final location of rail bumper shall be reviewed and approved by the Department of Public Works. 6. BSM to allow 8' tall chain link fencing with barbed wire fencing within front yard areas. 7. BSM to allow stonelgravel surfacing for the trackmobile path. 8. BSM to allow 0 street frontage landscaping points devoted to medium trees on the W. Waukau Avenue frontage. ITEM. Rezone, GDP & SIP 191 W. 28"' Ave 9. Final landscaping plan shall be reviewed and approved by the Department of Community Development. Seconded by Ford. Mr. Fojtik asked if there was any discussion on the motion. There was no discussion on the motion. Motion carried 9-0. ITEM. Rezone, GDP & SIP 191 W. 2ff Ave SUBMIT TO: City of Oshkosh Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, WI 54901 of Planned Development Application PHONE: (920) 236-5059 Oshkosh For General Development Plan or Specific Implementation Plan **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: Hydrite Chemical Company - Ron Carrington Date: 4,9i2p Petitioner's Address; 114 N. Main Street Telephone #: ( 608 ) 332-1642 City: Cottage Grove State: WI_ Zip: 53527 Email ron.carrington@hydrite.com Contact preference: ❑ Phone Q Email Status of Petitioner (Please Check): ❑ Owner X Representative ❑ Tenant ❑ Prospective Buyer Petitioner's Signature (required): l% Date: April 13,2020 OWNER INFORMATION Owner(s) Hydrite Chemical Company - Joseph J. Weishar Owner(s) Address: 300 N. Patrick Blvd Telephone #: ( 262 ) 792-8727 Date: 4/9/20 City: Brookfield State: WI Zip: 53045 Email: ioe.weishar@ahydrite.com Contact preference: ❑ Phone 0J Email Ownership Status (Please Check): ❑ Individual ❑ Trust ❑ Partnership XCorporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner's Signature: Date: TYPE OF REQUEST: g General Development Plan (GDP) ❑ General Development Plan (GDP) Amendment 9 Specific Implementation Plan (SIP) ❑ Specific Implementation Plan (SIP) Amendment SITE INFORMATION Address/Location of Proposed Project: 191 W. 28th Ave, Oshkosh, WI 54902 Proposed Project Type: Rctahliahmenr and exnnncinn of n secure ra lyard Current Use of Property: Industrial - Chemical Manufacturing and Distribution Zoning: HI Land Uses Surrounding Your Site: North: 20th Ave and Industrial South: Waukau Ave and Industrial East: Bradley St. and Industrial and Cemetery_ West: Rail and Industrial ➢ It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal. ➢ Application fees are due at time of submittal. Make check payable to City of Oshkosh. ➢ Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City's website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm Sign Staff Date Rec'd ❑ Proposed grading plan. ❑ Specific landscaping plan for the subject site, specifying the location, species, and installation size of plantings. The landscaping plans shall include a table summarizing all proposed species. Architectural plans for any nonresidential buildings, multi -family structures, or building clusters, other than conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor area, bulk, and visual character of such buildings. Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and walkways. ❑ Signage plan for the project, including all project identification signs, concepts for public fixtures and signs, and group development signage themes that may or may not vary from City standards or common practices. ❑ Specific written description of the proposed SIP including: • Specific project themes and images. • Specific mix of dwelling unit types and/or land uses. • Specific residential densities and nonresidential intensities as described by dwelling units per acre, and landscaping surface area ratio and/or other appropriate measures of density and intensity. • Specific treatment of natural features, including parkland. • Specific relationship to nearby properties and public streets. • Statistical data on minimum lot sizes in the development, the precise areas of all development lots and pads; density/intensity of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission. A statement of rationale as to why PD zoning is proposed. This statement shall list the standard zoning requirements that, in the applicant's opinion, would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project. • A complete list of zoning standards that would not be met by the proposed SIP and the location(s) in which such exceptions/base standard modifications would occur. • Phasing schedule, if more than one development phase is intended. ❑ Agreements, bylaws, covenants, and other documents relative to the operational regulations of the development and particularly providing for the permanent preservation and maintenance of common open areas and amenities. ❑ A written description that demonstrates how the SIP is consistent with the approved GDP and any and all differences between the requirements of the approved GDP and the proposed SIP. I hereby certify that to the best of my knowledge all required application materials are included with this application. I am aware that failure to submit the required completed application materials may result in denial or delay of the application request. Applicant's Signature (required): CJ�� �vc... Date: SUBMIT TO: Cityof Oshkosh Application Dept. of Community Development pp 215 Church Ave., P.O. Box 1 130 Cl%W Zoning Map Amendment (Rezoning) Oshkosh, Wisconsin 54903-1130 Oshkosh PHONE: (920) 236-5059 **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: Hydrite Chemical Company - Ron Carrington Date: 4/9/20 Petitioner's Address: 114 N. Main Street Telephone #: (608 ) 332-1642 City: Cottage Grove State: WI Zip: 53527 Email: ron.carrington@hydrite.com Contact preference: ❑ Phone 0 Email Status of Petitioner (Please Check): p Owner XRepresentative ❑ Tenant ❑ Prospective Buyer Petitioner's Signature (required): Ib14 t3�' L �.�,,_r. Date: April 13, 2020 OWNER INFORMATION Owner(s): Hydrite Chemical Company - Joseph J. Weishar Date: 4/9/20 Owner(s) Address: 300 N. Patrick Blvd City: Brookfield State: WI Zip: 53045 Telephone #: (262 ) 792-8727 Email: ioe.weishar@hydrite.com Contact preference: ❑ Phone R Email Ownership Status (Please Check): ❑ Individual ❑ Trust ❑ Partnership XCorporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Pl�gn ' S rvice ,Division for incomplete submissions or other administrative reasons. Property Owner's Signature: j1y az Date: I ZG` 2 U Address/Location of Rezoning Request:. 191 W. 28th Ave, Oshkosh, WI 54902 Tax Parcel Number(s): 91413300100 Rezone property from: HI to Purpose for Rezoning: The Planned Development overlay will provide Hydrite with the additional flexibility necessary I11rMS YI 1. � 1. f i'. 1 L 1 / li . 1 f ■ t i f- 1 1 Describe existing property development and land use: Chemical inanufac_tur_inp and disiribution Describe proposed development and/or proposed land use: Same as existing; but expanded Proposed time schedule for development and/or use of the property: Proposed construction of rail facilities to be substantially completed in 2020 Zoning Adjacent to the Site: North: 28th Ave and HT South: Waukau Ave and HI East: Bradley St. and HI and I West: Rail and HI Sign Staff Date Rec'd Project Narrative for the Proposed Rezone/Overlay Hydrite Chemical Company — Oshkosh 191 W. 28t' Avenue Purpose Hydrite Chemical Company is seeking to obtain a Planned Development Overlay District on their existing property that is currently zoned Heavy Industrial (HI). Hydrite Chemical is asking the City of Oshkosh to approve the following requests: • Approval of the General Development and Specific Implementation Plans concurrently at the May Planning Commission Meeting. • Request to remove the second reading requirement prior to City Council approval • Approval of the General Development and Specific Implementation Plans concurrently at the May City Council Meeting. Project Background — Site Information Hydrite's property is in the heart of the City's Industrial districts and is generally bounded by West 28th Avenue on the north, Bradley Street on the east, Waukau Avenue on the south, and CN rail along the west. Hydrite's Oshkosh facility has been in operation at the 191 W. 28th Avenue location and has secured properties located adjacent to their plant as they have become available. The most recent purchase included the property to the south of the plant, formerly known as 3033 Bradley Street. Constraints associated with this property include it being bounded on all sides by manmade and natural features. The Gallups/Merrit Creek corridor, which serves as an urban/natural drainage, way runs through this property. The property also is trapezoidal in shape and narrows at the far southern edge where it abuts Waukau Avenue. Project Background — Planning Hydrite has been in the planning stages for this project since 2015, with more defined and focused efforts occurring from 2017 to present. The core of the project team includes Hydrite Chemical (owner), Design 9 (rail design consultants), and REI Engineering (survey and civil engineering consultant). A variety of approving authorities are involved with the project as well and includes the Department of Homeland Security, Canadian National Railroad, Wisconsin Department of Natural Resources, Army Corps of Engineers, and the City of Oshkosh. Hydrite has worked in cooperation with each of these approving authorities throughout the design process, and with the plan now being clearly defined, is seeking the last stage of approvals through the City. Permits and approvals from the other entities are anticipated to be in hand prior to, or concurrent with the City's approval schedule. 1 P:\5200-5299\5223B- Hydrite Rai l\Engineer\Permits\Local\Rezone\Project Narrative.docx Existing and Proposed Operational Summary Hydrite's Oshkosh facility needs to improve and expand the existing railroad capabilities to increase the number of rail cars that can be handled onsite to meet and increase growing consumer demand of product while meet Hydrite's current business model. Additionally, this facility is under mandate from the Federal Department of Homeland Security to resolve the unsecured rail storage yard north of Oregon St. Since 1981, Hydrite's Oshkosh facility performs chemical distribution, bleach distribution, aqua ammonia manufacturing, technical and food grades for drum & bulk operations, cleaners and sanitizers for food processing, white room production area, acetic acid, calcium chloride, potassium hydroxide packaging, and food processing production. In 2019 Hydrite stopped internal production of bleach and entered into a sourcing agreement with another supplier. This decision was made to eliminate having bulk chlorine chemical at this facility to enhance safety. The increase in safety will be realized at the Hydrite facility, the City of Oshkosh, the CN Railroad, and the environment. Due to the change in Hydrite's business model of outsourcing bleach production, it increased rail traffic due to bleach now being delivered via rail, thereby necessitating a rail expansion. The 3033 Bradley Street property (between Hydrite's facility and Waukau Avenue) was purchased for the purpose of the rail yard expansion in 2014 and is a key component to Hydrite's operating future as well as compliance with Department of Homeland Security mandates. Plan Narrative The project generally consists of the construction of a private rail spur and yard that will connect to the Canadian National area service track that runs along the west side of the Hydrite property. This spur and railyard will take the place of the existing unsecured facility located north of Oregon Avenue. As a result of this project, all rail movement will be secured as it will be conducted internally, and it will not necessitate additional road crossing or signalization as other alternative plans would have. The rail spur project consists of a primary switch off the CN service line just south of 28th Street. Within the site, 5 separate spur tracks for railcar storage will be constructed in the initial project phase, with space reserved in the plan to accommodate 2 additional spur tracks for future growth. The spur tracks will resemble traditional rail construction with steel tracks, wooden ties, and stone ballast. The spur and track system will be constructed from Hydrite's existing plant and south towards the intersection of Bradley Street and Waukau Avenue. Additional facilities that are accessory to the rail spur system include graveled access shoulders along the exterior edges of the track system to provide access and workspace while managing the railcars. Additionally, an access path will be provided for Hydrite's "Trackmobile" from their storage buildings along Bradley Street to the rail yard for Hydrite's railcar switching needs. The trackmobile will be housed/garaged within a converted portion of the existing storage buildings and the path will facilitate onsite trafficking as compared to utilizing Bradley Street. 2 P:\5200-5299\5223B- Hydrite Rai l\Engineer\Permits\Local\Rezone\Project Narrative.docx To work with the spur track layout, the existing Gallups/Merrit Creek corridor will be re -aligned to minimize the amount of stream that would be enclosed by pipe. The crossing of the creek corridor and flow conveyance will entail the use of (3) 8'-diameter equivalent culvert pipes. The proposed realignment, stream crossing (culvert), and wetland impact permits have been applied for through both the WDNR and Army Corps of Engineers with approvals pending. Hydrite will also work with City Staff to provide access to the creek corridor for emergency and maintenance purposes. Stormwater management facilities will also be constructed as a part of the project to mitigate the increase in hard surface and resulting stormwater runoff. A stormwater management plan has been submitted to the City and WDNR for review. Request for the Rezone/Planned Development Overlay As described through this narrative, there are several features, design constraints, and approving authorities that have played a role in driving the current plan. Rail system design and construction to accommodate large tanker cars does not offer many options to work with constraints. The limitations are not just spatial, but also include elevational constraints and the desire to minimize track curvature. To put it in perspective, rail system design is even more rigid and less nimble than highway design. The rail system design was planned out to work within the confines of Hydrite's property and to also consider the realigned creek, drainage and stormwater management facilities. Very little unused space will remain within the boundary of Hydrite's property following build -out of the project. The City's zoning ordinance contains a 30' building and pavement setback from the adjacent Waukau Avenue and Bradley Street property lines as well as a 30' vision triangle from the intersection of the right of way lines. Various proposed features are proposed to expand into the setback and include a portion of track and railcar bumper, gravel service shoulders, and the trackmobile access path. One of the railcar bumpers will encroach slightly into the vision triangle. No other alternatives exist to eliminate these encroachments without significantly altering and minimizing the plan due to reasons outlined previously. Hydrite's perimeter security fence was permitted and installed in 2016 and is constructed as an 8'-tall chainlink fence with barbed wire. It currently follows along the Waukau Avenue and Bradley Street right of way lines and runs within interior portions of the site. Although the plan is to maintain the perimeter fence, additional (similar) fencing will also be installed to supplement and replace existing fencing to work with the project improvements. Due to the nature of Hydrite's business and operations, and compliance with the Department of Homeland Security safety requirements, Hydrite is requesting the ability to install 8' chainlink security fencing equipped with barbed wire along their property lines and along the creek corridor. There is no proposal to pave any of the facilities associated with the railyard, and as explained earlier, the construction of these facilities will follow along with traditional rail construction which includes, steel rails, wooden ties, and stone ballast. The exterior access paths along the rail spur will also be constructed of stone ballast and the path for the trackmobile will be constructed similarly. Hydrite is asking the City to waive the paved surface requirement due to 3 P:\5200-5299\5223B- Hydrite Rai l\Engineer\Permits\Local\Rezone\Project Narrative.docx the proposed facilities being associated and auxiliary to the rail system. Stone/gravel surfacing used will be dust -free and support low -speed (less than 5 mph) traffic. To help soften the appearance of the proposed railyard from the public right of way, Hydrite will install and maintain proposed landscaping immediately within the existing perimeter security fence along Bradley Street and Waukau Avenue. Conclusion Hydrite appreciates the support the City has offered to them throughout their time in operation, and more recently, during the planning of the proposed rail spur. This expansion project will help to guarantee Hydrite's operational viability within the City, and the specified deviations from the City's HI zoning regulations will help Hydrite expand and maximize usage of the developable space within their property, while matching with existing security features and typical rail facility construction. Rezoning of the property to the Planned Development overlay district is the last step to facilitate a lengthy planning and approval process that this project has endured. We respectfully request the city to grant the planned development overlay zoning to provide the flexible mechanism needed to waive compliance with standard zoning requirements. Please refer to the permit applications, plans and mapping for additional supporting information. 4 P:\5200-5299\5223B- Hydrite Rai l\Engineer\Permits\Local\Rezone\Project Narrative.docx N rn CD o d r� E�NIGTne �� 9NI151X3 C uj� J I I � va- �NIGTne �v o el i I up�7 N Q Ur \ I W \ I P \ I I \ 2 1 W I \w \s 3( L — — — — a� U I� III c � I Iw li G Z I ra zw w> I H I Of O N W W I > z Z Z K ~ I } W W ep W I I Z J >_ z W W I SETBACK nvV j VM M . wELL EXISTING RETAINING WALL EXISTING BORING ND TC4�-I U GRAVEL Z O rn \ C "EXISTING C��"'0 CONCRET .c C - \ ISTING W r PHALT W - 1 � w v I v 1 s v 1 Iv I I v w _ I o v II I oar CD F - U o I \ N 3 I I wa \ I \ I I I I I \✓_ �I i I \\ I \ ml I I z \ I I \ I I \ I I V I \a ,x va W _ I N I \ \ \ K I I \ I I \ \ I I W J \ I I Q o aQa \ II I I U o r a \ I I o _ \ cnI < < < \\ m m Q a o w \ I I I H N W Q a- zQ a omz w� \ _� w> H Qm Of a \\\ \\ ICI Z N O > Z_ r 0 w z Of 30'STREET SETBACK _ N I U Z z�ww �a rwFF zF � _ I J ® _____ zlnN3AV nVW1VM 'M-- - ----_ - - - _ 0 WATER MANHOLE , 1 f GATE t� — \ C w _ w A K 001 inowT Oma'3119-001-9CZZS\snvTeMa\Tlva 31I - 9£ZZS\66Z5-OOZS\:d 3TIL 9NIMVdC n O � D O N M= -O LP ON vq N co - N `J C 3 � CD N I O 49 U1 L in j O t L L O C O N N O N N L tL„ O C R O N O N= L O N� > D O 9 O N N m O N a "6 O- V f6 m V O C p D m� D m C C C U N m C y 'X U fl1 T U1 m m O O N a U1 c y y Q N E O N L m C m L m L D C O C L O L o O m oa E A m N a O y N m Ul N D U N y U D U z m U N~ L C d C .� O U U L m N N ~ Ul m n U t O Q a)D c)N F L d 9 L Z m U L? m ~ U 9 U O' L O U a 0 r p vrrva wrei ro /� r� I 11 � a a f\ 0 0 � s to s l y 0 = _ W AU) W Q ci o N 1y o oFwo z mo oo�o �wvz m a� w °a a w & - a g �a N O W a a d d o z 9 N Q W w a z a Q w w rom In a /- S W w O ° z Q e e a owZ ��. d�'!oH F� °LLWZ^Z aza¢w0 1- ¢y O- - a aaO.o (n i a D' z m N m 0 o u a EL w a a a s m w N �o a� Umo w=_ ¢ Z N g No z ;�o 4i�W „ ;��q i p g H W a N= ����w$� m m m m m m °w a o r O a w 4z a O wa' o= w o� z=�� } - N w LL � LL a - a 61N - 0 � S C o- W 0.0.-L1000 �ddNrr V U) NNNUNUuu uWu��11��� } m % ➢ \.ice . �/ LL Wk oP 1\ \ �� j Cw w NORTH aIr \ / W N 0 0 v i m C I_ w W aZ F r EXI _ ryry z O w > w w mmxxi lull IE75-63 'I m 'w'=� 05 Mix n w @ @ Z S 333 mm - �Gcl ww 'w fn \ \• I� C li ®� U W 0. 12 a o o�rcu��3a �uaa um� Nz 2 N , ¢ - •'\2` a ggi o �3; ,,\ ` ca �� =;�Q N agm�dd� <�Q a 3 \ Q u a 3AY f1VNl1VM 'M c 51 _ odzbwm6a°to °°oSd�> d w _ - �o o °aw a o � � m a�k�wrc e o� o ���ap�a as yaw �w �w oe �zeW�a pmaQ�a� a'�Q� on anoev� =-4rr�zaz v� Hs —so aiiaa.Hwawavd�avoa�HsovHso ailaa.H �Ia-oz�sioaroauwoevna.-a aTI ewnivaa 'U J a a N 0 a - F . o w C5 w o�w0 z �wxc7 c7 wN? ? w Noa a Kowa a OJOZ z Gaza a "9z m WwoO O. xawp-p o<' Z o Z I- Zaao rI_ w w w= Z XR y yzmmoy m � J z � a NORTH �iNw_ 0 n J LD Jz r o z w zoo w> _ z = Qwa oQ EI 000 Ww o �w NWo >G� U Z W 332 Mfxm min S� ��'i Z ZWo — a U a - � w II\ -1 111 1«na 41—T-J2ai V\ 311$I H 6 -3\U INI-M Aanis DIUM/4OlOHd ONUHDIF 31lS UP Otld HSON HSO . ItlJIW3HJ 311HOAH NOd SJOtlNl AN15f10N1 MIN o 3 6 w o ■ ' Z06t,S NISNOSIM'HSONHSO s " w ]AV H18Z M 161 ff' ANVdAODIVDIW3HD 31llJOAH e 3 i to l x \q V II 11 II II t II II II II II II II IC�YY I)I I)) I II II II II � I)I II � x - � VI � w w w - 0 AOf11S DIUM/401.01-ld 9NUH 911311S UP IOtld HSON HSO ItlJIW3HJ 31MOAH NOd sN:)vdl AusnUN1 MIN HZ06bS NISNOJSIM'HSONHSO s " 1iv ]AV H18Z M 161 ANVdAODIVDIW3HD 3AMAH e 3 i 0 0 x 4 II I� II II II II II II II II II II IC�YY I)I I)) I II J II I I II II I III I � g .ii o 0 w eaw» aw o 133HS33dSTdnixij-A11lUtlj HS071HS0 1tl71W3H7311N OAH 80j SJIJtlNl AN15f10 NI M3N wo i Z06b5 NISN0751M HSOA HSO H1� m w 3Atl H18Z M T6T reozisgw ii w ANVdWOJ IVDIW3HJ 311UGAH ` <s I l @3 fl v _ e _ e � # 'a S �� � � � fA➢ m€ 1 � a I Ril a •J` � �� �- -Ak. - ems= d-neAa -�� wR& e.-ae. y Q �o 9 0 Um HOHM$ $ WH Is d 4 a P g e g e i REZONE.GDP.SIP OSHKOSH TRUCK CREDIT UNION GERMAN EV LUTH CEMETERY 191 W 28TH AVE 2772 OREGON ST 240 W 9TH AVE PC: 05-19-20 OSHKOSH WI 54902 OSHKOSH WI 54902 PETER PISCHKE 2950 BRADLEY ST OSHKOSH WI 54902 OTA INVESTMENTS LLC N2604 COUNTY ROAD SS PINE RIVER WI 54965 ANTHONY D/SARAH C KIND 7063 MOUNTAIN RD PICKETT WI 54964 LORENZ L RANGELOFF 3000 OREGON ST OSHKOSH WI 54902 ROBERT E/SUSAN S GEHRKE REV TRUST 12121 W WOODLAND AVE MILWAUKEE WI 53226 HYDRITE CHEMICAL CO PO BOX 4747 OAK BROOK IL 60522 TOWN OF BLACK WOLF 380 E BLACK WOLF AVE OSHKOSH WI 54902 WITTMAN REGIONAL AIRPORT 525 W 20TH AVE OSHKOSH WI 54902 OSHKOSH CORPORATION PO BOX 2566 OSHKOSH WI 54903 RESOURCE HOLDINGS OSHKOSH LLC 2225 BOHM DR LITTLE CHUTE WI 54140 ROBERT J/ELAINE A KOSSEL 717 OREGON ST OSHKOSH WI 54902 ARNOLD F HENKE REV TRUST 1308 MARICOPA DR OSHKOSH WI 54904 DARRELL/STEVEN THOMA 5254 SAMERS BAY RD OMRO WI 54963 MFMF LLC PO BOX 227 GRAFTON WI 53024 HYDRITE CHEMICAL CO ATTN: RON CARRINGTON 114 N MAIN ST COTTAGE GROVE WI 53527 KARLS TRANSPORT INC PO BOX 333 ANTIGO WI 54409 SHIPPERS BUILDING LLC 300 N KOELLER ST OSHKOSH WI 54902 U A W LOCAL NO 578 BLDG CORP 2920 OREGON ST OSHKOSH WI 54902 CHARLES W/LINDA M LUEDEKE LIVING TRUST 1521 PARKVIEW DR NEW LONDON WI 54961 WISCONSIN CENTRAL LTD 17641 S ASHLAND AVE HOMEWOOD IL 60430 H & M COMMERCIAL LLC N69W25986 BRIGHTON DR SUSSEX WI 53089 HYDRITE CHEMICAL CO ATTN: JOSEPH WEISHAR 300 N PATRICK BLVD BROOKFIELD WI 53045 liffl-MMM Im Irk SUBJECT SITE fe- ]MEL'u-'r FrTm rs 41 a qq _ h a , 7-1 AF ' I m ` r &¥ Wr s � I� e} M v S 14Ik 3 /J J /1 1111 ) J FH A\ N 1 in = 0.05 mi 1 in=280ft City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkosh assumes no liability for the accuracy of the information. Those using the Printing Date: 5/6/2020 Ch ,,rr��� information are responsible for verifying accuracy. For full disclaimer please go to Oshkosh www.ci.oshkosh.wi.us/GlSdisclaimer Prepared by: City of Oshkosh, WI C:\Users\minak\Desktop\2020 Plan Commission Site Plan Map Template.mxd User. minak