Loading...
HomeMy WebLinkAbout07. 20-214 MAY 26, 2020 20-214 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID TO MINNESOTA ELEVATOR INC. FOR ELEVATOR IMPROVEMENTS FOR THE PUBLIC MUSEUM ($34,929.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for the necessary improvements to the Dover hydraulic passenger elevator within the Public Museum; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the only bid that meets the minimum bid specifications: MINNESOTA ELEVATOR INC. N50W13740 Overview Drive Suite C Menomonee Falls, WI 53051 Total Bid: $34,929.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of the same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 03231070 7214 63013 Buildings- Elevator Modernization Phase 1 � s Cia ty Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: May 15, 2020 RE: Award Bid to Minnesota Elevator Inc. for Elevator Improvements for the Public Museum ($34,929.00) BACKGROUND The Common Council allocated $50,000 in the 2020 CIP Program to provide various improvements to the Dover hydraulic passenger elevator within the Public Museum. This is the first phase of modernization efforts for this elevator. This first phase will include equipment, safety and performance upgrades focusing on the replacement of the elevator's existing power unit. Performance Elevator Consulting, LLC (PEC) was engaged as a consultant to coordinate this project. ANALYSIS Working in conjunction with PEC and Museum personnel, Purchasing reviewed and prepared bid specifications for this project. Bids were due May 14, 2020. The bid tab is attached. After reviewing the sole bid received it is the consensus of PEC and City staff that Minnesota Elevator Inc: s bid met the minimum bid specifications for this project. FISCAL IMPACT The fiscal impact of this bid is $34,929.00. This project was allocated $50,000.00 in the 2020 CIP. Factoring in $2,360.00 in consultant fees there are sufficient funds for this award. This award will be charged to A/N#: 03231070 7214 63013 (Buildings- Elevator Modernization Phase 1). RECOMMENDATION PEC and City staff recommend the bid for this project be awarded to Minnesota Elevator Inc. for $34,929.00. Respectfully Submitted, Jon G. Urben, General Services Manager Approved: Mark A. Rohloff, City Manager City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us BID TAB ELEVATOR IMPROVEMENTS - OSHKOSH PUBLIC MUSEUM BIDS OPENED MAY 14, 2020 VENDOR INFORMATION Minnesota Elevator Inc BID INFORMATION N50W13740 Overview Drive Suite C Menomonee Falls WI 53051 BID $34,929.00 PREQUAL YES BID BOND YES