Loading...
HomeMy WebLinkAbout0107656-Building (detached garage)OSHKOSH ON THE WATER .lob .Address 739 JEFFERSON ST Designer Category CITY OF OSHKOSH No BUILDING PERMIT - APPLICATION AND RECORD Owner LORELLE BULLOCK-PAULOS Create Date Contractor OWNER 150 - New Accessory Buildings-Garages (Residential) Plan 107656 04/23/2004 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: 8 Size 25x32 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage $00 Sq. Ft. Baths 0 Signs Foundation ~ Poured Concrete O Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 1 Use/Nature RES/Install a 25x32 detached garage. Using storage trusses. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $16,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $104.00 Park Dedication $0.00 Date 04/23/2004 Final/O.P. 00/00/0000 Parcel Id # 1000940000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 739 JEFFERSON ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.