Loading...
HomeMy WebLinkAbout0107690 BOSHKOSH ON THE WATER .lob .Address 709 SCOTT AVE Designer Category CITY OF OSHKOSH No BUILDING PERMIT - APPLICATION AND RECORD Owner BRIAN A R PITON/MARK E NEUBAUE Create Date Contractor OWNER 182 - Wrecking Residential Accessory Structures Plan 107690 04/27/2004 Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature RENTAL/Razing the detached accessory structure. This structure did not serve as a garage and had become dilapidated and must be razed. of Work The legal non conforming parking may be maintained. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $500.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 04/27/2004 Final/O.P. 00/00/0000 Parcel Id # 0504850000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 2244 Agent/Owner OSHKOSH WI 54903 - 2244 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: "~7~ ~. S~'- ~ PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: New Construction TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) ZONING: ~---- ~'"' Addition Alteration COMPLIANCECHECKLIST DEFICIENT Use Lot Width Lot Area Lot Area Per Family Flood Plain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or I~ZA Conditions of Approval Signage Standards Mechanical Equip. Screening COMMENTS REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. APPROVED DENIED Plan Commission Action Required Variance(s) Req~..~ REVIEWED BY: DATE: