Loading...
HomeMy WebLinkAbout2004-BuildingOSHKOSH ON THE WATER .lob Address 1605 S MAIN ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner EDWARD E/DONNA LEMKE Contractor EXCELL BUILDERS LLC Category 230 - New Stores & Customer Service No 107664 Create Date 04/21/2004 Plan L5-28-0404 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning M2 Class of Const: 5Bibc Size 50x85 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 4250 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 1 Use/Nature New 4250 sf Sporting Goods/Bait Shop. * Additional permit required for demolition of existing building. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $160,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $544.00 Park Dedication $0.00 Date 04/26/2004 Final/O.P. 00/00/0000 Parcel Id # 0305510000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1359 WINNEBAGO AVE OSHKOSH WI 54901 - 0000 Telephone Number 920-232-0985 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST ~ JOB LOCATION: 1605 S. MAIN STREET ZONING: M-2 PROPERTY OWNER/CONTRACTOR: Edward Lemke/Excell Builders~ LLC CONSTRUCTION DATA: [] New Construction [] Addition [] Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) NEW 50' x 85' (4250 SF) SPORTING GOODS/MERCANTILE/BAIT SHOP COMPLIANCE CHECKLIST DEFICIENT DEFICIENT DEFICIENT r-] use [] Lot Width I-"] Lot Area [--I Lot Area Per Family I--1 Flood Plain [] Front Yard [] FrontYard Side Street [] Rear Yard [-I Side Yards I~ Building Area [] Parking Standards [] Off-Street Loading Standards I--] Vision Clearance [-I Transitional Yard Standards 1~ Landscape Standards I~ Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [--1 Parking Lot Lighting COMMENTS: ** See updated landscape plan for approved site plan/setbacks** Per a telephone conversation with Architect Run Hansche on 4-20-2004, the 8 foot wide sidewalk running from the sidewalk of W. 16th Avenue will be narrowed to 6 feet, as this is a sidewalk area, not to be used as an off-street loading space · Attached landscape plan has been approved. · Any and all rooftop or ground level mechanical equipment and utilities must be screened from view from the adjacent streets. Ground level utility penetrations on north facing wall (W. 16th Avenue) shall be painted to match the building and screened with landscaping treatments. · For parking purposes, this building is being reviewed under the following category: Implement Store, Hardware Stem, Wholesale Establishments, Machinery or Equipment Sales and Service, Clothing or Shoe Repair or Service Shop, which requires three parking spaces. . THERE SHALL BE NO PARKiNG iN ANY DESIGNATED SETBACKS OR OUTSIDE OF DESIGNATED PARKiNG SPACES. REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: ('1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: Matt Tucker DATE: 4/20/2004 2003