November 30, 2018
Steve Navarre
Vinton Construction Company
PO Box 1987
Manitowoc, W1 54221-1987
RE: Change Order No. 1 (Final)
Contract 17-21
Dear Mr, Navarre:
Enclosed is an executed copy of Change Order No. 1. (Final) between the City of Oshkosh and
Vinton Construction Company regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
raie Ja s Rabe, P.E., CPESC
72�-
Director of Public Works
JER/t1t
Enclosure: Change Order No. 1 (Final)
cc: Pam Ubrig, City Clerk (w/original.)
Jennifer Messerschmidt, Assistant Finance Director (w/copy)
File (w/original)
L\Enginecring\2017 CC'NTRAcrs\17-21 RR Trans I.oad\Project-Iiiformatioii\Coiitract Info\Change
Orders\17-21 Executed C0#1(Final).-11-30-18.docx Page 1 of 1
City Hall, 215 Church Avenue P.O.Box 1130 Oshkosh,W1 54903-1130 http://www.cl.ost)kosh.W!.LJS
` ^
-
TO: NNTON CONSTRUCTION COMPANY CHANGE ORDER#1 (FINAL)
P.0, BOX 19D7 DATE: NOVEMBER5. 2O18
MAN|TOVV0C. VV| 54221'1887
Your present contract with the City of Oshkosh, Contract No. 17-21, awarded September 12, 2017, is hereby amended
and changed aofollows:
NET INCREASE: $72.09513
NET DECREASE: ($50.457.12)
NET|NCREASETO CONTRACT $21.638.81
TOTALS
BID TOTAL $1.782.251.08 $1'762,251.09
Cv°/
C|TYDFO3HK3SH
BY:
City Manager
City Clerk
Approved and accepted:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the
within Change Order,
Comptroller
CONTRACT 117-21 CHANGE ORDER#1 (FINAL)
RAILROAD TRANS LOAD SITE RELOCATION
CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICF- PRICE
Clearing;complete as
1010 specified Stations 3.00 3.00 $1,000.00
Grubbing;complete as
1020 specified Stations 3.00 3.00 $1,000.00
General excavation; Lump
1215 complete as specified Sum 1.00 1.00 $210,295.00
8"concrete pavement:base
in place and grading; Square
1310 complete as specified Yards 19,006.00 18,645.08 -360M $33.64 ($12,1411.35)
Base aggregate dense;3/4";
1800 complete ass ecified Tons 1.2,636.00 7,502,00 -5,134.00 $4.80 ($24,643.20)
Base aggregate dense;3/4"
special;complete as
1820 specified Tons 2,500.00 2,600.51 100.51 $12.50 $1,256.38
Fixed concrete railcar ramp;
1972 complete asspecified Each 2.00 MO $62,817.00
Catwalk relocation;complete Lump
1973 as specified Sum 1.00 1.00 - $73,660.00
16"diameter drilled piers; Vertical
1974 complete as specified Feet 678.00 681.76 3.76 $84.00 $315.84
Furnish secondhand I 15#
1980 rail;complete asspecified Net Tons 133.23 133.23 $660.00
Furnish secondhand tie
1981 plates;complete as specified Each 3,172.00 3,172.00 $8.50
Furnish turnout components;
1982 complete asspecified Each 2.00 2,00 $37,500.00
Furnish secondhand joint
1983 bars;complete as specified Pairs 149M 78.00 -71.00 $52.00 ($3,692.00)
Furnish track bolts;nuts;and
spring washers;complete as
1984 specified Each 803.00 468.00 -335M $3.05 ($1,021.75)
Furnish track spikes;
1985 complete asspecified Kegs 59.00 59,00 $100.00
Furnish cross ties;net;7"x
9"x 8'6"IG's;complete as
1986 specified Each 1,416.00 1,416.00 $38.50
Thousand
Furnish switch ties;complete Board
1987 as specified Foot 2.00 8.90 6.90 $1,900.00 $13,110.00
Furnish ballast;complete as
1988 specified Net Tons 2,48100 2,483.00 $13.50
Place ballast and surface
1989 track;complete as specified Net Tons 2,483.00 2,483.00 $9.00
Furnish and install rail
anchors;complete as
1990 specified Each 1,917.00 1,917.00 $3.00
Furnish and install new
sliding derail;complete as
1991 specified Each 2.00 MO $3,950.00
Furnish and install joint
insulation;complete as
1992 specified Each 4.00 4.00 $550.00
Furnish and install steel
bumping post;complete as
1993 specified Each 2.00 2.00 $7,500.00
Page 1 of 4
CONTRACT 17-21 CHANGE ORDER#1 (FINAL)
INCREASEIN DECREASE IN
ITEM CONTRACT CONTRACT
I DESCRIPTION UNIT INCREASE DECREASE CONTRACT INSTALLED NET NET UNIT PRICE
NUMBER QUANTITY QUANTITIES CREA CREA PRICE PRICE
Construct jointed track
exclusive of ballast;complete Track
1994 as specified Feet 2,510.00 2,510.00 $25.00
Construct turnout;complete
1995 as specified- Each 2.00 2.00 $16,000.00
Construct walkway at
turnouts;complete as
1996 specified Each 2.00 2.00 $3,500.00
Provide railroad insurance; Lump
1999 complete asspecified Sum 1.00 1.00 $8,500.00
Furnish and install 24"RCP
Class V storm sewer; Linear
2017 complete as specified Feet 169.00 174.00 5.00 $69.00 $345.00
Furnish and install 36"RCP
Class III storm sewer; Linear
2025 complete as specified Feet 58.00 42.00 -Moo $89.00 ($1,424,00)
Furnish and install 48"RCP
Class V storm sewer; Linear
2032 complete as specified Feet 79.00 64.00 -15.00 $157..00 ($2,355.00)
Furnish and install 24"RCP
Class III apron endwall with
joint ties;complete as
2144 specified Each 3.00 3.00 $900.00
Furnish and install 36"RCP
Class III apron endwall with
joint ties;complete as
2147 specified Each 2.00 2.00 $1,700.00
Furnish and install 48"RCP
Class III apron endwall with
joint ties;complete as
2149 specified -- Each 1.00 1.00 $1,728,00
Furnish and install apron
endwall grate;complete as
2199 specified Each 3.00 3.00 $1,507.00
Furnish and install standard
storm sewer inlet manhole(6'
x 6'box);complete as Vertical
2221 specified Feet 6.00 5.69 -0.31 $2,235.00 ($692,85
Furnish;install;maintain;and
remove Type D modified inlet
protection;complete as
2508 specified Each 2,00 0.00 -2M $100.00 ($200.00)
Sediment removal-Type D
modified inlet protection;
2510 complete asspecified Each 8.00 0.00 -8.00 $5.00 -($40.00)
Furnish;install;maintain;and
remove stone tracking pad;
2512 complete as specified Each 2.00 1.00 -1.00 $2,000.00 ($2,000.00)
Furnish;install;maintain;and
remove silt fence;complete Linear
specified Feet 2,379,00 2.889
2514 as speci .50 510.50 $2.00 $1,021.00--
Furnish;install;maintain;and
remove ditch check;
2522 complete asspecified Each 8.00 17.00 9.00 $75.00 $675.00
Install salvaged topsoil 6" Square
2602 depth;complete asspecified Yards 1,920.00 10,222,56E=8302.56 $2.50 $20,756.40
Page 2 of 4
CONTRACT 17-21 CHANGE ORDER#i (FINAL)
INCREASEIN DECREASE IN
ITEM UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACT
NUMBER DESCRIPTION QUANTITY QUANTITIES INCREASE DECREASE PRICE PRMF PRICE
Furnish and install native
seeding;complete as Square ($133.07
2610 specified Yards 647.00 558.29 -88.71 $1.50
Furnish and install WDOT
Seed Mixture No.20 with
fertilizer;complete as Square $5,574,84
2621 specified Yards 1,645.00 9,609-06 7964.06 $0.70
Furnish and install no-mow Square
2622 fescue;complete asspecified Yards 25.00 5511 30.21 $1.50 $45.32
Furnish and install trees;
2626 complete asspecified Each 7.00 7.00 $425.00
Furnish and install Class It;
Type B erosion control mat; Square
2634 complete as specified Yards 1,246.00 1,821.18 575.18 $2.26 $1,294.16
Furnish and install turf
reinforcement mat system; Square
2638 complete as specified Yards 647,00 616.00 -31.00 $7,00 ($217.00)
Furnish and install light rip-
rap with filter fabric;complete Square
2646 asspecified Yards 242.00 52.31 -189.69 $10.00 1 ($1,896-90)1
SECTION I-(BID ITEMS 1010 -2646)-SUBTOTAL $44,393.94 ($60,467.12)
NET DECREASE TO SECTION 1: ($6,063.18)
ALTERNATE
INCREASEIN DECREASE IN
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE
Crush salvaged concrete;
3/4"dense gradation;
B-100 complete asspecified Tons 6,500.00 11,178.00 4,678.00 $4.50 $21,051.00
Salvaged crushed concrete
B-500 credit;complete as specified Tons 6,500.00 6,842.00 342.00 ($4.80) ($1,641.60)
Install salvaged topsoil 6" Square
B-2602 depth;complete as specified Yards 6,600.00 6,658.82 58.82 $1.25 $73.52
Furnish and install turf grass; Square
B-2620 com I teas specified Yards 6,600.00 6,658.82 58.82 $0.70 $41.17
Furnish and install straw Square
B-2654 mulch:complete asspecified Yards , 6,600.00 6,658.82 58.82 $0.30 $17.65
ALTERNATE B(ITEMS B-100-B-2664)-SUBTOTAL $19,5411.74 $0.00
NET INCREASE TO ALTERNATE B: $19,641.74
ADDITIONAL WORK REQUIRED:CO#1
ITEM BID INSTALLED NET NET UNIT INCREASEIN DECREASEINCONTRACT CONTRACT
DESCRIPTION UNIT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE
Additional work to change
structure from 42"pipe to 48" Lump
1-10000 pipe;complete asspecified Sum 0.00 1,00 1.00 $1,347.50 $1,347.50
Additional material cost to
change apron endwall grate
from 42"pipe to 48"pipe; Lump
1-10001 _complete as specified Sum 0.00 1.00 1.00 $385.88 $385.88
Page 3 of 4
CONTRACT 17-21 CHANGE ORDER#1 (FINAL)
IT
EM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
NUMBER PRICE PRICE
Credit to use City provided 1-
1/4"crushed backfill in the Lump
1-10002 ramps;complete as specified Sum 0.00 1.00 1.00 ($3,549.00) ($3,549,00)
Reinforce T-Posts on existing
catwalk;complete as Lump
1-10003 specified Sum 0.00 1.00 1.00 $1,847.92 $1,847.92
Furnish and install Class 1;
Type B erosion control mat; Square
1-10004 complete as specified Yards 0.00 3,309.79 3,309.79 $2,05 $6,785.07
Furnish and install straw Square
1-2654 mulch;complete as specified 1 Yards 1 0.00 4,475.59 4,475.59 $0.30 $1,342.68
ADDITIONAL WORK:CO#1(ITEMS 1-10000-1-2654)-SUBTOTAL $8,160.05 $0.00
NET INCREASE TO CO#11: $8,160.05
NET INCREASE $72,096.73
NET DECREASE ($50,457,12)
NET INCREASE TO CONTRACT: $21,638.61
Page 4 of 4