HomeMy WebLinkAboutChange Order No 1 (Final) Vinton Construction City OfFw ushkosh November 30, 2018 Steve Navarre Vinton Construction Company PO Box 1987 Manitowoc, W1 54221-1987 RE: Change Order No. 1 (Final) Contract 17-21 Dear Mr, Navarre: Enclosed is an executed copy of Change Order No. 1. (Final) between the City of Oshkosh and Vinton Construction Company regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, raie Ja s Rabe, P.E., CPESC 72�- Director of Public Works JER/t1t Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original.) Jennifer Messerschmidt, Assistant Finance Director (w/copy) File (w/original) L\Enginecring\2017 CC'NTRAcrs\17-21 RR Trans I.oad\Project-Iiiformatioii\Coiitract Info\Change Orders\17-21 Executed C0#1(Final).-11-30-18.docx Page 1 of 1 City Hall, 215 Church Avenue P.O.Box 1130 Oshkosh,W1 54903-1130 http://www.cl.ost)kosh.W!.LJS ` ^ - TO: NNTON CONSTRUCTION COMPANY CHANGE ORDER#1 (FINAL) P.0, BOX 19D7 DATE: NOVEMBER5. 2O18 MAN|TOVV0C. VV| 54221'1887 Your present contract with the City of Oshkosh, Contract No. 17-21, awarded September 12, 2017, is hereby amended and changed aofollows: NET INCREASE: $72.09513 NET DECREASE: ($50.457.12) NET|NCREASETO CONTRACT $21.638.81 TOTALS BID TOTAL $1.782.251.08 $1'762,251.09 Cv°/ C|TYDFO3HK3SH BY: City Manager City Clerk Approved and accepted: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order, Comptroller CONTRACT 117-21 CHANGE ORDER#1 (FINAL) RAILROAD TRANS LOAD SITE RELOCATION CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICF- PRICE Clearing;complete as 1010 specified Stations 3.00 3.00 $1,000.00 Grubbing;complete as 1020 specified Stations 3.00 3.00 $1,000.00 General excavation; Lump 1215 complete as specified Sum 1.00 1.00 $210,295.00 8"concrete pavement:base in place and grading; Square 1310 complete as specified Yards 19,006.00 18,645.08 -360M $33.64 ($12,1411.35) Base aggregate dense;3/4"; 1800 complete ass ecified Tons 1.2,636.00 7,502,00 -5,134.00 $4.80 ($24,643.20) Base aggregate dense;3/4" special;complete as 1820 specified Tons 2,500.00 2,600.51 100.51 $12.50 $1,256.38 Fixed concrete railcar ramp; 1972 complete asspecified Each 2.00 MO $62,817.00 Catwalk relocation;complete Lump 1973 as specified Sum 1.00 1.00 - $73,660.00 16"diameter drilled piers; Vertical 1974 complete as specified Feet 678.00 681.76 3.76 $84.00 $315.84 Furnish secondhand I 15# 1980 rail;complete asspecified Net Tons 133.23 133.23 $660.00 Furnish secondhand tie 1981 plates;complete as specified Each 3,172.00 3,172.00 $8.50 Furnish turnout components; 1982 complete asspecified Each 2.00 2,00 $37,500.00 Furnish secondhand joint 1983 bars;complete as specified Pairs 149M 78.00 -71.00 $52.00 ($3,692.00) Furnish track bolts;nuts;and spring washers;complete as 1984 specified Each 803.00 468.00 -335M $3.05 ($1,021.75) Furnish track spikes; 1985 complete asspecified Kegs 59.00 59,00 $100.00 Furnish cross ties;net;7"x 9"x 8'6"IG's;complete as 1986 specified Each 1,416.00 1,416.00 $38.50 Thousand Furnish switch ties;complete Board 1987 as specified Foot 2.00 8.90 6.90 $1,900.00 $13,110.00 Furnish ballast;complete as 1988 specified Net Tons 2,48100 2,483.00 $13.50 Place ballast and surface 1989 track;complete as specified Net Tons 2,483.00 2,483.00 $9.00 Furnish and install rail anchors;complete as 1990 specified Each 1,917.00 1,917.00 $3.00 Furnish and install new sliding derail;complete as 1991 specified Each 2.00 MO $3,950.00 Furnish and install joint insulation;complete as 1992 specified Each 4.00 4.00 $550.00 Furnish and install steel bumping post;complete as 1993 specified Each 2.00 2.00 $7,500.00 Page 1 of 4 CONTRACT 17-21 CHANGE ORDER#1 (FINAL) INCREASEIN DECREASE IN ITEM CONTRACT CONTRACT I DESCRIPTION UNIT INCREASE DECREASE CONTRACT INSTALLED NET NET UNIT PRICE NUMBER QUANTITY QUANTITIES CREA CREA PRICE PRICE Construct jointed track exclusive of ballast;complete Track 1994 as specified Feet 2,510.00 2,510.00 $25.00 Construct turnout;complete 1995 as specified- Each 2.00 2.00 $16,000.00 Construct walkway at turnouts;complete as 1996 specified Each 2.00 2.00 $3,500.00 Provide railroad insurance; Lump 1999 complete asspecified Sum 1.00 1.00 $8,500.00 Furnish and install 24"RCP Class V storm sewer; Linear 2017 complete as specified Feet 169.00 174.00 5.00 $69.00 $345.00 Furnish and install 36"RCP Class III storm sewer; Linear 2025 complete as specified Feet 58.00 42.00 -Moo $89.00 ($1,424,00) Furnish and install 48"RCP Class V storm sewer; Linear 2032 complete as specified Feet 79.00 64.00 -15.00 $157..00 ($2,355.00) Furnish and install 24"RCP Class III apron endwall with joint ties;complete as 2144 specified Each 3.00 3.00 $900.00 Furnish and install 36"RCP Class III apron endwall with joint ties;complete as 2147 specified Each 2.00 2.00 $1,700.00 Furnish and install 48"RCP Class III apron endwall with joint ties;complete as 2149 specified -- Each 1.00 1.00 $1,728,00 Furnish and install apron endwall grate;complete as 2199 specified Each 3.00 3.00 $1,507.00 Furnish and install standard storm sewer inlet manhole(6' x 6'box);complete as Vertical 2221 specified Feet 6.00 5.69 -0.31 $2,235.00 ($692,85 Furnish;install;maintain;and remove Type D modified inlet protection;complete as 2508 specified Each 2,00 0.00 -2M $100.00 ($200.00) Sediment removal-Type D modified inlet protection; 2510 complete asspecified Each 8.00 0.00 -8.00 $5.00 -($40.00) Furnish;install;maintain;and remove stone tracking pad; 2512 complete as specified Each 2.00 1.00 -1.00 $2,000.00 ($2,000.00) Furnish;install;maintain;and remove silt fence;complete Linear specified Feet 2,379,00 2.889 2514 as speci .50 510.50 $2.00 $1,021.00-- Furnish;install;maintain;and remove ditch check; 2522 complete asspecified Each 8.00 17.00 9.00 $75.00 $675.00 Install salvaged topsoil 6" Square 2602 depth;complete asspecified Yards 1,920.00 10,222,56E=8302.56 $2.50 $20,756.40 Page 2 of 4 CONTRACT 17-21 CHANGE ORDER#i (FINAL) INCREASEIN DECREASE IN ITEM UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION QUANTITY QUANTITIES INCREASE DECREASE PRICE PRMF PRICE Furnish and install native seeding;complete as Square ($133.07 2610 specified Yards 647.00 558.29 -88.71 $1.50 Furnish and install WDOT Seed Mixture No.20 with fertilizer;complete as Square $5,574,84 2621 specified Yards 1,645.00 9,609-06 7964.06 $0.70 Furnish and install no-mow Square 2622 fescue;complete asspecified Yards 25.00 5511 30.21 $1.50 $45.32 Furnish and install trees; 2626 complete asspecified Each 7.00 7.00 $425.00 Furnish and install Class It; Type B erosion control mat; Square 2634 complete as specified Yards 1,246.00 1,821.18 575.18 $2.26 $1,294.16 Furnish and install turf reinforcement mat system; Square 2638 complete as specified Yards 647,00 616.00 -31.00 $7,00 ($217.00) Furnish and install light rip- rap with filter fabric;complete Square 2646 asspecified Yards 242.00 52.31 -189.69 $10.00 1 ($1,896-90)1 SECTION I-(BID ITEMS 1010 -2646)-SUBTOTAL $44,393.94 ($60,467.12) NET DECREASE TO SECTION 1: ($6,063.18) ALTERNATE INCREASEIN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Crush salvaged concrete; 3/4"dense gradation; B-100 complete asspecified Tons 6,500.00 11,178.00 4,678.00 $4.50 $21,051.00 Salvaged crushed concrete B-500 credit;complete as specified Tons 6,500.00 6,842.00 342.00 ($4.80) ($1,641.60) Install salvaged topsoil 6" Square B-2602 depth;complete as specified Yards 6,600.00 6,658.82 58.82 $1.25 $73.52 Furnish and install turf grass; Square B-2620 com I teas specified Yards 6,600.00 6,658.82 58.82 $0.70 $41.17 Furnish and install straw Square B-2654 mulch:complete asspecified Yards , 6,600.00 6,658.82 58.82 $0.30 $17.65 ALTERNATE B(ITEMS B-100-B-2664)-SUBTOTAL $19,5411.74 $0.00 NET INCREASE TO ALTERNATE B: $19,641.74 ADDITIONAL WORK REQUIRED:CO#1 ITEM BID INSTALLED NET NET UNIT INCREASEIN DECREASEINCONTRACT CONTRACT DESCRIPTION UNIT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE Additional work to change structure from 42"pipe to 48" Lump 1-10000 pipe;complete asspecified Sum 0.00 1,00 1.00 $1,347.50 $1,347.50 Additional material cost to change apron endwall grate from 42"pipe to 48"pipe; Lump 1-10001 _complete as specified Sum 0.00 1.00 1.00 $385.88 $385.88 Page 3 of 4 CONTRACT 17-21 CHANGE ORDER#1 (FINAL) IT EM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT NUMBER PRICE PRICE Credit to use City provided 1- 1/4"crushed backfill in the Lump 1-10002 ramps;complete as specified Sum 0.00 1.00 1.00 ($3,549.00) ($3,549,00) Reinforce T-Posts on existing catwalk;complete as Lump 1-10003 specified Sum 0.00 1.00 1.00 $1,847.92 $1,847.92 Furnish and install Class 1; Type B erosion control mat; Square 1-10004 complete as specified Yards 0.00 3,309.79 3,309.79 $2,05 $6,785.07 Furnish and install straw Square 1-2654 mulch;complete as specified 1 Yards 1 0.00 4,475.59 4,475.59 $0.30 $1,342.68 ADDITIONAL WORK:CO#1(ITEMS 1-10000-1-2654)-SUBTOTAL $8,160.05 $0.00 NET INCREASE TO CO#11: $8,160.05 NET INCREASE $72,096.73 NET DECREASE ($50,457,12) NET INCREASE TO CONTRACT: $21,638.61 Page 4 of 4