Loading...
HomeMy WebLinkAboutProposal for Completion of 2018 Leak Detection Services /���� �� , . � ~ AEC0 �LCom sse North Main Street Oshkosh,VV|548O1 l(6C�{V�D aeoom.oum October 1Q. 2O18 Mc Bob Johnson 1W,y.CO� 4EC0N Proposal No. VNaterD�tribudonSuperintendent DQHKO�\\, v/\5��un�^m 757VV3"Avenue Oshkosh, Wisconsin 54BO1 Proposal for Completion of 2018 Leak Detection Services in Oshkosh,Wisconsin Dear Mr. Johnson, AECOM Technical Services, Inc. (\ECOM) is pleased to Submit this proposal to conduct m Leak Detection Survey on approximately 100 miles of water main in the City of Oshkosh (City)'s water distribution system in 2018. AECOMhao been completing this work for the City for over 10yoam. Our field staff are very familiar with the City water distribution's design, and layout in the City. VVe have worked closely with City staff hm verify the potential leak locations. This work iaa critical part of actively reducing the non-revenue water. This work|son important part ofthe water management best practice procedures as expected by the Public Service Commission. Our extensive - experience and understanding of the importance of this work allows AECOM to provide the service in an cost effective and efficient manner. The proposed services represent the second phase of investigation activities to be completed on the historic cycle of ^ leak detection survey activities to he completed onthe City'o Municipal Water Supply system. In 2D17wecompleted the first phase of the investigation activities. The 2018 scope of work(Phase 2)area io generally bounded by Oregon/Jackson Street to the east, Hwy 41 to the west, Oshkosh Avenue to the north, and 20th Avenue to the South. The third phase of this program |m anticipated for completion in281Q. The purpose of the annual surveys ietoidentify specific points of leakage such that system rehabilitation can be undertaken and lost water reduced. The remainder of this proposal discusses the scope of services to be comp|eted, achedu|a, information/assistance required from client and compensation. . OF WORK Services to be provided are as follows: ~ Meet with City to review existing water distribution systems maps, pertinent water system reports and the schedule for conducting the leak detection field services. ° Conduct a leak detection and location survey with sonic detection and computer correlation equipment on approximately 100 miles of the water distribution system. Physical contact will be made with the system at exposed valves and fire hydrants.After the initial sonic leak survey ofa portion of the system iucompleted, indications of leaks will be verified a second time,after which leaks will be located with a computer programmed leak correlator designed to identify leak locations without drill holes or excavations. Where leakage into a storm or sanitary sewer is suspected, a visual examination of the appropriate sewer will be conducted. All equipment used will be non-intrusive.Valves and hydrants will not normally require operation during the survey and pinpointing operations.This survey will be conducted primarily during normal working hours,with additional leak detection being conducted during late evening and/or early morning hours in areas of high traffic volume. � Prepare on inventory of defective system components such as vm|ves, hydmnta, meters and curb atope, which are noted in the course of carrying out field activities. ° AECO/N will furnish a fully equipped vehide, including all sonic leak detection equipment, tools and safety equipment for the duration of the project. Our Fluid Conservation System computer leak correlators will be utilized to pinpoint leaks. ° Prepare a yearly final report and submit three(3)copies of the report showing the results of the investigations. The report ahoU include e summary of the project and a list of leakage located by type, |oosdion, and estimated mAPxopoa*uo/ty of Osmy,axmpp-7ae1*o_o1o�mxoommmmopp�es/ao_�/o �mxoe�v�n p�yvs*/.uom' 1/4 ' AECOM quantity of leakage. The final report will contain recommendations for future work based on the results of this oumey. S01"IEDUIJE ° Leak Detection Phase:4-5weeks � Yearly Final Report: 2-4 weeks after field work ('1-!EN'T`S RES1,,,'10t4SIB11 ITIES Client, at its expense, shall do the following in a timely manner so as not to delay the Services: Furnish AECOM the following information/reports/assistance, all of which AECOM may rely upon without independent verification in performing the Services: * All available street maps and water distribution system maps. • One(1)experienced person with a good working knowledge of the water distribution system to assist on a part-time basis in field activities such ao location mf system components. ° Access to valves and curb stops by uncovering and cleaning valves and curb boxes,where required, prior to initiation of field activities, The City of Oshkosh agrees to hold harmless and indemnify AECOM against any liability arising out of the items above for which the City imresponsible, � I��E N T R E P R F,'H S E 1`4 TAT'I V E Designate a representative for the Project who shall have the authority to transmit instructions, receive information, interpret and define Client's policies, and make decisions with respect to the Services. COMPENSATION Compensation for the services as presented of this agreement will be on a lump sum basis as follows- 2018Semiceo(100mi|ee) General area bounded by Oregon/Jackson Street 0o the east, Hwy 41bo the west, $22.53833 Oshkosh Avenue hm the north, and 2O`"Avenuehx the south Project Management/Report Preparation $1.750.00 Total $24.288.83 Please note the lump sum fee will be adjusted if the segment length is reduced or increased, The above described scope of services will be performed in accordance with the negotiated AECOM and City of Oshkosh Terms and Conditions dated April 2OOA. VVa appreciate this opportunity to provide services tn the City ofOshkosh. |f you desire to proceed with these services please sign the attached authorization form and return to Paul Timm. |f you have any questions concerning the information contained herein. please feel free to contact us. Yours sincerely, AECDM Technical S es, Inc. �016 Tim Wolf J +UtK Thomas J. Holtan, P.E. Project Engineer I Wisconsin Water Leader � O° .~-- enc|: Authorization xVnmpoaAuCuru,00xm,ommpp-7as1s8_2n10 Leak oetectionmpP-rea1a8_2nm Leak Detection . . ' AECOM 55nNMain Street Oshkosh,Wiommmin549O1 920.2388710 A u tl"i o riz ati o n October 1@. 2O18 | hereby certify that the necessary provisions have been made to pay the liability,which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for the Completion of 2018 Leak Detection Services in the City of Oshkosh as described in AECOM's proposal OPP-765158 dated October 19, 2018,with a budget authorization of$24,288.83 under the general terms and conditions specified in the proposal. Sig6ature Date Mark ARoh|off Print Name City Manager - Signature Date Pamela R. Ubhg Print Name City Clerk TN Qgq� ~~~/v Date Lynn A. Loreneon Print Name City Attorney Title/Organization o/gnsuuna Date TnenoLmmon Print Name Director ofFinance Title/Organization x:\PnopoeAuC/tyo/oaxmmmopp-7aa1s�2o1u Leak oamcuo^`opp-res1oo_un1a Leak Detection pmFmsamocx ow AECOM I agree to accept invoices from AECOM via e-mail and not postal mail: Yes Signature: E-mail address: Recipient Mr/Ms: Return to: Name: Paul Timm 558 N. Main Street Address: Oshkosh,WI 54901 Phone: 920-236-6718 E-mail: KAPROPOSAL\City of Oshkosh\OPP-765158_2018 Leak Detection\OPP-765158-2018 Leak Detection Proposal.docx 4/4