HomeMy WebLinkAboutStormWater Maintence Agreement: Premier Ripple Road Inc. 33
CITY OF OSHKOSH
8 4 3 5 9 1 6
STORMWATER MANAGEMENT FACILITY Tx:4319552
MAINTENANCE AGREEMENT DOC* 1770563
Document Number Document Title NATAIAE STROHMEYER
REGISTER OF DEEDS
WINNEBAGO COUNTY, WX
RECORDED ON:
The City of Oshkosh,the Governing Body,and Premier Ripple Road,Inc.,the Property 07/16/201.8 09.10 AM
Owner, along with their successors and assigns,are the parties to this Agreement. The RECORDING FEE: 30-00
purpose of this Agreement is to ensure adequate storm water drainage facilities for the PAGES: 11
Property described in this Agreement in connection with the surrounding public storm
water facilities. The consideration for this Agreement includes the City's approval of
proposed development on the Property. Additional consideration includes the Property
owner's clearer understanding of storm water drainage obligations for the Property,and
the Governing Body's assurance that the storm water drainage issues relating to the
property can be more easily achieved through this Agreement, Recording Area
CURRENT PROPERTY OWNERS SUBJECT TO THIS AGREEMENT: Name & Return Address:
Oshkosh City Attorney's Office
Premier Ripple Road,Inc. PO Box 1130
3120 Gateway Road Oshkosh,WI 54903-1130
Brookfield,WI 53045 Tax Parcel Numbers:
91411230100
GOVERNING BODY: City of Oshkosh
PROPERTY SUBJECT TO THIS AGREEMENT
The Property subject to this Agreement is Lot 1 of Certified Survey Map 7251,a copy of which is attached hereto and incorporated
herein as Exhibit"A", located in the City of Oshkosh,Winnebago County,and is more particularly described as follows:
Lot I of Certified Survey Map 7251 as recorded with the Winnebago County Register of Deeds
on August 18,2017, as Document Number 1747144, located within the Northwest Quarter of the Northwest Quarter
(NW V4of the NW V4),Section Twelve(12),Township Seventeen(17)North,Range Sixteen(16)East,In the City of
Oshkosh,Winnebago County,Wisconsin.
GRADING AND DRAINAGE PLAN
The Property must always comply with the grading and drainage plan approved by the City. The approved grading and drainage plan
may be amended or modified from time to time after consultation with the Property owner. Compliance will be evaluated according to
the most current approved plan. A small scale version of the current grading and drainage plan is attached as Exhibit"B"for
identification and reference purposes. The full scale grading and drainage plan is on file for review with the City Department of Public
Works,and will be used to provide grading and drainage criteria and to govern compliance and any disputes.
PURPOSE
The three(3)primary purposes of this Agreement:
1)Notify the Property owner,as well as anyone interested in or connected to the Property that the Property is subject to this Agreement
and Chapter 14 of the Oshkosh Municipal Code,as amended,and that any owner of the Property assumes these obligations;and,
2)Identify specific storm water facilities that currently exist on the Property,or may be constructed or installed in the future;and,
3)Describe the minimum responsibilities for maintaining the Property's approved storm water management facilities and grading and
drainage plan.
March 6,2018
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANcF,AGREEMENT
Document Number Document Title
RESTRICTIONS
The Property must always conform to its most current grading and drainage plan approved by the City, The Property is also subject to
all aspects of the Municipal Code, including storm water management requirements,as may be amended,which are currently located in.
Chapter 14 of the Municipal Code. The storm water management requirements of the Municipal Code change from time to time,with
the Property owner receiving public notice as required by law. Changes may be made to the grading and drainage plan for the Property
if requested by the Property owner and after review of any changed circumstances on the Property. The approved grading and drainage
plan for the Property will be on file in the City of Oshkosh Department of Public Works and is fully incorporated by reference in this
Agreement.
RESPONSIBLE PARTIES
The Property Owner is responsible for carrying out the requirements of this Agreement. If there is more than one Property Owner,then
the responsibility is joint and several, Property Owner responsibilities include maintaining approved vegetation,grading,drainage,and
storm water facilities on the Property, The terms of this Agreement attach to the,property in perpetuity and therefore pass to heirs,
successors,and assigns.
STORM WATER FACILITIES
The Property's storm water facilities consist of-
1. Wet Storm Water Detention Basin;and,
2. Swales;and
3. Storm Sewer.
INSPECTION AND MAINTENANCE
All storm water facilities and components of the storm water system shall be inspected at least semiannually,with one inspection
occurring in early spring and one inspection occurring in early autumn. The Property's storm water drainage system must also be
inspected after major storm events. The storm water facilities and grading and drainage scheme must be maintained as designed in
order to achieve the desired storm water drainage objectives. Therefore,maintenance and repairs must be performed expeditiously
when system deficiencies are identified. The existence of soil erosion,clogged or damaged inlets and/or pipes,sedimentation of the
basin and/or biofilter,rilling of side slopes,and other damaged features of the stormwater system are examples of items requiring
maintenance or repair work. Material removed from the basin or biofilter may require special handling dependent upon current
Wisconsin Department of Natural Resources disposal practices.
If a biofilter is installed/constructed,then biofilter maintenance activities include:remove coarse and gravel sediment that has
accumulated;maintaining proper level of mulch; inspecting surface and repair eroded areas; inspect filter strip rip-rap and repair as
needed; inspect energy dissipator rock or grass inlet areas;inspect overflow structures;replace filter bed;inspect perforated pipe under
drain;remove litter and debris;water plants;replace dying plants;and replace vegetation when necessary. Biofilter inspection and
maintenance requirements applicable to the Property will change as the rules enforced by the Governing Body change.
If a wet basin is installed/constructed,then dredging operations are required to remove the excess sediment when the depth of water in
the wet detention basin diminishes below three feet causing the efficiency of the detention basin to decrease. The storm water detention
basin(s)must retain the safety shelf after dredging. Damage to the safety shelf or detention basin liner must be repaired to preserve the
safety and operation of the facilities.
If a dry basin and/or swale is installed/constructed,then dry basin and swale maintenance includes removal of trash and debris,
repairing erosion,maintaining vegetation,and dredging when necessary.
The examples of maintenance activities that are identified above are not intended to be complete. The minimum information required
to be viewed as a guideline for potential maintenance or repair activities is identified in the Inspection and Maintenance Logs attached
March 6,2018
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
as Exhibit"C". The Property owner shall,upon request,make available for inspection all maintenance records to the City's
Department of Public Works,or any agent of the City,during the life of the system.
PROHIBITIONS
Mowing in buffer areas,detention basin banks and drainage ways shall be minimized in order to maximize filtration of runoff. If
occasional mowing is necessary,the mowing height must not be less than six inches. Applications of fertilizers,herbicides,pesticide or
other chemical applications are prohibited in buffer areas,on detention basin banks and along drainage ways.
COMPLIANCE
The Property benefits from a properly maintained grading and drainage plan as well as properly maintained storm water facilities. In
the event the Property owner fails to perform any obligation related to this Agreement,the City of Oshkosh shall have the authority to
enter the private Property to inspect,maintain,repair,reconstruct,and/or modify any component of the approved grading and drainage
plan or storm water facility. The City has no duty to take such action but may do so at its discretion. The ability to enter the Property
and take such action is not an exclusive remedy,and the City may take any lawful action to enforce this Agreement and/or the
Municipal Code. The Property owner grants to the City of Oshkosh a limited,nonexclusive easement in perpetuity over the Property
for the purpose of addressing grading and drainage deficiencies,as well as providing reasonable and necessary access to any storm
water facility that is located on or within the Property. The City of Oshkosh shall use only that part of the Property reasonably
necessary to allow the inspection,maintenance,and/or repair of the approved grading and drainage plan or any storm water facility. If
the City elects to perform maintenance or repairs on the Property,then all associated costs for performing this work and enforcing this
Agreement and/or storm water management requirements of Chapter 14 of the Municipal Code,as may be amended from time to time,
are subject to reimbursement from Property owners,jointly and severally, or through encumbrances on the Property itself.
Reimbursement remedies include placing an encumbrance against the Property as a Special Charge for Current Services pursuant to
Sec.66.0627 Wisconsin Statutes,as amended,or through other methods to collect directly from the Property owner as allowed by law
at the City's discretion. Any Special Charge for Current Services shall be a lien on the Property and shall be collected with the real
estate taxes,The Property owner affirmatively waives notice requirements for Special Charges, and this provision shall constitute the
Property owner's,and any respective lot/parcel owner(s)if applicable,waiver of notice of hearing otherwise required by Sections
66,0627 or 66.0703 of the Wisconsin Statutes. The storm water management facilities shall be for the benefit of the City of Oshkosh
and the Property as described in this Agreement, This Agreement is not intended to benefit third parties and there shall be no third
party beneficiaries.
RECORDING
This agreement shall be recorded with the land records of the Winnebago County,Wisconsin,Register of Deeds,and Premier Ripple
Road,Inc.,shall bear the cost of recording this document.
AMENDMENTS
This Agreement may be amended in whole or in part at any time by the owner of the Property,provided: 1)the amendment(s)are
approved in writing by the owners of a majority of the lots within the Property as recorded with the Register of Deeds,Winnebago
County,Wisconsin;and,2)the amendment(s)are approved in writing by the City of Oshkosh Board of Public Works. This
Agreement shall be a permanent covenant that shall,as provided by law,run with the land and any amendment to this Agreement shall
be subject to the prior approval by the City of Oshkosh.
SIGNATURES ON FOLLOWING PAGE
March 6,2018
i
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE.AGREEMENT
Document Number Document Title
�,�`��`11111111fl/l/lll//,
For the Owner/Developer. ,,���`( .. .. y,�frrr
PREMIER RIPPLE,ROAD, C. o'l A R y �
p( 81.�G
Brian K.Solsrud,Managing Member - '�,r�1" aFt����4aM,�
STATE OF WISCONSI1+1
ss.
! COUNTY )
f
IPersonally came before me this day of ..lt 1)e.. _._. , 2018, the above named Brian K. Solsrud, to me
known to be such person who executed the foregoing instrument and acknowledged the same, for the purpose herein
contained,
i otary Public,Stat f Wisconsin
r
My Commission expires.
.For the City of Oshkosh:
Mark A.Rohloff,City Manager Pamela R.T
g Jbrig,City Clerk
State of Wisconsin )
ss.
Winnebago County )
e .
Personally came before me on this�W...day of �� -,2018,the above named,Mark A.Rohloff and
Pamela R.Ubrig,to me known to be the persons who �ed the foregoing instrume n� acknowledged the
same.
_._
o ary Pu�ic, t o of W iso,o siin
M comni'Oio expires:
ry7
✓
Approved as to form:
D � ,
I, Lorenson, A orney
This document was drafted by:
David J.Praska
Deputy City Attorney
Oshkosh,WI 54903-1130
March h,2018
� i''"'I' liNllllllllIllll I�
WINNEBAGO COUNTY CERTIFIED SURVEY MAP NO. 770 S I
Pan of the NW 114 of the 14W 114,Sacilon 12M7N,RISE.In the City of Oshkosh,Wrinebago County,ftcons(n,
MY COMM 1"OF11MCKWOLF
(nLTiV44VISS RIPPLE AVENUE
",COMM.FOUND) CILAk"Aammew 10901CAIIE0 TO THE AMM N114 Comm
N&OF THEfM 114 3&M$O.M 10,1Z TITH40M
-A PIPFlum i A--------- -iT-
4
-------007—
Z,'U11LITYEASWENT
';eS$8EST2OF2
-Ar OWNERS CERTIPICATO,
MMr-qM
RM6 1201S
pvt Ronk?DATED 111201S
EaLTA A 0XSnA*
aDrt.NWO
LOT 2
JI LOT 1
643,214 SQFT. 152,583 SQ,Fr.
(3,50 ACRES) 6 6
(14.77 ACRES) rj
5 iXU7UrY9ASMeM LANDS DEDICATED
S96SH96T2OF2
W TO THE PUBLIC FOR
1 ff PARKPURPOSES
MMERS CERTIFICATE. LEGEND
0 -I"X24*AESARSET
5 (DEDICATED TO THE MUD) WFJM4INGs,14LSSJUN.FT;.
$2-12 SOM.
0 At*rRON PIPE FOUND ry
Mir
238-57
S8
9'2S32
-W iZA&5'4 NOTe
OWNEFt$tDVUOPMHOMY GRANT PER'MMDOCUYONT
ACROSS ACCESS EASEMENT FOR LOTS I&3TO EACH OTHER
FOR ACCESS TO O.T.H,*r OREGON STREET.AND FUPP"AVSNUG
SEE SHEET 2 OF2 OWNERS CERTIFICAM
T-4 S&S141,-3202
LOT 3
716,722 SQ,M
(16,45ACRES)
ill t"9
Pi
CKII
bo
q su R,
z
SURVEYOR'S; CERTIFICATE
1,Kelth W,Walansid,PraresslonalWisconsin Land Surveyor,cerlify that t have surveyed,divided,and mapped pad of
the Northwest Ouarttr Drina NorIhvAst Ovarter(NW 1/4 of the NW 1/4),Soctlon Twelve(12N Township Sevanteen(17)
WIA CIORRaA Nonh,Range Sbuan(16)East.In the Cftyot Oshkosh,W&nnabago County,WL%oorWn,des;cdbtd as follows.: .
Commencing etthe Northwest comer orsaW Seaton 12,thence N8928'3M 14840 Feet iothe PoIntorbe9twinq:
thancozonUmIrV N89'28'32T-,1182.117 feet,that"S00'111'416`W,1324.27 feet;thence SMM'W.906.441reaV,
thane N00'D012'W,130.00 feel,thence S8932%*W,200.00 feet thence N00100112W.360AI feet thence
S89*32120W,143.86 feat thanco N001022M 410.17 fact;thence Northewurty,along the are ore curve to the right,
331.07 feet,the chord of which beam NOOIOME,331.07 144 thcroa N44452T,129.?4 feet to the polm;of
beginning.
W+E That I have made such Survey,map and land dIvIslon as shown hereon,undarih&dIrecdon orowners of skid lands.
That this map Is a correct represontatton or the exterior boundary llnes or the land surveyed.
That I have hilly complied With the proutslons,of Chapter 236,34 of the,Wisconsin Statutes In surveying.dIVIdInq and
mapping the some,and the City of Oshkosh Subdivision Ordinance.
yy
041*01r*taruvrKed to the,NIL at
the MW1(4,Satfan1ZT17NR16F.
Kafth W.Walanskf FLS Data recordbd ta bwN&S128W"F.
0 M err .w
HARRIS
F-1 ASSOCIATES, INC, Mi 020)rw&1=404i
Coh"T44 CHOP'"KS 1A14=1 1, 1 tfth Von. pturasme i;w'
SHEET 1 OF 2
Exhibit "0
WINNEBAGO COUNTY CERTIFIE6SURVEY MAP NO.
OWNERS CERTIFICATE
As oWnO's ' 8'0 Inc.,we hereby certify that we caused the land dogetibed on this Certified
Survey W,�pt'b-'b�1vrvaPV0Z,-dividiid,dedicated and rnopped as represented.
As Owners,we also hereby certify that we hereby cause the dedication of a Cross Access Easement
as noted and represented on this map and do Grant to the Owners of Lots I and 3 its successors and
assigns the same by this Document.
As Owners,we also hereby certify that we hereby cause the dedication of a 12 Foot Public Willy
Easement as noted and reprosonted on this map and do Grant the same by this Document
am P ell Dat
JKJ Developers,Ina.
State of Wisconslin
Winnebago County)
Petscrially came before me thts_L9! day of W&0'3
the ,named parsons
to me known to be the persons who executed the foregoing instrument an aZnOwt0dqq
Ib same,
all
Notary Public �4q
My,'mr,
My com 0 expi s rd
CERTIFICATE
-IN
ERTIFICATE 0 THE�C OF 40SHKOSH PLAN
Approved Plan Commission on this -day of .2017,
,�ddI fOshk h
C 0 Os
CERTIFICATE OF THE OSHKOSH CITY CLERK
City
Date
Uve
As the duty appointed city Clark for the City or Oshkosh,I hereby carflfy-Ihat the records In the My Clerk's
office show that there are no unpaid taxes or unpaid special assessments affecting any Of the lands Included
in
thU Certified Survey Me
D! is. I C--3d .2017.
*?
City Ct.rk Det�
Pamela R. brig, I ark Date
TREASURER'S CERTIFICATE
I certifythat ftre am no unpaid taxes or unpaid speclat assessments On any Oftha lands Tnduded In this
Certified Survey Map. '
0"M 747144
RemTF-RIS or
WINN EBAsGO COUNTY,-FICE W1
fry RECORDED ON
W.WAMRSKI 3 Os/I8/2017 12:44 PM
S,'= NATALIE STnOHMEYER
APM—MIN10 REGISTER OF DEED
VA
"*liDa iF'
RECO BE 30.00
SU PAGES-2
IOU
SHEF-T20F2 Capture tereen naiv t.S-9545
gi
EXhibit "A"
� a Iw1� wM
ws�S a95 •..
N
INas
r
�N
i• F�
i I litop
wit
nil� ;
►.owwwwwwwrrw
ON
a; .r�r�ror r� .,..'-♦..!ter*-- :..,._.... +� ...... �'r�� r
���`.r"-"ors' =:.�.�'�''.'. =--_-.""'�'—,'�'+�r ivs�.."'"^'�`r�.�rr�` _.�,Yl+�lww�r♦�'=��...,.""� ""ri+ri!!I!
Inspection & Maintenance Log
Detention Basin
Inspection Year:
Name of Site: Address:
Inspector: Company:
Municipality Phone:
Contact:
Facility owner responsible for Inspecting, maintaining, and repairing facility components after major
storm events(greater than %"), annually at a minimum. Check any deficiencies noted and comment
for maintenance actions taken, date of repair, and any alerts. Inspection items with no*should be
completed by a qualified professional every five years (or more frequently If concerns are noted).
Inspection Item Storm Storm Storm Maintenance Action Date
Date Date Date
Pond
Bank Erosion
Debris/Trash Accumulation
Visible pollution*
Abnormal water levels
Sediment Accumulation
Depressions,Whirlpools, Sinkholes
Embankment
1. Upstream Slope- Poor Grass Cover*
Erosion or Slides
Trees/Brush Growing on Slopes
Deficient Rlprap Protection
Animal Burrows
Depressions or Bulges
Settlement
Longitudinal Cracks
Transverse Cracks
Exhibit "C"
Page 1 of 4 Rev.02/22/2008
Inspection & Maintenance Log
Detention Basin
Inspection Item Storm Storm Storm Maintenance Action Date
Date Date Date
2. Crest—Settlement*
Misalignment
Cracking
3. Downstream Slope- Poor Grass
Cover
Erosion or Slides
Trees/Brush Growing on Slopes
Animal Burrows*
Excessive or Cloudy Seepage
Longitudinal Cracks
Transverse Cracks
Depressions or Bulges
Settlement
Seeps, leaks, or boils
Exhibit "C"
Page 2 of 4 Rev.02/22/200B
Inspection & Maintenance Log
Detention Basin
Inspection Item Storm Storm Storm Maintenance Action Date
Date Date Date
4. Emergency Spillway—Exposed
Fabric*
Overgrown Vegetation
Erosion/Backcutting at berm or road*
Rutting or pot-holes
Obstructions or debris
Inadequate Nprap/Armor
Cracking
Slumping/Sloughing of Embankment
Settlement
Spillway
1. Eroding or Backoutting
Overgrown Vegetation
Obstructions with Debris
Excessive Siltation
Slumping/Sloughing
Control Structure
1. Inlet- Debris In Conveyance Area
Erosion or Undercutting*
Stop-fog deterioration/leaking
Joint Separation
Cracks In Concrete
Deteriorated piping
Displacement of Structure
Exhibit "C"
Page 3 of 4 Rev,02/22/2008
t ,
Inspection & Maintenance Log
Detention Basin
2. Outlet- Erosion or Backcutting
Debris In Culvert or Trash Rack
Undermining/Scour*
Inoperable control valve
Inoperable flap gate
Joint Separation
Cracks in Concrete
Downstream Area
1. Erosion*
Debris/Obstructions
2. Bridge/Culvert Problems
Buildings Issues
Foundation Concerns
Exhibit "C"
Page 4 of 4 Rev.02/2-2/2008