HomeMy WebLinkAboutAmendment Request No 2- Marion Water Tower Replacement �� ���� ��
� ������
. AscoM
�LCom 558 North Main Street
Oshkosh,vw5490,
- oecum.com
�� -
� r"EcL' Date
�— August 2O, 2D18
AECOK0 Project No.
60520583
James Rabe, PE, CpESC yY�
Mr.
Director ofPublic Works
City cfOshkosh
215 Church Avenue
Oshkosh, VV| 54QD1
Amendment Request Number 2 for Construction Monitoring and Documentation Services to
City Contract16-22, Marion Water Tower Replacement, C1b/ Resolution Number16~448
Dear Mr. Rabe,
AEC(}N1 Technical Services, Inc. (4ECON1) is requesting on amendment to the agreement dated
September 8. 2O1G. (4ECDrN Proposal No. OPP-642187) and Amendment 1 dated July 13. 2O17. for
Construction Monitoring and Documentation Services Related to City of Oshkosh Contract 16-22 KAahun
Road Water Tower Replacement. This amendment request is for additional effort required to complete the
Construction Monitoring and Documentation. The additional effort includes:
1. Increase in documentation and materials testing related to the fence support pier construction, .
including additional subcontracted laboratory material testing services.
a. The original scope of work included construction in normal weather conditions. The fence piers
are constructed out of combination of masonry, bhok, mortar and grout which are very
temperature sensitive. Since the contractor completed the work in winter conditions (i.e. below
freezing temperatures) additional documentation, field and laboratory testing were initiated in on
effort to aaauea Project Document compliance. Approximately 43 hours of additional field
dooumen(ehon, office work, and $500 of subcontracted laboratory costs were required. This
work item was not included in the original scope of work. '
2. /\ddihmno| site visits to document proper disposal of impacted groundwater to sanitary sewer.
a. The Contractor and all the subcontractors had to be reminded at each dewmtering event that all
groundwater had to be discharged to the sanitary sewer in compliance with the Sanitary
Discharge Permit. Accurate documentation records are required tn verify sanitary discharge
costs. Approximately 8 hours of additional field documentation was required.
3. Additional site visits to document the contractor time and materials effort to remove the former water
tower foundations.
a. During demolition of the former water tower, the foundations were discovered to be significantly
larger than the available record drawings indicated. The Contractor requested a lump sum
change order due to that change in conditions. The Contractor was instructed to proceed with
removal under a time and materials basis. In an effort toverify and track the ooata, additional
documentation of the foundation removal was required. Approximately 1O hours wffield
documentation and office work was required. This work item was not included in the original
scope ofwork.
4. Additional site visits to provide manifests for disposal of impacted soil stockpiled on the site during
construction activities. Approximately 8 hours of additional field documentation was required.
Additional impacted soil was generated during final site grading and was not originally anticipated the
original scope of work. This material could not be reused on site and because it was solid waste it
had to be disposed of at a licensed landfill in compliance with the material management plan.
G. Documentation of the parking |otsubgrede preparation and asphalt paving. Approximately hours of
field documentation was required. This work item was not included in the original scope of work.
uAp m ,ionnvmawate,rvwe,nwnuu'comrnAcnl`o'ouswr
cownxAcrausuosua_Amenumomu,xv'x 1^*
^
' ^
AECOM
Revio�dBud�ed
VVa are requesting that the budget be increased by$8.7UG. This increase hl budget will cover the
additional services required tu complete the project.
The services provided will be performed in accordance with the Negotiated Fee Schedule and conditions
of the General Conditions of Service—City of bshkosh,April 2009, which are expressly incorporated into,
and are on integral part of, our agreement for professional services.
If you have any questions or need to clarify a point, please call any of the undersigned at
920-236-6718.
Yours sincerely,
ce| Bemioea. |nc.
Pau|V� Timm Kevin L Brehm
. PE (VV|) V»Yv~
Senior Account Manager Associate Vice President
end: Amendment wAgreement
Authorization
Road Water Tower cmn00-cowr*xcnl 10-Cusmr
oowre*cn60520583-Amenumwm2,uvcx uw
' emm Main Street
AECOM Oshkosh,Wisconsin s49o1
mzu,oXonn
A,rn �cfiMMwii'0tD ������HN��t
Amendment No. 2
Construction Monitoring and Documentation Services
Marion Road Water Tower Replacement Y6-22
/\ECOK8 Project No. 60S2U6O3
City of Oshkosh Resolution No. 16-448
RETURN TO: AECC}K8 Date:August 2O. 3O18
658 North Main Street
Dshkuah. VV| 54981
Attention: Paul Timm
SUMMARY: Original Contract Amount: $79.590.00
Total Previous Amendments: $30.687,50
Amount this Amendment: $8,70500
Revised Contract Amount $118'982.50
Tash# DESCRIPTION /\KOOU0T
1 Fence Documentation $5.446 ,
2 Impacted groundwater disposal documentation $930
3 Removal of oversized foundation documentation $1.200
4 Solid Waste soil disposal documentation $680
G Parking lot documentation $460
TOTAL $8'705
KAProjects\60520583 Marion Road Water Tower
GM\1 00-CONTRAcm1c-C LIE NT
oomrnAcnaoacosoa/Ar`ormrnemtz,aocx 3/4
"
AECOM
A t,,i U(-,�o ir�� �o n
August 2O. 2O18
1 hereby certify that the necessary provisions have been made to pay the liability which will accrue under
this contract.
I hereby authorize AECOM to proceed with the scope of work outlined in Amendment 2, to amend
AECOKA's proposal {}PP-542187. dated September 8. 2O16 and Amendment 1 dated July 13. 2O17for
additional Construction Monitoring and Documentation Services related to the proposed Marion Road
Water Tower Replacement Contract 16-22 with a revised budget authorization of$118,982.50 under the
general terms and conditions specified in the proposal.
Signat6re Date
Mark Roh|cff
Print Name
City Manager
Title/Organization
Signature Date
Pamela R. Ubh8
Print Name
City Clerk
Title
at e Date
Lynn A. Loremm
CUyAttomey
Signatune� Date
TrenaLmmon
Print Name
Director mfFinance
KAProjectsU520583 MarionRoad Water Tower cmnuocowrRxon,I O-c LIE wr
cowrnAon60520663-Amename^t2.uvcx =/4