HomeMy WebLinkAboutChange Order No 1- Vinton Construcation Co J) I A & r City ofv Oshkosh October 8, 2018 Mr. Ron Raboine Vinton Construction Company PO Box 1.987 Manitowoc, WI 54221-1987 RE: Change Order No. 1 Contract 17-19 Dear Mr. Raboine: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Vinton Construction Company regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, mes Rabe, P.E., CPESC Director of Public Works JER/tlt Enclosure: Change Order No. 1. cc: Pam'Ubrig, City Clerk (w/original) Jennifer Messerschmidt, Assistant Finance Director (w/copy) File (w/original) E\rngincering\2017 CONTRACT'S\17-19 Aviation Wtr MnVroject-Informat ion\Contract Info\Change Orders\17-19 Executed C,'0#1-10-8-18.docx Page 1 of 1 City Hall,215 Church Avenue P.O. Box 1130 Oshkosh,WI 54903-1130 http://WWW,Ci.oShkosh.wi,us TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER#1 P.O. BOX 1987 DATE- SEPTEMBER 12, 2018 MANITOWOC, W1 54221-1987 Your present contract with the City of Oshkosh,Contract No. 17-19,awarded July 25,2017, is hereby amended and changed as follows: NET INCREASE: $137,990.00 NET DECREASE: $0.00 NET INCREASE TO CONTRACT $137,990.00 TOTALS BID TOTAL 3.98 0'5*i-6.98 co#1 $137,990,00 $137,990.00 CONTRACT TOTAL $1,736,103.98 $1,736,103.98 CITY OF OSHKOSH BY: City Manager �J City Clerk Approved and accepted: �nYtractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. J' Comptroller Approved form: City Mtorneil') VINTON CONSTRUCTION COMPANY...Road Contractors An Equal Opportunity Employer .!1►y. P.O. Box 1987 INTON -' 2705 N. Rapids !l oad -' ""'` Manitowoc, Wisconsin 54221-1987 - Office 920-682-0376 Fax 920-682-2838 Attn : Justin Gierach, P.E. 8/31/2018 City of Oshkosh - Engineering Division Re: Project 17-19 Aviation Business Park Water Main Loop RE: Field Order 1 Install the Ripple Ave Pressure Regulating Valve (PRV) Station Work to include as follows: Notice of Mobilization Coordinate Flushing of water main Coordinate delivery of owner purchased materials Off load materials Excavate, shoring, subbase and concrete foundation slab, Set PRV Station and anchor to slab. Furnish and Install Connections and valuing to connect PRV Station to system, including disinfection Install sump pump discharge and exhaust system supply and piping external to Vault Coordinate electric Service with WPS(WPS fees paid by City) Provide and install electrical system per installation drawings Install Cathodic Protection System Provide and install telemetry antenna pole. Coordinate and assist Radio Communication Supplier. Barricading and protecting the site Restore work site as required Total $ 137,990.00 If a 3" OD pole is required for and Antenna at the Waukau Site ADD $6,752�00 if you have any questions please feel to call. Sincerely, Ronald J. Raboine Vinton Construction Co. CONTRACT 17.19 CHANGE ORDER#1 AVIATION BUSINESS PARK WATER MAIN LOOP ADDITIONAL WORK REQUIRED:CO#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT Install the Ripple Avenue Pressure Regulating Valve (PRV)Station;complete as FO1 Ispecified I Stations 1 0.00 1 1.00 1 1.00 $137,990.00 1 $137,990.00 $137,990.00 $0.00 NET INCREASE: $137,990.00 NET INCREASE $137,990.00 NET DECREASE $0.00 NET INCREASE TO CONTRACT: _$137,990.00 Page 1 of 1