HomeMy WebLinkAboutChange Order No 1- Wood Sewer & Excavating141
City
�
Oshkosh
April 17, 2020
Sue Wood
Wood Sewer & Excavating
E9238 County Road X
New London, WI 54961
RE: Change Order No. 1(Final)
Contract 19-12
Dear Sue:
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of
Oshkosh and Wood Sewer & Excavating regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
es Rabe, P.E., CkES
Director of Public Works
Jmtlt
Enclosure: Change Order No.1 (Final)
cc: Pam Ubrig, City Clerk (w/original)
Jennifer Messerschmidt, Assistant Finance Director (w/copy)
File (w/original)
RECEIVED
APR 20 2020
CITY CLERK'S OFFICE
l:\Engineering\2019CONTRAC75\19-12Misc Utl\ProjecLI.f. H.\Co.t auto\Change
Orders\19-12 Executed CO Rl (Final) Ltr 419-20.d=
Page 1 of 1
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 hitp://www.ci.oshkosh.wi.us
TO: WOOD SEWER & EXCAVATING
E9238 COUNTY ROAD X
NEW LONDON, WI 54961
CHANGE ORDER #1 (FINAL)
DATE: MARCH 6, 2020
Your present contract with the City of Oshkosh, Contract No. 19-12, awarded May 28, 2019, is hereby
amended and changed as follows:
NET DECREASE TO SECTION I:
($442.66)
NET INCREASE TO ADDITIONAL WORK:
$5,825.00
NET INCREASE TO CONTRACT
$5,382.34
SECTION I
TOTALS
BID TOTAL $594,444.50
$594,444.60
CO #1 $5,382.34
$5,382.34
CONTRACT TOTAL $599,826.84
$599,826.84
CITY OF OSHKOSH
BY: / —
c City Man ger
City Clerk
Approve and a cepted:
Contractor Grss I-.067 and
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order. /W
Comptrol er
:►I.t I�,rr., ► ..ar
CONTRACT 19-12 CHANGE ORDER #1 (FINAL)
19-12
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASE IN
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACTPRICE
Removing pavement;
Square
IWO
complete ass ecifed
Yards
1,912.00
1,187.16
-724.84
$3.00
$2,174.52
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120
specified
Feet
1.390.00
647.92
-742.08
$3.00
$2,226.24
Unclassified excavation;
Cubic
1200
complete ass ecified
Yards
522.00
322.90
-199.10
$12.00
$2,389.20
7" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
Square
1308
asspecified
Yards
160.00
146.40
-13.60
$110.00
$1,496.00
Adjust manholes and inlets;
1360
l complete ass ecified
Each
5.00
6.001
1.00
$400.00
$400.00
Turf restoration on Kentucky
Square
1370A
Street; complete asspecified
Yards
124.60
111.50
-13.10
$15.00
$196.50
Turf restoration on Omro
Square
1370E
Road; complete ass specified
Yards
240.80
693.10
452.30
$15.00
$6,784.50
Turf restoration on North
Westhaven Drive; complete
Square
1370C
ass specified
Yards
94.60
0.00
-94.60
$15.00F$2
$1,419.00
4" concrete sidewalk with 3"
CABC and grading; complete
Square
1500
as specified
Feet
1,155.00
513.77
-641.23
$8.50$5,450.46
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
1510
specified
Feet
105.00
130.99
25.99
$9.00
No. 4 reinforcing rods -
deformed; epoxy -coated;
Linear
1550
complete asspecified
Feet
120.00
66.00
-54.00
$1.20$64.80
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
-
1560
complete asspecified
Each
12.00
24.00
12.00
$10.00Locate
existing property
monuments; complete as
1650
s ecified
Each
14.00
9.00
-5.00
$200.00$1,000.00Replace
existing property
monuments; complete as
1652
s ecified
Each
5.00
0.00
-5.00
$100.00$500.00
Sawing existing pavement;
Linear
1700
complete asspecified
Feet
2.659.00
0.00
-2,659.00
$3.00
$7,977.00
Base aggregate dense; 3/4";
1800
complete asspecified
Tons
44.00
55.33
11.33
$20.00
$226.60
Tack coat; complete as
1900
specified
Gallons
100.00
0.00
-100.00
$5.00
$500.00
4" asphaltic pavement LT
with 10" CABC and grading;
Square
1906
complete asspecified
Yards
1,440.00
1,426.96
-13.04
$48.00
$625.92
2" asphaltic pavement LT
with 10" CABC and grading;
Square
1
1907
com fete asspecified
Yards
512.001
748.01
236.01
1
$44.00 1
$10,384.45
Page 1 of 5
CONTRACT 19-12 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE INCONTRACT
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACTPR/CE
2" asphaltic surface LT with
6" CABC and grading;
Square
1917
complete asspecified
Yards
62.00
13.50
-48.50
$20.00
$970.00
Asphaltic cold weather
Square
1918
paving; complete asspecified
Yards
100.00
0.00
-100.00
$16.00
is1,600.00
Furnish and install 10" storm
Linear
2002
sewer; complete asspecified
Feet
30.00
53.50
23.50
1
$60.00
1 $1,410.00
Furnish and install 18" storm
Linear
2009
sewer; complete asspecified
Feet
308.00
309.00
1.00
$68.00
$68.00
Furnish and install standard
storm sewer manhole (4'
diameter); complete as
Vertical
2201
specified
Feet
12.00
14.76
2.76
$510.00
$1,407.60
Furnish and install 6" storm
sewer lateral; complete as
Linear
2400
specified
Feet
10.00
9.00
-1.00
$90.00
$90.00
Furnish and install storm
sewer marker balls; complete
2404
1 asspecified
Each
2.00
3.00
1.00
$40.00
$40.00
Furnish and install storm
sewer clay dams; complete
2406
asspecified
Each
4.00
2.00
-2.00
$100.00
$200.00
Furnish and install storm
sewer lateral inlet; complete
2408
asspecified
Each
1.00
1.00
$500.00
Tunnel underneath existing
retaining walls (Storm
Laterals); complete as
2410
Ispecifled
Each
1 1.00
0.00
-1.00
$i 000.00
$1,000.00
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
2508
specified
Each
6.00
3.00
-3.00
1 $150.00
$450.00
Sediment removal - Type D
modified inlet protection;
2510
complete asspecified
Each
3.00
0.00
-3.00
$40.00
$120.00
Furnish; install; maintain; and
remove silt fence; complete
Linear
2514 1
asspecified
Feet
910.00
813.60
-96.40
$3.20
$308.48
Furnish; install; maintain; and
remove stone bag; complete
2516
asspecified
Each
8.00
0.00
-8.00
$20.00
$160.00
remove 12" diameter
Linear
2518
sediment logs; complete as
Feet
40.00
0.00
-40.00
$12.00
$480.00
Furnish; install; maintain; and
remove ditch check;
2522
complete asspecified
Each
1 13.00
9.00
-4.00
$90.00
$360.00
Furnish and install no -mow
Square
2622
fescue; complete asspecified
Yards
160.00
0.00
-160.00
$18.00
$2,880.00
Furnish and install Class I;
Type A erosion control mat;
Square
2630
complete asspecified
Yards
160.00
0.00
-160.00
$4.00
$640.00
Connect to existing storm
sewer main; complete as
2850
specified
Each
1.00
1.00
1
$800.00
Page 2 of 6
CONTRACT 19.12 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASE/N
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACTPRICE
Furnish; install; maintain; and
remove construction fencing;
Linear
2900
complete asspecified
Feet
800.00
834.80
34.80
$4.00
$139.20
Furnish; install; maintain; and
remove temporary access
Lump
2901
1 road; complete asspecified
Sum
1 1.00
0,80
-0.20
1 $15,000.00
$3 000.00
Furnish and install 8" sanitary
sewer (new); complete as
Linear
3030
specified
Feet
15.00
18.00
3.00
$262.00
$786.00
Furnish and install 12"
sanitary sewer (new);
Linear
3034
complete asspecified
Feet
15.00
18.00
3.00
$290.00
$870.00
Furnish and install 15"
sanitary sewer (new);
Linear
3036
complete asspecified
Feet
823.00
823.00
$186.00
Furnish and install standard
sanitary sewer manhole (4'
diameter); complete as
Vertical
3100
specified
Feet
33.001
31.96
-1.04
$620.00
$644.80
Furnish and install external
sanitary sewer manhole
chimney seal; complete as
3114
specified
Each
3.00
4.00
1.00
$600.00
$500.00
Furnish and install external
sanitary sewer manhole
chimney seal extension;
3116
complete asspecified
Each
1.00
1.00
$300.00
Furnish and install internal
sanitary sewer manhole
chimney seal; complete as
3118
specified
Each
1.00
0.00
1 -1.00
$500.00
$500.00
Furnish and install internal
sanitary sewer manhole
chimney seal extension;
3120
complete asspecified
Each
1.00
0.00
-1.00
$300.00
$300.00
Furnish and install 476"
sanitary sewer lateral (relay);
Linear
3234
complete asspecified
Feet
15.00
62.00
47.00
$72.00
$3,384.00
Furnish and install sanitary
sewer lateral marker balls;
3236
complete asspecified
Each
2.001
4.00
2.00
1
$40.00
$80.00
Furnish and install clay
3238
dams; complete asspecified
Each
1.00
2.00
1.00
$150.00
$160.00
connection to existing 15"
3306
sanitary sewer mains;
Each
1.00
1.00
$1,900.00
Closed circuit televising;
Linear
3700
complete asspecified
Feet
823.00
823.00
$3.00
Furnish and install new 6"
ductile iron water main with
polywrap; complete as
Linear
4020
specified
Feet
20.00
20.00
$180.00
Furnish and install new 8"
ductile iron water main with
polywrap; complete as
Linear
4022
specified
Feet
668.00
668.00
$98.00
Furnish and install new 10"
ductile iron water main with
polywrap; complete as
Linear
4024
specified
Feet
221.00
218.00
-3.00
$139.00
$417.00
Page 3 of 5
CONTRACT 19-12 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN CONTRACT
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACTPR/CE
Furnish and install 1"water
service (relay); complete as
Linear
4036
specified
Feet
70.00
0.00
-70.00
$86.00
$6,020.00
Furnish and install 1"water
service (new); complete as
Linear
4042
specified
Feet
181.00
380.00
199.00
$79.00
$15,721.00
Furnish and install 1-1/2"
water service (new);
Linear
4044
1 complete asspecified
Feet
26.00
30.00
4.00
1
$88.00
1 $352.00
Furnish and install
1"
corporation and stop
box;
4048
complete asspecified
Each
9.00
13.00
4.00
$550.00
$2,200.00
Furnish and install 1-1/2"
corporation and stop box;
4051
complete asspecified
Each
1.00
1.00
$700.00
Furnish and install water
service clay dams; complete
4055
asspecified
Each
1 9.00
13.00
4.00
$150.00
$600.00
Furnish and install
connections to existing 8"
water main; complete as
4060
Ispecified
Each
1.00
1.00
$3,700.00
Furnish and install
connections to existing 10"
water main; complete as
4062
specified
Each
1.00
1.00
$4,000.00
Furnish and install 8" x 6"
water main tee; complete as
4110
specified
Each
1 1.00
1.00
$600.00
Furnish and install 10" x 6"
water main tee; complete as
4119
specified
Each
1.00
1.00
$700.00
Furnish and install 6" 45
degree water main bend;
4236
complete asspecified
Each
4.00
2.00
-2.00
$300.00
$600.00
Furnish and install 8" 45
degree water main bend;
4237
Complete asspecified
Each
4.00
4.00
$400.00
Furnish and install 10" 45
degree water main bend;
4238
complete asspecified
Each 1
2.00
3.00
1.00
$460.00
$460.00
Furnish and install 10" x 6"
water main reducer; complete
4266 l
asspecified
Each
1.00
1.00
$440.00
Furnish and install 6" water
main gate valve; complete as
4401
specified
Each
2.00
2.00
$1,300.00
Furnish and install 8" water
main gate valve; complete as
4402
specified
Each
2.011
2,00
$1,660,00
Furnish and install 10" water
main gate valve: complete as
4403
sped
Each
1.00
1.00
$2,400.00
Page 4 of 5
CONTRACT 19-12 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACT PRICE
Furnish and install hydrant;
4500
complete asspecified
Each
2.00
2.00
$3.990.00
Furnish and install 2" water
main casing pipe; complete
Linear
4712
asspecified
Feet
30.00
30.00
$190.00
Furnish and install 4" water
main casing pipe; complete
Linear
4714
asspecified
Feet
10.00
10.00
$260.00
Furnish and install 18" water
main casing pipe; complete
Linear
4726
asspecified
Feet
15.00
15.00
$490.00
Furnish and install 20" water
main casing pipe; complete
Linear
4728
asspecified
Feet
15.00
15.00
$600.00
SECTION I (BID ITEMS 1100 -4728) SUBTOTAL:
NET DECREASE TO SECTION I:
2Ub] i i U7 � /_RNG7:7.i :7 7d 411:7 q �71
$46,317.26 ($46,759.92)
($442.66)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
CONTRACT INCREASEIN
DECREASE/N
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
CONTRACT PRICE
Storm lateral drain re-
installation; complete as
Lump
20000
s ecifed
Sum
0.00
1.00
1.00
$2,200.00
$2,200.00
Furnish and install 15" x 4"
factor wye; complete as
30000
specified
Each
0.00
2.00
2.00
$800.00
$1,600.00
Furnish and install 4/6 lateral
riser (new); complete as
Linear
30001
specified
I Feet 1
0.001
9.001
9.00
$225,00
$2,025.00
ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 20000 - 30001) SUBTOTAL:
NET INCREASE:
NET DECREASE TO SECTION I:
NET INCREASE TO ADDITIONAL WORK:
NET INCREASE TO CONTRACT:
$5,825.00 $0.00
$6,825.00
($442.66)
$5,825.00
$5,382.34
Page 5 of 5