HomeMy WebLinkAboutChange Order No 1- Wood Sewer & Excavating141 City � Oshkosh April 17, 2020 Sue Wood Wood Sewer & Excavating E9238 County Road X New London, WI 54961 RE: Change Order No. 1(Final) Contract 19-12 Dear Sue: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Wood Sewer & Excavating regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, es Rabe, P.E., CkES Director of Public Works Jmtlt Enclosure: Change Order No.1 (Final) cc: Pam Ubrig, City Clerk (w/original) Jennifer Messerschmidt, Assistant Finance Director (w/copy) File (w/original) RECEIVED APR 20 2020 CITY CLERK'S OFFICE l:\Engineering\2019CONTRAC75\19-12Misc Utl\ProjecLI.f. H.\Co.t auto\Change Orders\19-12 Executed CO Rl (Final) Ltr 419-20.d= Page 1 of 1 City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 hitp://www.ci.oshkosh.wi.us TO: WOOD SEWER & EXCAVATING E9238 COUNTY ROAD X NEW LONDON, WI 54961 CHANGE ORDER #1 (FINAL) DATE: MARCH 6, 2020 Your present contract with the City of Oshkosh, Contract No. 19-12, awarded May 28, 2019, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($442.66) NET INCREASE TO ADDITIONAL WORK: $5,825.00 NET INCREASE TO CONTRACT $5,382.34 SECTION I TOTALS BID TOTAL $594,444.50 $594,444.60 CO #1 $5,382.34 $5,382.34 CONTRACT TOTAL $599,826.84 $599,826.84 CITY OF OSHKOSH BY: / — c City Man ger City Clerk Approve and a cepted: Contractor Grss I-.067 and I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. /W Comptrol er :►I.t I�,rr., ► ..ar CONTRACT 19-12 CHANGE ORDER #1 (FINAL) 19-12 ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPRICE Removing pavement; Square IWO complete ass ecifed Yards 1,912.00 1,187.16 -724.84 $3.00 $2,174.52 Removing concrete and asphalt sidewalk and driveway; complete as Square 1120 specified Feet 1.390.00 647.92 -742.08 $3.00 $2,226.24 Unclassified excavation; Cubic 1200 complete ass ecified Yards 522.00 322.90 -199.10 $12.00 $2,389.20 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square 1308 asspecified Yards 160.00 146.40 -13.60 $110.00 $1,496.00 Adjust manholes and inlets; 1360 l complete ass ecified Each 5.00 6.001 1.00 $400.00 $400.00 Turf restoration on Kentucky Square 1370A Street; complete asspecified Yards 124.60 111.50 -13.10 $15.00 $196.50 Turf restoration on Omro Square 1370E Road; complete ass specified Yards 240.80 693.10 452.30 $15.00 $6,784.50 Turf restoration on North Westhaven Drive; complete Square 1370C ass specified Yards 94.60 0.00 -94.60 $15.00F$2 $1,419.00 4" concrete sidewalk with 3" CABC and grading; complete Square 1500 as specified Feet 1,155.00 513.77 -641.23 $8.50$5,450.46 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square 1510 specified Feet 105.00 130.99 25.99 $9.00 No. 4 reinforcing rods - deformed; epoxy -coated; Linear 1550 complete asspecified Feet 120.00 66.00 -54.00 $1.20$64.80 Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; - 1560 complete asspecified Each 12.00 24.00 12.00 $10.00Locate existing property monuments; complete as 1650 s ecified Each 14.00 9.00 -5.00 $200.00$1,000.00Replace existing property monuments; complete as 1652 s ecified Each 5.00 0.00 -5.00 $100.00$500.00 Sawing existing pavement; Linear 1700 complete asspecified Feet 2.659.00 0.00 -2,659.00 $3.00 $7,977.00 Base aggregate dense; 3/4"; 1800 complete asspecified Tons 44.00 55.33 11.33 $20.00 $226.60 Tack coat; complete as 1900 specified Gallons 100.00 0.00 -100.00 $5.00 $500.00 4" asphaltic pavement LT with 10" CABC and grading; Square 1906 complete asspecified Yards 1,440.00 1,426.96 -13.04 $48.00 $625.92 2" asphaltic pavement LT with 10" CABC and grading; Square 1 1907 com fete asspecified Yards 512.001 748.01 236.01 1 $44.00 1 $10,384.45 Page 1 of 5 CONTRACT 19-12 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE INCONTRACT DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPR/CE 2" asphaltic surface LT with 6" CABC and grading; Square 1917 complete asspecified Yards 62.00 13.50 -48.50 $20.00 $970.00 Asphaltic cold weather Square 1918 paving; complete asspecified Yards 100.00 0.00 -100.00 $16.00 is1,600.00 Furnish and install 10" storm Linear 2002 sewer; complete asspecified Feet 30.00 53.50 23.50 1 $60.00 1 $1,410.00 Furnish and install 18" storm Linear 2009 sewer; complete asspecified Feet 308.00 309.00 1.00 $68.00 $68.00 Furnish and install standard storm sewer manhole (4' diameter); complete as Vertical 2201 specified Feet 12.00 14.76 2.76 $510.00 $1,407.60 Furnish and install 6" storm sewer lateral; complete as Linear 2400 specified Feet 10.00 9.00 -1.00 $90.00 $90.00 Furnish and install storm sewer marker balls; complete 2404 1 asspecified Each 2.00 3.00 1.00 $40.00 $40.00 Furnish and install storm sewer clay dams; complete 2406 asspecified Each 4.00 2.00 -2.00 $100.00 $200.00 Furnish and install storm sewer lateral inlet; complete 2408 asspecified Each 1.00 1.00 $500.00 Tunnel underneath existing retaining walls (Storm Laterals); complete as 2410 Ispecifled Each 1 1.00 0.00 -1.00 $i 000.00 $1,000.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2508 specified Each 6.00 3.00 -3.00 1 $150.00 $450.00 Sediment removal - Type D modified inlet protection; 2510 complete asspecified Each 3.00 0.00 -3.00 $40.00 $120.00 Furnish; install; maintain; and remove silt fence; complete Linear 2514 1 asspecified Feet 910.00 813.60 -96.40 $3.20 $308.48 Furnish; install; maintain; and remove stone bag; complete 2516 asspecified Each 8.00 0.00 -8.00 $20.00 $160.00 remove 12" diameter Linear 2518 sediment logs; complete as Feet 40.00 0.00 -40.00 $12.00 $480.00 Furnish; install; maintain; and remove ditch check; 2522 complete asspecified Each 1 13.00 9.00 -4.00 $90.00 $360.00 Furnish and install no -mow Square 2622 fescue; complete asspecified Yards 160.00 0.00 -160.00 $18.00 $2,880.00 Furnish and install Class I; Type A erosion control mat; Square 2630 complete asspecified Yards 160.00 0.00 -160.00 $4.00 $640.00 Connect to existing storm sewer main; complete as 2850 specified Each 1.00 1.00 1 $800.00 Page 2 of 6 CONTRACT 19.12 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASE/N NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPRICE Furnish; install; maintain; and remove construction fencing; Linear 2900 complete asspecified Feet 800.00 834.80 34.80 $4.00 $139.20 Furnish; install; maintain; and remove temporary access Lump 2901 1 road; complete asspecified Sum 1 1.00 0,80 -0.20 1 $15,000.00 $3 000.00 Furnish and install 8" sanitary sewer (new); complete as Linear 3030 specified Feet 15.00 18.00 3.00 $262.00 $786.00 Furnish and install 12" sanitary sewer (new); Linear 3034 complete asspecified Feet 15.00 18.00 3.00 $290.00 $870.00 Furnish and install 15" sanitary sewer (new); Linear 3036 complete asspecified Feet 823.00 823.00 $186.00 Furnish and install standard sanitary sewer manhole (4' diameter); complete as Vertical 3100 specified Feet 33.001 31.96 -1.04 $620.00 $644.80 Furnish and install external sanitary sewer manhole chimney seal; complete as 3114 specified Each 3.00 4.00 1.00 $600.00 $500.00 Furnish and install external sanitary sewer manhole chimney seal extension; 3116 complete asspecified Each 1.00 1.00 $300.00 Furnish and install internal sanitary sewer manhole chimney seal; complete as 3118 specified Each 1.00 0.00 1 -1.00 $500.00 $500.00 Furnish and install internal sanitary sewer manhole chimney seal extension; 3120 complete asspecified Each 1.00 0.00 -1.00 $300.00 $300.00 Furnish and install 476" sanitary sewer lateral (relay); Linear 3234 complete asspecified Feet 15.00 62.00 47.00 $72.00 $3,384.00 Furnish and install sanitary sewer lateral marker balls; 3236 complete asspecified Each 2.001 4.00 2.00 1 $40.00 $80.00 Furnish and install clay 3238 dams; complete asspecified Each 1.00 2.00 1.00 $150.00 $160.00 connection to existing 15" 3306 sanitary sewer mains; Each 1.00 1.00 $1,900.00 Closed circuit televising; Linear 3700 complete asspecified Feet 823.00 823.00 $3.00 Furnish and install new 6" ductile iron water main with polywrap; complete as Linear 4020 specified Feet 20.00 20.00 $180.00 Furnish and install new 8" ductile iron water main with polywrap; complete as Linear 4022 specified Feet 668.00 668.00 $98.00 Furnish and install new 10" ductile iron water main with polywrap; complete as Linear 4024 specified Feet 221.00 218.00 -3.00 $139.00 $417.00 Page 3 of 5 CONTRACT 19-12 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPR/CE Furnish and install 1"water service (relay); complete as Linear 4036 specified Feet 70.00 0.00 -70.00 $86.00 $6,020.00 Furnish and install 1"water service (new); complete as Linear 4042 specified Feet 181.00 380.00 199.00 $79.00 $15,721.00 Furnish and install 1-1/2" water service (new); Linear 4044 1 complete asspecified Feet 26.00 30.00 4.00 1 $88.00 1 $352.00 Furnish and install 1" corporation and stop box; 4048 complete asspecified Each 9.00 13.00 4.00 $550.00 $2,200.00 Furnish and install 1-1/2" corporation and stop box; 4051 complete asspecified Each 1.00 1.00 $700.00 Furnish and install water service clay dams; complete 4055 asspecified Each 1 9.00 13.00 4.00 $150.00 $600.00 Furnish and install connections to existing 8" water main; complete as 4060 Ispecified Each 1.00 1.00 $3,700.00 Furnish and install connections to existing 10" water main; complete as 4062 specified Each 1.00 1.00 $4,000.00 Furnish and install 8" x 6" water main tee; complete as 4110 specified Each 1 1.00 1.00 $600.00 Furnish and install 10" x 6" water main tee; complete as 4119 specified Each 1.00 1.00 $700.00 Furnish and install 6" 45 degree water main bend; 4236 complete asspecified Each 4.00 2.00 -2.00 $300.00 $600.00 Furnish and install 8" 45 degree water main bend; 4237 Complete asspecified Each 4.00 4.00 $400.00 Furnish and install 10" 45 degree water main bend; 4238 complete asspecified Each 1 2.00 3.00 1.00 $460.00 $460.00 Furnish and install 10" x 6" water main reducer; complete 4266 l asspecified Each 1.00 1.00 $440.00 Furnish and install 6" water main gate valve; complete as 4401 specified Each 2.00 2.00 $1,300.00 Furnish and install 8" water main gate valve; complete as 4402 specified Each 2.011 2,00 $1,660,00 Furnish and install 10" water main gate valve: complete as 4403 sped Each 1.00 1.00 $2,400.00 Page 4 of 5 CONTRACT 19-12 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE Furnish and install hydrant; 4500 complete asspecified Each 2.00 2.00 $3.990.00 Furnish and install 2" water main casing pipe; complete Linear 4712 asspecified Feet 30.00 30.00 $190.00 Furnish and install 4" water main casing pipe; complete Linear 4714 asspecified Feet 10.00 10.00 $260.00 Furnish and install 18" water main casing pipe; complete Linear 4726 asspecified Feet 15.00 15.00 $490.00 Furnish and install 20" water main casing pipe; complete Linear 4728 asspecified Feet 15.00 15.00 $600.00 SECTION I (BID ITEMS 1100 -4728) SUBTOTAL: NET DECREASE TO SECTION I: 2Ub] i i U7 � /_RNG7:7.i :7 7d 411:7 q �71 $46,317.26 ($46,759.92) ($442.66) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT INCREASEIN DECREASE/N NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE Storm lateral drain re- installation; complete as Lump 20000 s ecifed Sum 0.00 1.00 1.00 $2,200.00 $2,200.00 Furnish and install 15" x 4" factor wye; complete as 30000 specified Each 0.00 2.00 2.00 $800.00 $1,600.00 Furnish and install 4/6 lateral riser (new); complete as Linear 30001 specified I Feet 1 0.001 9.001 9.00 $225,00 $2,025.00 ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 20000 - 30001) SUBTOTAL: NET INCREASE: NET DECREASE TO SECTION I: NET INCREASE TO ADDITIONAL WORK: NET INCREASE TO CONTRACT: $5,825.00 $0.00 $6,825.00 ($442.66) $5,825.00 $5,382.34 Page 5 of 5