HomeMy WebLinkAboutChange Order No 1 (Final)- Highway LandscapersCity
Oshkosh
March 31, 2020
Tim Pagel
Highway Landscapers
1900 Bohm Drive
Little Chute, Wl 54140
RE: Change Order No. 1(Final)
Contract 19-01
Dear Mr. Pagel:
RECEIVED
APR 16 2020
CITY CLERK'S OFFICE
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and
Highway Landscapers regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
es Rabe, P.E., CPESC
Director of Public Works
JEH/tlt
Enclosure: Change Order No. 1(Final)
cc: Pam Ubrig, City Clerk (w/original)
Jennifer Messerschmidt, Assistant Finance Director (w/copy)
File (w/original)
I:\Engh,aeing\201900N Cr3\39-01 W Waukau Ga1hapatrk\ProjecL1nfovnadon\Contract Page 1 of 1
Wo\Change Orders\19-01 Rx ted tb i1(Fiaal)Ltr_331-20.doa
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-113o htip://www.ci.oshkosh.vri.us
TO: HIGHWAY LANDSCAPERS
1900 BOHM DRIVE
LITTLE CHUTE, WI 54140
CHANGE ORDER #1 (FINAL):
DATE: MARCH 2, 2020
Your present contract with the City of Oshkosh, Contract No. 19.01, awarded August 27, 2019, is hereby
amended and changed as follows:
NET DECREASE TO SECTION I:
NET DECREASE TO ALTERNATE:
NET INCREASE TO ADDITIONAL WORK:
�ECti���9
MPS 161oC'VOV�lgS
e0 *`S�oty$��
OS
NET INCREASE TO CONTRACT
BID TOTAL
CO #
$940,235.77
$21,365.16
CONTRACT TOTAL $961,600.93
CITY OF OSHKOSH
City Manager
i Cl
Appr d and accepte
v
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order. v
Comptro r
Approved as form:
City Att ey
($8,647.58)
($1,602.00)
$31,614.74
$21,365.16
TOTALS
$940,236.77
CONTRACT 19-01 CHANGE ORDER #1 (FINAL)
119-07
NET UNIT INCREASE IN DECREASE
IN
CONTRACT INSTALLED NET PRICE CONTRACT PRICE CONTRACT PRICE
ITEM DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE
NUMBER
r.A^in7nfinn' comolete as 1 Lump I I J4 nn $90,000.00
Lsphalt sidewalk and Square
idveway; complete as
ecified Feet
B" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
lfine grading; turf restoration; uare
and traffic control; complete Sq a_
as
(concrete pavement) -single
Square
$0.01 $0.19
visquine; complete as
yards
1,100.00
1,118.50 18.50
380
s ecified
Cold weather covering
(concrete pavement) -double
Square
-1,100.00
$11
$0.01
visquine; complete as
Yards
1,100.00
0.00
382
s ecified
Cold weather covering
(concrete pavement) - double
visquine with 6" hay;
Square
0.00 -1,100.00
$1
$0.01
1384
cam late as s ecified
Yards
1,100.00
Up -charge for late season
cold weather concrete
Cubic
$15.00 $801.00
pavement; complete as
Yards
200.00
253.40 53.40
1390
s ecified
6" concrete sidewalk/
driveway/ramp with 3" CABC
$3,01
and grading; complete as
Square
4 Ana nn
1.056.00-353.00
$8.50
(sidewalk) - single visquine; I Square
complete ass ecified Feet
Cold weather coveringSquare
leieiowalk) - double visquine;
sidewalk) - double visquine
Nith 6" hay; complete as Square
specified Feet
Up -charge for late season
cold weather concrete Cubic
sidewalk; complete as
tV10" CABC and grading; I Square
n late as ecified Yards
vement markings; epoxy;
(white); complete as Linear
wee.
1
1
1
Page 1 of 5
CONTRACT 19-01 CHANGE ORDER #1 (FINAL)
CONTRACT INSTALLED NET
- INCREA
ITEM
DESCRIPTION - - __
UNIT _ --QUANTITY
QUANTITIES
NUMBER
Pavement markings; epoxy;
4" (yellow); complete as
Linear
500.00
0.00
1975
s ecified
Feet
Furnish and install 12" RCP
Class V storm sewer;
Linear
89.00
93.40 4.4
2005
com late ass cified
Feet
Furnish and install 15" RCP
Class V storm sewer;
Linear
53.00
53.00
2008
com late as s ecified
Feet
Furnish and install 27" RCP
Class V storm sewer;
Linear
Feet
108.00
100.00
2020
COm late as s ecified
Furnish and install 36" RCP
Class V storm sewer;
Linear
Feet
9.00
9.50 0.
2026
com late ass ecified
Furnish and install standard
storm sewer manhole (5'
diameter); complete as
Vertical
6.50
5.22
2202
s ecified
Feet
Furnish and install standard
sewer inlet manhole (5'
at
diameter); complete as
Vertical
7.50
5.87
2214 s ecified
Feet
Fumish and install Type 'I
_
, nn
1.00
Type D inlet
In; complete as
Each
6.00 8.00
d
install; maintain; and
silt fence; complete
Linear
672.00 427.00
;ified
Feet
install; maintain; and
: turbidity barrier;
Each
1.00 0.0C
:te ass ecified
i and install turf grass;
Square
240.00 240.0(
;teas s ecified
Yards
h and install Class I;
Type A erosion
I mat; complete as
Square
Yards
240.00 240.0
tact
,h and install medium
I with filter fabric;
Square
Yards
60.00 214.0
late ass ecified
ive 30" and smaller
sewer; complete as
Linear
292.00 292
Fled
Feet
we storm sewer
ioles and inlets;
Each
6.00 6.
Sete ass ecified
,act to existing storm
:r main; complete as
Each
1.00 1
.ified
tact to existing storm
:r manhole; complete as
1.00 1
;ified
Each
iove old structure STA
Lump
nn 1
NET UNIT INCREASE IN
,RIASE - PRICE CONTRACTPRI
Page 2 of 5
CONTRACT 19-01 CHANGE ORDER #1 (FINAL)
CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
ITEM DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
NUMBER
Excavation for structure
culverts B-70-325; complete lump f nn $10,500.00
run; complete as
>rotective surface treatment;
Square
:om late ass ecified
Yards
ldhesive anchors - No. 4
)ars; com late as ecified
E.
cEach
oncrete masonry culverts;
Cub c
com late ass ecified
Yards
High -strength bar steel
reinforcement - structures;
reinforcement -
:ures; complete as
fled
Ig steel - Type NY.
Mete as specified
erproofing; complete as 1 Square
:cified
Yards
e underdrain; wrapped -
inch (15); complete as
Linear
;cified
Feet
,..e,neu fahrie -Tvoe C:
Squad
sewer (new);
Linear
s asspecified
Feet
and install standard
sewer manhole (N
I); complete as
Vertical
d
Feet
and install 10" x 6"
sewer factory wyes
complete as
;d
Each
i and install 4"I6"
y sewer lateral (relay);
Linear
:te ass ecified
Feet
i and install sanitary
lateral marker balls;
,te as s ecified
Each
h and install clay
com late ass ecified
Each
In and install
ction to existing 8"
rv, sewer mains;
Page 3 of 5
CONTRACT 19-01 CHANGE ORDER #1 (FINAL)
ITEM I DESCRIPTION
NUMBER
Furnish and install 18"
sanitary sewer open cut
casing pipes; complete as
Remove sanitary sewer
manholes; complete as
specified
Remove samtarY sewer;
water main (relay) with
wrap; complete as
UNIT CONTRACT INSTALLED NEi
NET UNIT INCREASE IN DECREASE IN
QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRIC
Linear
Linear
iron water main (relay) with
of rlate as
p � p' com p
Linear
s ecifiaed
Feet
Furnish and install 16" ductile
iron water main (relay) with
polywrap and TR Flex
restrained joints; complete as
Linear
1 s ecified
Feet
Furnish and install 1" water
service (relay); complete as
Linear
corporation and stop box;
ons to existing 12"
in; complete as
Each
and install 12" 45
ater main bend;
e as s ecified
Each
and install 16" 45
ater main bend;
e ass ecified
Each
and install 16" z 12"
ain reducer; complete
ified
ffbend
Each
and install 12" water
ate valve; complete asd
Each
and install 16" waterate
valve; complete ased
Eachh
and install 24" waterasing
pipe; complete
Linearcifed
Feeton
water main on Westau
Avenue; complete
Lump
1
Y
tr,
1
VV
$21,421.77 ($30,069.35)
SECTION I (ITEMS 1050 -4900) - SUBTOTAL:
NET DECREASE TO SECTION I: ($8,647.58)
Page 4 of 5
CONTRACT 19-01 CHANGE ORDER #1 (FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE COAITRACTPRICE CONTRACT PRICE
ALTERNATE
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACTPRIRICE
DECREASE IN
CONTRACT PRICE
Unclassified excavation;
Cubic
$10.00
1200A
com late ass ecified
Yards
450.00
450.00
Furnish and install turf grass;
Square
196.00
-34.00
$12.00
$408.00
2620-1
com late ass ecified
Yards
230.00
Furnish and install no -mow
Square
775.00
684.00
-91.00
$12.00
$1,092.00
2611A
fescue; com late ass ecified
Yards
Furnish and install Class I;
Urban; Type A erosion
control mat; complete as
Square
Yards
230.00
196.00
-34 00
$3.00
$102.00
2632-1
s ecified
Furnish and install concrete -
ties block for channel lining;
Square
$76.00
2970-1
com late ass ecified
I Yards
775.00
775.00
ALTERNATE - (BID ITEMS 1200-1 - 2970-1) - SUBTOTAL:
NET DECREASE TO ALTERNATE:
ADDITIONAL WORK REQUIRED: CO #1
ITEM
NUMBER
$0.00 ($1,602.00)
($1,602.00)
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACTPRICE
DECREASEIN
CONTRACTPRICE
Tree and stump removal;
0.00
2.00
2.00
$6,000.00
$10,000.00
com late ass ecified
Each
Additional rebar for box
culvert due to error in plan;
Lump
0.00
1.00
1.00
$300.00
$300.00
com late ass ecified
Sum
Repair and replace railing;
Lump
1.00
1.00
$4,306.00
$4,305.00
com late ass ecified
Sum
0.00
Fabricate; galvanize; and
install steel grate for the 36"
Lump
1.00
1.00
$1,950.00
$1,950.00
S i e; com late as s ecified
Sum
0.00
Excavate frozen road
subgrade and backfill with 1
1/4" base aggregate;
Lump
0.00
1.00
1.00
$13,400.74
$13,400.74
i. com late as s ecified
Sum
Time and materials to
construct the box culvert
during the cold weather cure
Lump
1.00
1.00
$1,659.00
$1,659.00
5 period,complete ass ecified
Sum
0.00
ADDITIONAL WORK REQUIRED CO #1 (ITEMS 1-20000 - 1-20005) - SUBTOTAL:
$31,614.74 >u.uu
NET INCREASE TO ADDITIONAL WORK:
$31,614.74
NET DECREASE TO SECTION 1
($1,602.00)
NET DECREASE TO ALTERNATE
,6.
$31,614.74
NET INCREASE TO ADDITIONAL WORK
NET INCREASE TO CONTRACT:
$21,365.16
Page 5 of 5