January 4, 2019
Al Dix
Al Dix Concrete, Inc.
401 Gertrude Street
Kaukauna, WI 54130
RE: Change Order No. 1(Final)
Contract 19-06
Dear Al:
RECEIVED
APR 0 9 2020
CITY CLERK's OFFICE
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of
Oshkosh and Al Dix Concrete, Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
24es=abe,P.E., CPESC
Director of Public Works
1Brs/e1
Enclosure: Change Order No.1 (Final)
cc: Pam Ubrig, City Clerk (w/original)
Jennifer Messerschmidt, Assistant Finance Director (w/copy)
File (w/original)
I:\Enginming\2A19 CONT CM\19-0651d.1k\Ptoiect_kdomadon\Contract trdo\Change
O,dero\19-06 executed CO 11 I.tr_4g 20.d.
Page 1 of 1
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.cl.oshkosh.wi.us
CHANGE ORUHR # 2 F2p AL
DATE. MAR
ly,CONCRETE, INC.
TO'. 4� OMUNA, Wl 541130 REET ct No. 19 06, awarded June gpril 9, 2019, is hereby ($g7,787.13)
Of Oshkosh, contra ($15,495.96)
City the ($2 526.101
Your present contract as follows'. WORK UNIT A'• $5,500.00
amended and changed NET DECREASE TO WORK UNIT B'.
NET DECREASE -TO gLTERNATE 1''
NET DECREASE ORK. ($110,309.19)
NET INCREASE TO ADDITIONAL W
NET DECREASE TO CONTRACT:
TOTALS
408,950.00 $1,408,950.00
$1,
($110,309($110,309.19
BID TOTAL Q )QR.640.8i $1,298,640.8f
clTy OF OSHKOSH c
BY:
City Mana
City Clerk
Appr ved and accepted'.
Con ractor
Pay the liability that will accrue to the City of Oshkosh, Wisconsin,
een
under the within Chang
I certify that prevision h e 0 der.made to p Y
zf5V
comptro r
CONTRACT 19-06 CHANGE ORDER
19-06
WORK UNIT A
ITEM DESCRIPTION
NUMBER
Removing concrete and
asphalt sidewalk and
driveway; complete as
A -
A -
NET NET
UNIT QUANTITY I QUANTITINSTALLE S I INCREASE
DECREASE
Square
7" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete Square
ass ecifed Yards
8" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete Square
8" concrete pavement HES
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete Square
9" concrete pavement
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete Square
manholes and inlets;
Turf restoration; complete as
Square
ecified
Yards
rge for late seasonather
concreteent;
complete as
L
Cubiced
Yards
12" radius curb with 6" CABC
and grading; complete as
Linear
18" concrete curb and gutter
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
.and traffic control; complete Linear
UNITT I INCREASE IN I DECREASE IN
PRICE CONTRACT PRICE CONTRACT PRICE
10
Page 1 of 5
CONTRACT 19.06 CHANGE ORDER
NET
UNIT CONTRACT INSTALLED NET
ITEM DESCRIPTION QUANTITY QUANTITIES INCREASE DECREASE
NUMBER
24" concrete curb and gutter
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
land traffic control; complete Linear
30" concrete curb and gutter
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete Linear
as
Sidewalk curb; completeea
LFeetr
specified
4" concrete sidewalk with 3"
CABC and grading; complete
Square
ass ecified
4" concrete sidewalk with 3"
CABC and grading; in
existing subdivisions;
Square
com fete ass ecified
Feet
4" concrete sidewalk with 3"
CABC and grading; water
dept. locations; complete as
Square
s ecified
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Squa
I specified
Feet
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; water dept.
locations; complete as
Square
2 s ecified
Feet
8" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
0 s ecified
Feet
6" concrete sidewalk with 3"
CABC and grading; London
Paver Pattern; complete as
Squa
26 s ecified
Curb ramp detectable
warning field (natural/non-
painted); complete as
Square
40 s ecified
Feet
No. 4 reinforcing rods -
deformed; epoxy -coat ed;
Linear
gilled No. 4 sidewalk tie b
deformed; epoxy -coated;
1
1
1
70
-87
UNIT I INCREASE IN I DECREASE IN
PRICE CONTRACT PRICE CONTRACT PRIC
Page 2 of 5
CONTRACT 19-06 CHANGE ORDER
ITEM
NUMBER
DESCRIPTION
Cold weather covering
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACTPRICE
DECREASEIN
CONTRACTPRICE
$1,000.00
A-1580
(sidewalk) - single visquine;
com late ass ecified
Cold weather covering
Square
Feet
1,000.00
0.00
-1,000.00
$1.00
$1.000.00
A-1582
(sidewalk) - double visquine;
com late ass ecified
Cold weather covering
Square
Feet
1,000.00
0.00
-1,000.00
$1.00
(sidewalk) - double visquine
A-1584
with 6" hay; complete as
s ecified
Up -charge for late season
Square
Feet
1,000.00
4,720.39
3,720.39
$1.00
$3,720.39
cold weather concrete
A-1590
A-1700
A-1720
sidewalk; complete as
s ecified
Sawing existing pavement;
com late ass ecified
Profile saw cut concrete curb;
com late ass ecified
Base aggregate dense; 3/4";
Cubic
Yards
Linear
Feet
Linear
Feet
500.00
2,500.00
160.00
19.96
2,210.91
0.00
-480.04
-289.09
-150.00
$9.00
$8.00
$70.00
$4,320.36
$2,312.72
$10,500.00
$19,962.00
A-1800
com late ass ecified
5" asphaltic surface MT with
Tons
1,500.00
169.20
-1,330.80
$15.00
$20,000.00
A-1915
6" CABC and grading;
com late ass ecified
4" asphaltic surface LT with
Square
Yards
250.00
0.00
-250.00
$80.00
A-1916
6" CABC and grading;
complete ass ecified
2" asphaltic surface LT with
Square
Yards
500.00
762.86
262.86
$80.00
$21,028.80
A-1917
A-1990
A-1991 com
6" CABC and grading;
complete ass ecified
Break bottom of vault;
com lets ass ecified
Removal of vault wall;
fete ass ecified
Square
Yards
Square
Feet
Linear
Feet
250.00
2,200.00
350.00
0.00
297.00
72.00
-250.00
-1,903.00
-278.00
$80.00
$14.00
$44.00
$20,000.00
$26,642.00
$12,232.00)
WORK UNIT A - (BID ITEMS A-1120-A-1991) - SUBTOTAL:
NET DECREASE TO WORK UNIT A:
WORK UNIT B
$228,716.56 ($326,502.69)
($97,787.13)
ESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCRE4SEIN
CONTRACTPRICE
SEIN
CONTRACTPRICE
concrete and
PaEsphalt
dewalk and
complete as
Square
Feet
500.00
477.06
-22.94
$2.00$45.88"
concrete pavement HES
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
Square
BA 319
ass ecified
Yards
500.00
376.65
-123.35
$90.00
$11,101.50
Adjust manholes and inlets;
B-1360
complete ass ecified
Each
4.00
0.00
-4.00
$400.00
Turf restoration; complete as
Square
$1,600.00
B-1370
s ecified
Yards
2000.
0.00
-20.00
$12.00
$240.00
Page 3 or 5
CONTRACT 19.06 CHANGE ORDER
ITEM
NUMBER DESCRIPTION
UNIT
CONTRACT
INSTALLED NET
NET
UNIT
QUANTITY
QUANTITIES /NCREASE
DECREASE
PRICE
INCREASEIN
CONTRACTPRICE CONTRACTPR CE
12" radius curb with 6" CABC
and grading; complete as
Linear
B-1410 s ecified
Feet
70.00
0.00
Sidewalk curb; complete as
Linear
-70.00
$14.00
$980.00
B-1460 s ecified
Feet
30.00
4" concrete sidewalk with 3"
20.00
-10.00
$70.00
$700.00
CABC and grading; complete
Square
B-1500 as s ecified
Feet
350.00
268.01
6" concrete sidewalk/
-81.99
$6.00
$491 93
driveway/ramp with 3" CABC
and grading; complete as
Square
3-1510 s ecified
Feet
200.00
209.05 9.05
Curb ramp detectable
$7.00
$63.35
warning field (natural/non-
paint ed); complete as
Square
Irilled No. 4 sidewalk tie b
deformed; epoxy -coated;
WORK UNIT B - (ITEMS B-1120 - 8-1560) - SUBTOTAL:
NET DECREASE TO WORK UNIT B:
ALTERNATEI
WecifieFeet
DESCRIPTION CONTRACT INSTALLED NET UNIT QUANTITY NET UNIT
QUANTITIES INCREASE DECREASE PRICE
te sidewalk with 3"
d grading; complete Square
ied Feet 2,500.00 2 098.89-401.11 $5.50
nforcing rods -
; epoxy -coated; Linear
No. 4 sidewalk tie
cia ass ecmeo I Each I mool 0.00
-10.00
ALTERNATE 1 -(BID ITEMS 1500.1 .1560-1)-SUBTOTAL:
NET DECREASE TO ALTERNATE 1:
ADDITIONAL WORK REQUIRED: CO #1
ITEM
$63.36 ($15,559.31)
($15,495.96)
INCREASE IN
CONTRACT PRICE
CON
DE;t$99nnn)l
F100.00
$0.00 ($2,526.10)
($2,526.10)
NUMBER DESCRIPTION UN/T CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN QUANTITY QUAN7711ES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACTPRICE
Dig Inlet trenches on Merritt &
Bowen; complete as
Lump
1-10000
s ecified
Sum
Dig three (3) inlets on Merritt
& Bowen; complete as
Lump
1-10001
specified
Sum
Dig electrical conduit on
Witzel & Sawyer; complete I Lump
1
1
Page 4 of 5
CONTRACT 19.06 CHANGE ORDER
ITEM
NUMBER DESCRIPTION
UNIT CONTRACT INSTALLED NET NET
QUANTITY QUANTITIES INCREASE
UNIT
INCREASE IN DECREASEIN
DECREASE
Dig inlet trenches on Wifzel &
PRICE
CONTRACT PRICE CONTRACT PRICE
Sawyer; complete as
Lump
1-10003 s ecifed
Sum 0.00 1.00 1.00
Di inlets Sawyer
9 wyer&Wifzel;
Lump
$1,000.00
$1,000.00
1-10004 com fete ass ecified
Sum 0.00
Abandon inlet on Sawyer;
1.00 1.00
Lump
$1,000.00
$1,000.00
1-10005 com late ass ecifeid
Sum 0.00
Mobilzation for ramp on
1.00 1.00
.9500.00
$500.00
Winnebago requested by Jim
Collins; complete as
Lump
1-10006 specified
Sum 0.00 1.00 1.00
$500.00
$500.00
ADDITIONAL WORK - (BID ITEMS 1-10000 - 1-10006) - SUBTOTAL:
$5,500.00 $0.00
NET INCREASE TO ALTERNATE 1:
$5,500.00
NET DECREASE TO WORK UNIT A
NET DECREASE TO WORK UNIT B
($97,787.13)
NET DECREASE TO ALTERNATE 1
($15,495.96)
NET INCREASE TO ADDITIONAL WORK
($
$5,50.10)
,50.00
NET DECREASE TO CONTRACT:
($110,309.19)
Page 5 of 5