HomeMy WebLinkAboutChange Order No 2 DornerCityof Oshkosh March 31, 2020 Mark Schleis PTS Contractors 4075 Eaton Road Green Bay, WI 54311 RE: Change Order No. 2 (Final) Contract 19-05 Dear Mark: Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and Dorner, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, kRabe,P.Eor of Public Works JER/t1t Enclosure: Change Order No. 2 (Final) cc: Pam Ubrig, City Clerk (w/original) Jennifer Messerschmidt, Assistant Finance Director (w/copy) File (w/original) L\Engineering\2019 CONTEAM\1"52nd Paving\Projen_Irdonnation\Contract irdoWhange orders\19-05 Executed CO A2 (FiM) Ltr_331-20.doa Page 1 of 1 City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.cl.oshkosh.wi.us TO: PTS CONTRACTORS, INC. 4075 EATON ROAD GREEN BAY, WI 54311 CHANGE ORDER #2 (FINAL) DATE: FEBRUARY 28, 2020 Your present contract with the City of Oshkosh, Contract No. 19-05, awarded February 26, 2019, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($114,537.17) NET DECREASE TO ALTERNATE 2: ($5,478.00) NET INCREASE TO SECTION I: $4.054.61 NET DECREASE TO CONTRACT ($115,960.56) SECTION I TOTALS BID TOTAL $7,258,523.29 $7,258,523.29 CO #1 $192,625.55 $192,625.65 PREVIOUS CONTRACT TOTAL $7.451,148.84 $7,451,148.84 CO#2 ($115,960.56) ($115,960.56) CONTRACT TOTAL $7,335,188.28 $7,335,188.28 CITY OF OSHKOSH BY: Approved and acc pted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ,/ Comptroger Approved a form: City Aft CONTRACT 19-05 CHANGE ORDER N2 (FINAL) 19-05 ITEM DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT DECREASE IN CONTRACTPRICE NUMBER PRICE Mobilization; complete as Lump 1050 specified Sum 1.00 1.00 $532,000.00 Removing pavement; Square 1100 complete asspecified Yards 17,300.00 17.211.00 -89.00 $2.75 $244.75 Removing concrete and asphalt sidewalk and driveway; complete as Square 1120 ispecified Feet 1 46,000.001 45.889.60 1 -110.40 $0.40 $44.15 Unclassified excavation; Cubic 1200 complete asspecified Yards 3,950.00 3,932.20 -17.80 $15.75 $280.35 Excavation special (paving); 1220 complete ass specified Tons 500.00 0.00 -500.00 $12.25 $6,125.00 concrete pavement HES; �7" with 5" CABC and grading; Square 1303 complete ass specified Yards 500.00 576.10 76.10 $65.20 $4,961.72 8" concrete pavement HES; with 6" CABC and grading; Square 1313 complete ass specified Yards 590.00 577.00 -13.00 $65.70 $854.10 8" concrete pavement doweled; with 6" CABC and grading; complete as Square 1314A s ecified Yards 6,850.00 11,702.30 4852.30 $51.00 $247,467.30 8" concrete pavement doweled; HES; with 6" CABC and grading; complete as Square 1315 s ecified Yards 7,450.00 2 557.30 -4,892.70 $53.25 $260,536.28 Concrete pavement gaps; 1334 complete as specified Each 2.00 2.00 $1,025.00 Crushed aggregate base course; complete as 1340 specified Tons 1,550.00 51.80 -1,498.20 $6.15 $9,213.93 Pavement ties; complete as 1350 specified Each 10.00 14.00 4.00 $8.20 $32.80 Drilled dowel bars; 1'; 1352 complete as specified Each 105.00 70.00 -35.00 $10.25 $358.75 Drilled dowel bars; 1 1/4"; 1354 complete ass ecified Each 75.00 93.00 18.00 $14.30 $257.40 manholes and inlets; com lete ass ecified Each 95.00 94.00 -1.00 $280.00 $280.00Turf restoration; complete as Square s ecified Yards 4,570.00 4.874.00 304.00 $9.20 $2,796.80 rAdjust Restore gravel driveway/ Square apron: complete ass specified Yards 140.00 195.10 55.10 $11.25 $619.88 Cold weather covering (concrete pavement) - single visquine; complete as Square 1380 specified Yards 3,000.00 0.00 -3,000.00 $0.01 $30.00 Up -charge for late season cold weather concrete pavement; complete as Cubic 1390 specified Yards 670.00 0.00 -670.00 1 $5.12 $3,430.40 12" radius curb with 6" CABC and grading; complete as Linear 1410 specified Feet 500.00 483.10 -16.90 $11.25 $190.13 30" curb and gutter; 8", with 6" CABC and grading; Linear 1442 complete ass ecified Feet 210.00 206.70 -3.30 $31.70 $104.61 Page 1 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) ITEM DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT DECREASE IN COMRACTPRICE NUMBER PRICE 30" curb and gutter; 8"; with 6" CABC and grading; Linear 1443 complete as specified Sidewalk curb; complete as Feet 5,526.00 5,472.40 -52.60 $15.80 $831.08 Linear 1460 specified Feet 250.00 197.80 -52.20 $50.00 $2,610.00 4" concrete sidewalk with 3" CABC and grading; complete Square 1500 asspecified Feet 25,550.00 26.610.00 1060.00 $5.75 $6,095.00 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square 1510 ispecified Feet 1 11,070.00 10.607.10 -462.90 $6.00 $2,777.40 concrete sidewalk/ 16" driveway/ramp (HES) with 3" CABC and grading; complete Square 1514 asspecified Feet 5,050.001 4848.40 -201.60 $6.30 $1,270.08 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square 1520 specified Feet 1,360.00 1.589.70 229.70 $7.00 $1,607.90 6" concrete step; complete as Square 1530 specified Feet 345.00 232.50 -112.50 $51.00 $5,737.50 Curb ramp detectable warning field (natural/non- painted); complete as Square 1540 specified Feet 192.00 200.00 8.00 $32.70 $261.60 No. 4 reinforcing rods - deformed, epoxy -coated; Linear 1550 Complete asspecified Feet 5,140.00 4,950.00 -190.00 $1.25 $237.50 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated; 1560 complete ass ecified Each 425.00 301.00 -124.00 $4.60 $570.40 Cold weather covering (sidewalk) - single visquine; Square 1580 complete asspecified Feet 81400.00 0.00 -8,400.00 $0.50 $4,200.00 Up -charge for late season cold weather concrete 1 pavement; complete as Cubic 1590 specified Yards 130.00 0.00 -130.00 $9.20 $1,196.00 Locate existing property monuments; complete as 1650 specified Each 30.00 43.00 13.00 $128.00 $1,664.00 Replace section corner; 1651 complete asspecified Each 2.00 2.00 $410.00 Replace existing property monuments; complete as 1652 specified Each 20.00 39.00 19.00 $51.00 $969.00 Sawing existing pavement; Linear 1700 complete ass specified Feet 1,275.00 1,288.00 13.00 $2.00 $26.00 Sawing concrete pavement full depth; complete as Linear 1710 S13ecified Feet 255.00 339.001 84.00 1 $2.60 $218.40 Tack coat; complete as 1900 specified Gallons 95.00 71.80 -23.20 $4.10 $95.12 4" asphaltic transition LT with 10" CABC and grading; Square 1911 complete asspecified Yards 1,195.00 1,259.90 64.90 $38.00 $2,466.20 4" asphaltic surface LT with 6" CABC and grading; Square 1916 complete asspecified Feet 150.00 147.60 -2.40 $46.00 $11 G.40 Page 2 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) m�rtcnucm DECREASEIN CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACTPRICE ITEM DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE NUMBER 2" asphaltic surface LT with 6" CABC and grading; Square _ tog RR ($6.412.50' cold weather I Square Pavement marking epoxy; 8" Linear $2.0C 1974 white ; wm late ass ecified Feet 4,940.00 4,606.80 -333.20 Pavement marking epoxy; 4" Linear $2.0( 1975 white ; com late as s ecified Feet 5,450.00 5,522.00 72.00 Pavement markings epoxy; 4" (yellow); complete as Linear $4.01 1976 s ecified Feet 260.00 267.50 7.50 Pavement markings parking stall epoxy; 4" (white); Linear $6.01 1977 com fete ass ecified Feet 565.00 542.00 -23.00 Pavement markings epoxy; 12" (white); complete as Linear Feet 175.00 153.80 -21.20 $9.0 1978 s ecified Pavement markings arrow epoxy; Type 2 (white); Linear $128.0 1980 complete ass ecified Feet 3.00 3.00 Pavement markings; word epoxy; Type 2 (white); Linear $180.0 1983 wm Iete ass ecified Feet 2.00 2.00 Fumish and in10" storm Linear $96.( 2002 sewer; com late ass ecified Feet 5.00 11.00 6.00 Fumish and install 12" storm Linear $80.( 2003 sewer; com late ass ecified Feet 725.00 719.80 -5.20 Furnish and install 15" storm Linear $65.( 2006 sewer; com late ass ecified Feet 325.00 325.30 0.30 Furnish and install 18" storm Linear $69.1 2009 sewer; com late as specified Feet 11450.00 1,420.50 -29-50 Furnish and install 21"storm Linear $84.i 2012 sewer; com late ass ecified Feet 350.00 344.20 -5.80 Furnish and install 24" storm Linear 2015 sewer; com late ass ecified Feet 500.00 496.10 -3.90�$$1822. Furnish and install 36" storm Linear $ 80 2024 sewer; com late ass ecified Feet 110.00 101.20 Furnish and install 54" storm Linear 97.30 12 70 $181 2033 sewer; com late ass ecified Feet 110.00 Furnish and install 34" x 53" HERCP Class III storm Linear 2053 sewer, com let ass ecified Feet z9u.uu GOO.oU Furnish and install W x 60" HERCP Class III storm Linear 20.00 8.00 -12.00 $2,076.00 2055 sewer; complete as s ecifeid Feet Furnish and install 48" x 76" #$356.00 J$416.52 2059 HERCP Class III storm sewer; complete ass ecified Linear Feet 80.00 78.50 -1 50 $270.00 Furnish and install standard storm sewer manhole (4' diameter); complete as Vertical 48.75 49.92 1.17 2201 s cified Feet Page 3 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) CONTRACT INSTALLED NET NET INCREASEIN DECREASEIN UNIT CONTRACT CONTRACTPRICE ITEM DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE NUMBER Furnish and install standard storm sewer manhole (5' diameter); complete as Vertical 12.59 -0 Ot $536.00 $5.36 2202 s ecified Feet 12.60 Furnish and install standard storm sewer manhole (6' diameter); complete as Vertical 4,29 0.19 $720.00 $136.80 2203 s ecified Feet 4.10 Furnish and install standard storm sewer manhole (8' diameter); complete as Vertical 8.78 0.38 $875.00 $332.50 2205 s ecified Feet 8.40 Furnish and install standard storm sewer manhole (7' x 7' Vertical 0.50 $1,015.00 $507.50 2210 box; com late ass ecified Feet 19.10 19.60 Furnish and install standard storm sewer manhole (8' x 6' Vertical 0.08 $1,800.00 $144.00 2211 box; complete ass ecified Feet 26.85 26.93 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as Vertical 2.85 -0.60 $395.00 $237.00 2213 s ecified Feet 3.45 Furnish and install Type 1 0.00 -1.00 $1,465.00 $1,465.00 2236 inlet; com late ass ecified Each 1.00 Furnish and install Type 3 inlet (with 18" sump); 33.00 -1.00 $1,565.00 $1,565.00 2237 com late as s ecified Each 34.00 Furnish and install 6" storm sewer lateral; complete as Linear 2,685.00 2,568.92 -116 OB $62.00 $7,196.95 2400 s ecified Feet Furnish and install 8" storm sewer lateral; complete as Linear -14.00 $76.00 $1,064.00 2402 s ecified Feet 170.00 156.00 Furnish and install storm sewer marker balls; complete p0 $44.00 $176.00 2404 ass ecified Each 155.00 151.00 .4 Furnish and install storm sewer clay dams; complete -g 00 $115.00 $345.00 2406 ass ecified Each 78.00 75.00 Furnish and install storm sewer lateral inlet; complete -6.00 $476.00 $2,856.00 2408 ass ecified Each 71.00 65.00 Storm lateral inlet adjustments; complete as 71.00 9.00 -62.00 $23.00 $1,426.00 2414 s ecified Each Perforated drain tile; Linear 0.00 -25.00 $36.00 $900.00 2416 com late ass ecified Feet 25.00 Cleanouts; complete as 1.00 1.00 $488.00 2418 s ecified Each Furnish; install; maintain; and remove Type D modified inlet protection; complete as 107.00 83.00 -24 00 $72 00 $1,728.00 2508 s ecified Each Sediment removal -Type D modified inlet protection; 107.00 16.00 _91 00 $6.00 $546.00 2510 complete ass ecified Each Page 4 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) ITEM DESCRIPTION NUMBER Furnish; install; maintain; and remove stone tracking pad; 2512 complete asspecified Furnish; install; maintain; and remove stone bag; complete UNIT I CONTRACT I INSTALLED SEI NET I UNIT QUANTT S INCREADECREASE PRICE -emove 12" diameter sediment logs; complete as I Linear specified Feet Furnish; install; maintain; and remove ditch check; com late ass ecified Each Furnish; install; maintain; and remove dewatering tank system; complete as as specinea Abandon 8" -12" storm sewer complete as specifie Abandon 15" and larger storm sewer; complete as Ifiedve 30" and smaller sewer; complete asfiedve 33" - 60" stormr; com late ass ec�e don storm seweroles and inlets;late ass ecifiedove storm sewerholes and inlets;late ass ecifiedned to existing stone r main; complete asifiedned to existing storm nr lateral: comDlete as Linear Linear Feet Linear Feet Linear 1 NCREASEIN DECREASEIN CONTRACT CONTRACTPRICE 1S2R0.00) 2852 2856 s ecified to existing storm seanhole; complete as_1 s d Stoewer utility line CoEecifiled Eachfuu.uu Each.00 - p0 -- $1,900.00 $1,900.00 op(ULO); complete as -5.00 $230.00 $1,150.00 2914 s d Each.00 Extion special (stone); -200.00 $25.00 $5,000.00Fu 2950 cote as s ecified and install 8" sanitaryse(relay); Tons.00 complete as Linear3000 -22.40 $100.00 $2,240.00Fuh s d Feet .60 and install 12"sa sewer (relay); Linear20 $156.00 $967.203004 cote ass ecified Feet4.80Furnish and install 18"sanitary sewer (relay); Linear3008 -6.50 $157.00 $1,020.50 com lete ass ecified Feet1.50 Page 5 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET QUANTITY QUANTITIES INCREASE NET DECREASE UNIT PRICE Furnish and install 24" sanitary sewer (relay); Linear 7.00 10.50 3.50 $27i 3012 com late ass ecified Feet Furnish and install 8" sanitary sewer (new); complete as Linear -2.00 $11 Feet 47.00 45.00 3030 s ecified Furnish and install 8" sanitary sewer drop; complete as Vertical -3 91 $37 Feet 47.00 43.09 3060 s ecified Furnish and install 18" sanitary sewer drop; Vertical 5.00 4.67 0.33 $4E 3068 com late ass ecified Feet Furnish and install standard sanitary sewer manhole (4' diameter); complete as Vertical 142.00 146.86 4.86 $2 3100 s ecified Feet Furnish and install external sanitary sewer manhole chimney seal; complete as $4 3114 specified Each 23.00 23.00 Furnish and install external sanitary sewer manhole chimney seal extension; Each 2.00 0.00 -2.00 $4 3116 com late ass ecified Furnish and install internal sanitary sewer manhole chimney seal; complete as 0.00 -1.00 $; 3118 s ecified Each 1.00 Furnish and install internal sanitary sewer manhole chimney seal extension; 1.00 0.00 -1.0- $ 3120 com late ass ecified Each Install CITY supplied manhole: complete as Vertical 11.00 10.86 -0.14 $' 3149 s ecified Feet Famish and install 8" x 6" INCREASEIN DECREASE IN CONTRACT CONTRACT PRICE sanitary sewer raccoiy wyca or tees; complete as Each 43.00 70.00 27.00 $ 96.00 $2,592.00 3210 s ecified Furnish and install 12" x 6" sanitary sewer factory wyes or tees; complete as 1.00 0.00 -1 O0 $292.00 $292.00 3214 s ecified Furnish and install 6" sanitary Each sewer "Inser-A-Tee" or " Kor- N-Tee"; complete as -4.00 $260.00 $1,040.00 Each 4.00 0.00 3222 s ecified Furnish and in stall 4'y6" sanitary sewer lateral (relay); Linear 2,165.00 2,311.00 146.00 $100.00 $14,600.00 3234 com late ass ecified Furnish and install 4"16" Feet sanitary sewer riser (relay); Linear 20.00 102.00 82.00 $ 120.00 $9,840.00 3235 com late ass ecified Furnish and install sanitary Feet sewer lateral marker balls; 157.00 159.00 2.00 $44.00 $88.00 3236 com late ass ecified Furnish and install clay Each 78.00 80.00 2.00 $115.00 $230.00 3238 dams; complete ass ecified Each Page 6 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) ITEM CONTRACT INSTALLED NET NET DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE NUMBER Furnish and install sanitary lateral extension (relay); Linear Furnish and install connection t0 existing 8" 300 mains; com fete ass ecifi Furnish and install connection to existing 12" 1304 mains; com late ass ecifi Furnish and install connection to existing 18" sanitary sewer mains; M8 com late ass ecifed Furnish and install connection to existing 24" sanitary sewer mains; 3312 com late ass ecifed Furnish and install connection to existing 42" sanitary sewer mains; Each concrete collars; specified Each 2.00 2.00 l 10" en cutplete ;sewer as Linear Feet 40.00 20.00 complete Linear Feet 3,570,00 3,001.7( and damage survey; e.e o�e'iflod Each 100.00 92.0( UNIT IMltlh ov DECREASE IN PRICE CONTRACT CONTRACTPRICE PRICE using push camera; compinrc 5.00 10.00 5.00 $350.00 $1,75U.UU 3710 as s ecifed Abandon sanitary sewer Each manholes; complete as 1.00 0.00 1 00 $780 00 $780.00 3800 s ecifed Abandon 8" sanitary sewer; Each Linear 99.00 99.00 $14.30 3802 com late ass ecifed Abandon 12" sanitary sewer; Feet Linear 24.70 24.70 $16.60 3806 complete as s ecified Remove sanitary sewer Feet manholes; complete as 3.00 2.00 _ 1 p0 $870.00 $870.00 3852 s ecified Remove sanitary sewer; Each Linear 233.00 233.00 $35.00 3854 com late ass ecified Sanitary sewer utility line Feet opening (ULO); complete as 1.00 _2 Op $500.00 $1,000.00 3890 s ecified Excavation special (sanitary); Each 3.00 $25.00 3892 com late asspecified Furnish and install 4" ductile Tons 4,621.63 4,521.63 iron water main (relay) with polywrap; complete as Linear 55.00 47.40 _7 60 $150.00 $1,140.00 4000 specified Feet Page 7 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN CONTRACTPRICE ITEM NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE and install 6" ductile Furnish iron water main (relay) with polywrap; complete as Linear 350.00 333.35 -16.65 $114.00 $1,898.10 4002 s ecified and install 8" ductile Feet Furnish iron water main (relay) with polywrap; complete as Linear 3,450.00 3,429.95 -20.05 $95.00 $1,904.75 4004 s ecified and install 12" ductile Feet Furnish iron water main (relay) with polywrap; complete as Linear MOM 183.00 -17 00 $170.00 $2,890.00 4008 s ecified Furnish and install 1"water Feet service (relay); complete as Linear 2.628.00 2,404.50 -223.50 $78.00 $17,433.00 4036 s ecified Furnish and install 2" water Feet service (relay); complete as Linear 42.00 32.00 -10.00 $140.00 $1,400.00 4040 s ecified Furnish and install 1" Feet corporation and stop box; _2 00 $450.00 $900.00 4048 com late ass ecified Furnish and install 2" Each 80.00 78.00 corporation and stop box; 1.00 1.00 $1,280.00 4053 com fete ass ecified Furnish and install water Each service clay dams; complete 80.00 77.00 -3.00 $116.00 $348.00 4055 ass ecified Furnish and install Each connections to existing 4" water main; complete as 1.00 1.00 $1,880.00 4056 s ecified Furnish and install Each connections to existing 6" water main; complete as 8.00 -1 p0 $1,940.00 $1,940.00 4058 s ecified Furnish and install Each 9.001 connections to existing 8" water main; complete as 2.00 2.00 $2,300.00 4060 s ecified Furnish and install Each connections to existing 12" water main; complete as 2.00 2.00 $2,500.00 4064 s ecified Furnish and install 8" x 4" Each water main tee; complete as $375.00 4109 se cifed Furnish and install 8" x 6" Each 1.00 1.00 water main tee; complete as 9.00 _1 0p $420.00 $420.00 4110 s ecified Furnish and install 8" x 8" Each 10.00 water main tee; complete as 4.00 $540.00 4111 s ecified Furnish and install 12" x 6" Each 4.00 water main tee; complete as 3.00 $765.00 4128 s ecified Furnish and install 8" x 8" Each 3.00 water main cross; complete 2.00 2.00 $690.00 4189 ass ecified Furnish and install 8" x 12" Each water main cross; complete 1.00 1.00 $1,100.00 4191 ass ecified Each Page 8 or 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) CONTRACT INSTALLED NET NET INCREASE IN DECREASEIN UNIT CONTRACT CONTRACTPRICE ITEM DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE NUMBER Furnish and install 4" 45 degree water main bend; pp $160.00 $320.00 4235 com late ass ecified Each 2.00 0.00 _2 Furnish and install 6" 45 degree water main bend; 31.00 -15.00 $210.0- $3,150.00 4236 com late ass ecified Each 46.00 Furnish and install 8" 45 degree water main bend; _2 pp $290.00 $580.00 4237 com late as s ecified Each 10.00 8.00 Furnish and install 12" 45 degree water main bend; 4.00 4.00 $645.00 4239 com late ass ecified Each Furnish and install 6" water main cap; complete as 1.00 1.00 $110.00 4254 s ecified Each Furnish and install 8" x 6' water main reducer; complete $250.00 $250.00 4264 ass ecified Each 8.00 7.00 -1.00 Cut and cap existing 6" water 1.00 7.00 6.00 $100.00 $600.00 4352 main; com late ass ecified Each Cut and cap existing 8" water 0.00 -1.00 $100.00 $100.00 4354 main; com late ass ecified Each 1.00 Cut and cap existing 12" water main; complete as 2.00 0.00 _2 pp $100.00 $200.00 4358 s ecified Each Furnish and install 4" water main gate valve; complete as 1.00 $1,000.00 4400 specified Each 1.00 Furnish and install 6" water main gate valve; complete as 14.00 14.00 $1,120.00 4401 s ecified Each Furnish and install 8" water main gate valve; complete as 29.00 1.00 $1,580.00 $1,580.00 4402 s ecified Each 28.00 Furnish and install 12" water main gate valve; complete as 4.00 $2,570.00 4404 s ecified Each 4.00 Furnish and install hydrant; 11.00 11.00 $3,940.00 4500 com late ass ecified Each Furnish and install 2" water main casing pipe; complete Linear $54.00 4712 ass ecified Feet 10.00 10.00 Furnish and install 4" water main casing pipe; complete Linear $66.00 4714 ass ecified Feet 10.00 10.00 Furnish and install 10" water main casing pipe; complete Linear $66.00 $1,320.00 4720 ass ecified Feet 20.00 0.00 -20.00 Furnish and install 18" water main casing pipe; complete Linear -6.00 $98.00 $588.00 4726 ass ecified Feet 40.00 34.00 Rock excavation; complete Linear 237.00 175.00 -62.00 $0.01 $0.62 4801 ass ecified Feet Abandon water main on Oregon Street; complete as Lump 1.00 $6,000.00 4900 s ecified Sum 1.00 Remove water main; Linear 920.00 920.00 $34.00 4920 com late ass ecified Feet Page 9 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE on special (water); -25.00 $2' e� enoeifiwd Tons 25.00 0.00 VCREASEIN DECREASEIN CONTRACT CONTRACT PRICE Furnish and install pull box (non-conductive); 18" x 36"; _1 pp $1,480.00 $1,480.00 013 complete ass specified Each 33.00 32.00 Furnish and install pull box (nonconductive); 24" x 42"; -1.00 :$1,5 30.00 $1,530.00 ,019 comp late ass ecified Each 12.00 11.00 Cdh.st nnll hox: complete as .. __ .. ne nn 1R5 R32.001 pull box; complet fled :concrete base; e as specified and install control complete as Furnish and install 2" Schedule 40 PVC; complete Linear 20 ass ecified Furnish and install 3" Feet 3, Schedule 40 PVC; complete Linear Feet 7 Furnish and install 4 gauge red -coated wire; complete as Linear ed Furnish and install 4 gauge Feet coated wire; complete Linear cified h and install 6 gauge WecifiedFeet Feet ated wire; complete as Linear fied and install 6 gauge Feeth ....��uA u im- emm�letP a Linear 5261 1 -1.00 -1.00 Ito qna nm s ecified Feet 3,640.00 1,434.00 -�.���•�� Furnish and install 8 gauge green -coated wire; complete Linear 3.00 $1 pp $3.00 ass ecified Feet 7,500.00 7,503.00 Furnish and install 10 gauge red -coated wire; complete as Linear $0.60 $19.80 s ecified Feet 620.00 587.00 -33.00 Furnish and install 10 gauge black -coated wire; complete Linear -33.00 $0.60 $19.80 ec� as s ed Feet 620.00 587.00 Furnish and install 10 gauge green -coated wire; complete Linear $0.60 $9.60 ass ecified Feet 880.00 864.00 -16.00 Furnish and install 12 gauge red -coated wire; complete as Linear 640.00 720.00 80.00 $0.60 $48.00 s cified Feet Furnish and install 12 gauge black -coated wire; complete Linear 640.00 720.00 80.00 $0.60 $48.00 ass ecified Feet Page 10 of 13 CONTRACT 19-06 CHANGE ORDER #2 (FINAL) INCREASEIN DECREASEIN UNIT CONTRACT INSTALLED NET ITEM DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE NET DECREASE CONTRACT CONTRACTPRICE PRICE PRICE NUMBER Furnish and install 12 gauge green -coated wire; complete Linear 640.00 720.00 80.00 $0.60 $48.00 5272 ass ecified Feet Furnish and install 14 gauge green -coated wire; complete Linear 3'I MOO 3,135.00 25.00 $0.60 $15.00 5282 ass ecified Feet Furnish and install 14 gauge stranded single pair twisted with shield; complete as Linear 780.00 760.00 -20.00 $1.50 $30.00 5356 s ecified Feet Furnish and install 14 AWG solid 3 conductor; complete Linear -15.00 $1.25 $18.75 5360 as ecified Feet 60.00 45.00 Furnish and install 14 AWG solid 5 conductor; complete Linear -20.00 $1.50 $30.00 5362 ass ecified Feet 90.00 70.00 Furnish and install 14 AWG solid 7 conductor; complete Linear 0.00 -180.00 $1.50 $270.00 5364 ass ecified Feet 180.00 Furnish and install 14 AWG solid 9 conductor; complete Linear 291.00 81.00 $2 p0 $162.00 5366 ass ecified Feet 210.00 Furnish and install 14 AWG solid 21 conductor; complete Linear 1,140.00 1,206.00 66.00 $3.60 $237.60 5372 as ecified Feet Furnish and install fuse 70.00 68.00 _2 pp $51.00 $102.00 5380 holder; com late ass ecified Each Furnish and install 5A fuse; 70.00 68.00 _2 0p $5.00 $10.00 5392 com late ass ecified Each Install single head fixture; City Supplied'; complete as 2.00 2.00 $155.00 5400 s ecified Each Install light pole and pole top lights; "City Supplied"; 33.00 33.00 $515.00 5410 com late ass ecified Each Install 13' traffic signal pole with a decorative base; "City Supplied; complete as 3.00 5.00 2.00 $200.00 $400.00 5421 s ecified Each Install 15traffic signal pole; ,,City Supplied'; complete as 2.00 -1.00 $200.00 $200.00 5422 s ecified Each 3.00 Install 20' traffic signal pole; ,,City Supplied"; complete as 1.00 $400.00 5424 s ecified Each 1.00 Install 30' traffic signal pole; "City Supplied" complete as 1.00 $410.00 5426 s ecified Each 1.00 Install 25' trombone arm; ,,City Supplied" complete as 2.00 $335.00 5431 s ecified Each 2.00 Install five -head traffic signal; ,,City Supplied" complete as 7.00 7.00 $180.00 5434 s ecified Each Install three -head traffic signal; ,City Supplied" 2.00 2.00 $255.00 5436 com late ass ecified Each Page 11 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) ITEM NUMBER 5438 5440 5504 DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET UNIT DECREASE PRICE INCREASEIN CONTRACT PRICE DECREASEIN CONTRACTPRICE Install pedestrian signal; "City Supplied"; complete as 6.00 6.00 $155.00 s ecified Each Install pedestrian push button; "City Supplied"; $130.00 complete asspecified Each 6.00 6.00 Furnish and install Type 2 -3.00 $900.00 $2,700.00 Base; com late ass ecified Each 13.00 10.00 Furnish and install Type 5 $766.00 Base; corn late as s ecified Each 33.00 33.00 Furnish and install Type 9 $5,100.00 Base; complete ass ecified Each 2.00 2.00 SECTION I (BID ITEMS 1050 - 5506) - SUBTOTAL: NET DECREASE TO SECTION I: $314,129.32 ($428,666.49) ($114,537.17) ALTERNATE 2 CONTRACT INSTALLED NET NET UNIT CONTRACT DECREASE IN CONTRACTPRICE ITEM DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE NUMBER Furnish and install 42" sanitary sewer (new); Linear Feet 3,010.00 3001.70 -8.30 $660.00 -$5,478.00 3048-2 wm late ass ecified Furnish and install sanitary sewer manhole junction chamber 0-1; complete as Each 1.00 1.00 $12,000.00 3113A-2 s ecified Furnish and install sanitary sewer manhole junction chamber 0-3; complete as 1.00 $12,000.00 3113B-2 s ecified Each Furnish and install sanitary 1.00 sewer manhole junction chamber 0-4; complete as 1.00 $12,000.00 3113C-2 s ecified Each Furnish and install sanitary 1.00 sewer manhole junction chamber 0-5; complete as 1.00 $12,000.00 3113D-2 s ecified Each Furnish and install sanitary 1.00 sewer manhole junction chamber 0-6; complete as 1.00 $12,000.00 3113E-2 s ecified Each Furnish and install sanitary 1.00 sewer manhole junction chamber 0-8; complete as 1.00 $12,000.00 3113F-2 s ecified Each Furnish and install sanitary 1.00 sewer manhole junction chamber 0-9; complete as 1.00 $12,000.00 3113G-2 s ecified Each Furnish and install sanitary 1.00 sewer manhole junction chamber 0-10; complete as 1.00 $12,000.00 3113H-2 s ecified Each 1.00 Page 12 of 13 CONTRACT 19-05 CHANGE ORDER #2 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE ALTERNATE 2 (BID ITEMS 3048-2 - 3113H-2) - SUBTOTAL: NET DECREASE TO ALTERNATE 2: $0.00 ($5,478.UU) ($5,478.UU) HUUI I I V 14Mu V V V M, V JNCREASEIN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET INCREASE NET DECREASE UNIT PRICE CONTRACT DECREASE IN CONTRACTPRICE R NUMBER QUANTITY QUANTITIES combined 8" relay along existing sanitary sewer alignment; complete as Linear s ecifed Feet 732.00 732.00 $67.50 ECB#1 Individual 8" relay along existing sanitary sewer alignment; complete as Linear specified Feet 300.00 300.00 $79.00 Furnish and install 12" sanitary sewer drop at manhole 0-4; complete as Vertical 1-30002 specified Feet 7.64 7.64 $420.00 Furnish and install bentonite 1-30003 1 dam; complete asspecified Each 2.00 2.00 $2,007.00 Furnish and install small bentonite dam 19th/Oregon; 1-30004 complete asspecified Each 1.00 1.00 $1,252.00 ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 1-30000 - 1-30004) - SUBTOTAL: NET INCREASE: $0.00 $0.00 $0.00 HUUI I I V IIryL ITEM NUMBER V V V MM nCW UIn"V. — me DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASEIN CONTRACTPRICE Time and materials for storm sewer plates; complete as 2-20000 specified 0.00 1.00 1.00 $2,929.03 $2,929.03 Time and materials for Lsmm setting hydrant at 17th intersection; complete as 2-40000 s ecifed 0.00 1.00 1.00 $1,125.58 $1,125.58 ADDITIONAL WORK REQUIRED: CO #2 (BID ITEMS 2-20000 - 2-40000) - SUBTOTAL: $4,054.61 $0.00 NET INCREASE: $4,054.61 NET DECREASE TO SECTION I: ($114,537.17) NET DECREASE TO ALTERNATE 2: ($5,478.00) NET INCREASE TO SECTION I: $4,054.61 NET DECREASE TO CONTRACT: ($115,960.56) Page 13 of 13