Loading...
HomeMy WebLinkAboutChange No 2- Al Dix ConcreteCityof Oshkosh March 23, 2020 Al Dix Al Dix Concrete, Inc. 401 Gertrude Street Kaukauna, WI 54130 RE: Change Order No. 2 (Final) Contract 18-06 Dear Al: Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and Al Dix Concrete, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, 2es Rabe, P.E., CPESC / Director of Public Works JER/t1t Enclosure: Change Order No. 2 (Final) cc: Pam Ubrig, City Clerk (w/original); RECEIVED Jennifer Messerschmidt, Assistant Finance Director (w/copy) MAR 2 3 2020 File (w/original) CITY CLERK'S OFFICE I:\E Oeedn8U018CONrRACrS\18-06Sidewalk Rehab\ProjecLWomadw\contracthtfo\Gang. Page 1 of 1 Orders\1806 Ez Ied CO n (Final) Ltr-;1-73-28.doa City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.,Wi.us TO: AL DIX CONCRETE, INC. 401 GERTRUDE STREET KAUKAUNA, WI 54130 CHANGE ORDER #2 FINAL DATE: FEBRUARY 14, 2020 Your present contract with the City of Oshkosh, Contract No. 18-06, awarded March 27, 2018, is hereby amended and changed as follows: NET DECREASE TO UNIT A: ($12,749.92) NET DECREASE TO UNIT B: $0.00 NET DECREASE TO UNIT C: $0.00 NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: $0.00 NET DECREASE TO CONTRACT ($12,749.92) SECTION I TOTALS BID TOTAL $1,279,130.00 $1,279,130.00 CO #1 $300,691.64 $300,691.64 PREVIOUS CONTRACT TOTAL $1,579,821.64 $1,679,821.64 CO#2 ($12,749.92) ($12,749.92)' CONTRACTTOTAL $1,567,071.72 $1,667,071.72 CITY OF OSHKOSH M. Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptrpi er CONTRACT 18-06 CHANGE ORDER 02 FINAL 18-06 VVUKR UM1I M INCREASE IN DECREASE IN ITEM NUMBER I DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE CONTRACT PRICE CONTRACT PRICE Removing concrete and asphalt sidewalk and driveway; complete as Square A-1120 specified Feet 133,796.74 130,796.79 -2,999.95 $1.50 $4499.92 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square A-1308 asspecified Yards 91.27 91.27 $68.00 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square A-1318 asspecified Yards 1,740.77 1.740.77 $75.00 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square A-1319 ass ecified Yards 181.17 181.17 $83.00 Adjust manholes and inlets; A-1360 complete as sDecified Each 6.00 6.00 $400.00 Turf restoration; complete as Square A-1370 specified Yards 94.97 94.97 $12.00 Up -charge for late season cold weather concrete :j_ pavement; complete as Cubic A-1390 specified Yards 171.32 171.32 $9.00 12' radious curb with 6" CABC and grading; complete Linear A-1410 asspecified Feet 0.00 0.00 $12.00 18" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Linear A-1428 asspecified Feet 304.30 304.301 $65.00 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Linear A-1448 asspecified Feet 2,985.601 2,985.60 $68.00 Page 1 of 5 CONTRACT 18-06 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Sidewalk curb; complete as Linear A-1460 specified Feet 538.70 538.70 $50.00 4" concrete sidewalk with 3" CABC and grading; complete Square A-1500 a specified Feet 90,513.67 90.513.67 $4.50 4" concrete sidewalk with 3" CABC and grading; in existing subdivisions; Square com lete a s ecified Feet 8,910.30 8.910.30 $5.25 E 4" concrete sidewalk with 3" CABC and grading; water dept. locations; complete a Square specified Feet 1,832.69 1,832.69 $8.00 6" concrete sidewalk/driveway /ramp with 3" CABC and grading; Square A-1510 complete asspecified Feet 40,156.33 40,156.33 $6.25 6" concrete sidewalk/driveway /ramp with 3" CABC and grading; water dept. locations; complete as Square A-1512 specified Feet 976.78 976.78 $8.75 8" concrete sidewalk/driveway /ramp with 3" CABC and grading; Square A-1520 complete asspecified Feet 3,709.85 2,709.85 -1,000.00 $8.25 $8,250.00 6" concrete sidewalk with 3" CABC and grading; London Paver Pattern; complete as Square A-1526 specified Feet 62.80 62.80 $65.00 Curb ramp detectable warning field (natural/non- painted); complete as Square A-1540 specified Feet 560.00 560.00 $35.00 No. 4 reinforcing rods - deformed; epoxy -coated; Linear A-1550 complete ass specified Feet 544.00 544.00 $2.50 Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; A-1560 complete asspecified Each 9,298.00 9,298.00 $6.50 Cold weather covering (sidewalk) - single visquine; Square A-1580 complete asspecified Feet 0.00 0.00 $1.00 Cold weather covering (sidewalk) - double visquine; Square A-1582 complete asspecified Feet 0.00 0.00 $1.00 (sidewalk) - double visquine with 6" hay; complete as Square specified Feet 0.00 0.00 $1.00 Up -charge for late season cold weather concrete sidewalk; complete as Cubic E1700 specified Yards 0.00 0.00 $9.00 Sawing existing pavement; Linear complete ass specified Feet 2.046.40 2,046.40 $5.00 Profile saw cut concrete curb; Linear complete ass specified Feet 39.00 39.00 $50.00 Page 2 of 5 CONTRACT 18-06 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Re -grade existing gravel driveways; complete as Square A-1820 specified Feet 0.00 0.00 $20.00 5" asphaltic surface MT with 6" CABC and grading; Square A-1915 lcomplete asspecified Yards 1 0.00 0.00 $65.00 4" asphaltic surface LT with 6" CABC and grading; Square A-1916 complete asspecified Yards 494.13 494.13 $65.00 2" asphaltic surface LT with 6" CABC and grading; Square A-1917 complete asspecified Yards 218.40 218.40 $65.00 WORK UNIT A (BID ITEMS A-1120 - A-1917) - SUBTOTAL: $0.00 ($12,749.92) NET DECREASE TO WORK UNIT A: ($12,749.92) WORK UNIT R ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET I NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square B-1308 asspecified Yards 1 818.301 818.30 818.30 $68.00 Crushed aggregate base course; complete as B-1340 s ecified Tons 112.78 112.78 112.78 1 $20.00 Adjust manholes and inlets; 1 B-1360 com fete as s ecified Each 0.00 0.00 0.00 $400.00 WORK UNIT B (BID ITEMS B-1308 - B-1360) -SUBTOTAL: $0.00 $0.00 NET INCREASE TO WORK UNIT B: $0.00 WORK UNIT C DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT DECREISE IN CONTRACT Removing concrete and asphalt sidewalk and rITEM driveway; complete as Square s ecified Feet 784.00 784.00 $1.50 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square C-1318 lasspecified I Yards 1 407.901 407.901 1 1 $75.00 Page 3 or 5 CONTRACT 18-06 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT ICREASEIN CONTRACT DECREASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square C-1319 I asspecified Yards 1 0.00 0.00 1 $80.00 Crushed aggregate base course; complete as C-1340 specified Tons 46.70 46.70 $25.00 Adjust manholes and inlets; C-1360 complete asspecified Each 0.00 0.00 $400.00 18" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Linear C-1428 asspecified Feet 0.001 0.00 $65.00 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Linear C-1448 asspecified Feet 100.00 100.00 $68.00 4" concrete sidewalk with 3" CABC and grading; complete Square C-1500 a specified Feet 457.20 457.20 $4.50 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square C-1510 specified Feet 326.80 326.80 $5.25 Curb ramp detectable warning field (natural/non- painted); complete as Square C-1540 specified Feet 24.001 24.00 $35.00 Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; C-1560 complete asspecified Each 32.00 32.00 $6.50 Sawing existing pavement; Linear C-1700 complete asspecified Feet 7.50 7.50 $5.00 WORK UNIT C (BID ITEMS C-1120 - C-1700) -SUBTOTAL: $0.00 $0.00 NET INCREASE TO WORK UNIT C: $0.00 AnnITInNAI WORK RFOI IIRFIP ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE Cold Weather Covering (concrete pavement) - Single Square 1-1380 Vis uine Yards 617.86 617.86 $3.50 Page 4 of 5 CONTRACT 18-06 CHANGE ORDER #2 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT ICREASEIN CONTRACT DECREASEIN CONTRACT NUMBER QUAN77TY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Extra time and materials to remove and fill the vaults within the righ-of-way on Brown Street and High Lump 1-10000 Avenue Sum 1.00 1.00 $2000.00 Extra time and materials to pour light bases within Lump 1-10001 Isidewalk rehab areas I Sum 1 1.00 1 1.00 1 $2,900.00 Extra work for using a power buggy to transport concrete Lump 1-10002 through side yards Sum 1.00 1.00 $250.00 ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 1-1380 - 1-10002) - SUBTOTAL: $0.00 $0.00 NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: $0.00 NET DECREASE TO WORK UNIT A NET INCREASE TO WORK UNIT B NET INCREASE TO WORK UNIT C NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: NET DECREASE TO CONTRACT: ($12,749.92) $0.00 $0.00 $0.00 ($12,749.92) Page 5 of