The undersigned, owner of property benefited by the following improvements to be made by the
City of Oshkosh, Winnebago County, State of Wisconsin, to wit:
For public construction, surveying and inspection of concrete sidewalk and terrace tree
installation.
For private construction and public inspection and survey for sanitary sewer, storm sewer, water
main, laterals, grading & graveling, and concrete street pavement.
In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I
hereby admit that such public improvement will benefit said property and consent to the levying
of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for
the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I
hereby waive all special assessment notices and hearings required by Section 66.0703 of the
Wisconsin Statutes; and I further agree and admit that the benefit of my property from the
construction of such improvements is in proportion to the footage thereof:
Description of Premises
Pickart Estates Phase 1
Lots 1-24 and Outlot 1 and 4
Construction of Pants Place, Marys Drive, Roberts Drive and Jimmys Drive
1. Sanitary Sewer & Laterals (Private Construction)
Estimated Construction Cost $241,457.00 Private
6% Survey and Inspection $14,487.42 Payment
2. Water Main with Laterals (Private Construction)
Estimated Construction Cost $266,759.00 Private
6% Survey and Inspection $16,005.54 Payment
3. Storm Sewer w/Laterals (Private Construction)
Estimated Construction Cost $196,570.00 Private
6% Survey and Inspection $11,794.20 Payment
4. Grading, Graveling and Restoration (Private Construction)
Estimated Construction Cost $78,299.46 Private
6% Survey and Inspection $4,697.97 Payment
I:W,,praj*Wuva of Spaisl h nvoaVWaaofSprnd A - by SuMvniooTirYa ft\PhaselVicFnt Estrum Phawl Wvver-mi�eddoc I�o�2��
CITY CLt::..:•..'4 C%['t`t�{�
Pickart Estates Phase I
Page 3 of 5
8. Street Lighting
Lighting fixture/equipment acquisition $46,200.00 Private
Estimated Construction Cost (Public) $4,900.00 Payment
Includes installing bases, poles and fixtures
6°/u Survey and Inspection $2,772.00 Payment
9. Terrace Trees (Public Construction) Assess
Assessment Rate = $300 per tree
Outlot I and 4 - 15 trees at $300 each= $4,500.00.
Each lot assessed $187.50 for Outlot I's 4 trees
Estimated number
Tree Cost
Lot #
of terrace trees
Estimate
1
4.00
$1,387.50
2
2.00
$787.50
3
1.00
$487.50
4
1.00
$487.50
5
2.00
$787.50
6
5.00
$1,687.50
7
2.00
$787.50
8
2.00
$787.50
9
1.00
$487.50
10
3.00
$1,087.50
11
2.00
$787.50
12
2.00
$787.50
13
2.00
$787.50
14
3.00
$1,087.50
15
2.00
$787.50
16
2.00
$787.50
17
1.00
$487.50
18
2.00
$787.50
19
1.00
$487.50
20
2.00
$787.50
21
2.00
$787.50
22
2.00
$787.50
23
2.00
$787.50
24
2.00
$787.50
10. Final Plat Monuments (Private)
Estimated Construction Cost $3,000.00 Private
1:\Flgke v\Waive asps 0.aesmm\Wwm ofspamA -by SuStiveba\Pi EatlaWhax 1\PivYen Pswe, Phan 1 Waiver-rti,ed
Pickart Estates Phase 1
Page 2 of 5
5. Detention Basin Grading, Site Work and Restoration (Private Construction, Private
Survey/Inspection)
Estimated Construction Cost $225,116.30 Private
6% Survey and Inspection $0.00 Payment
6. Sidewalk (Public Construction) Assess
Assessment Rate = $25.00 per front foot of each lot
Includes 6% for Inspection and Surveying
Pickart Estates, Phase 1
Lot #
Sidewalk Footage
Sidewalk Cost Estimate
1
215.35
$5,383.75
2
85.00
$2,125.00
3
85.00
$2,125.00
4
85.00
$2,125.00
5
212.48
$5,312.00
6
210.62
$5,265.50
7
80.21
$2,005.25
8
80.21
$2,005.25
9
80.21
$2,005.25
10
110.84
$2,771.00
11
105.95
$2,648.75
12
83.42
$2,085.50
13
84.58
$2,114.50
14
218.08
$5,452.00
15
83.00
$2,075.00
16
83.00
$2,075.00
17
83.00
$2,075.00
18
83.00
$2,075.00
19
83.00
$2,075.00
20
83.00
$2,075.00
21
90.00
$2,250.00
22
90.00
$2,250.00
23
90.00
$2,250.00
24
226.07
$5,651.75
7. Concrete Street Paving (Private) -Paving completed by July 31, 2021.
Native backfill to be used in utility trenches, utilities must be completed by
December 1, 2018. No paving until trenches have settled for three winter seasons.
1,950 Center Line Feet of Roadway at $220/lf = $429,000.00
Eleven (11) Handicapped Ramps at $600.00 each = $6,600.00
Sidewalk installation for Outlot 1 and 4-1051.23 ft at $25/ft= $26,280.75
Estimated Construction Cost $461,880.75 Private
6% Survey and Inspection $27,712.85 Payment
I MWwmn#\WuvcofSµ 9Asess kWe aofSpe As by Sub vi,ioo�nlAu,e ITUh Fs mP lWuivu�dm
Pickart Estates Phase I
Page 4 of 5
Summary of Cost Calculations
Engr. and
Dev Agree Waiver Section
Private Cost
Inspection (Public) Public Construction
1
$241,457.00
$14,487.42
2
$266,759.00
$16,005.54
3
$196,570.00
$11,794.20
4
$78,299-46
$4,697.97
5
$225,116.30
$0.00
6
$0.00
$0.00
7
$461,880.75
$27,712.85
8
$46,200.00
$2,772.00 $4,900.00
9
$0.00
$0.00
10
$3,000.00
$0.00
Totals
$1,519,282.51
$77,469.97 $4,900.00
4 — Year Irrevocable Letter of Credit or Bond for Private Construction = $1,519,282.51
Cash Payment for Public Engineering, Inspection and Construction = $82,369.97
2 — Year Irrevocable Letter of Credit after Acceptance of Private Construction = $303,856.50
Signature of Owner:
Paul Pickart
Signature of Developer: K&P Developement
Kevin K. Jaenke, Managing Member
Date
Date
P\Pngveci WvvaurSpdW�Wmmof5pv"�- M SubdlrivonTjr Peeve U�=I� Pb IWma-revudAoc
Pickart Estates Phase 1
Page 5 of 5
LwAg'uinrl*wwvc ofsp¢id Asessme kwm%s ofspma -by sub vision\PihN EVetedWme l� F. PM1 Iwwm-m as c