HomeMy WebLinkAboutAmendment Request No 2 Southwest Industrial Park ExpansionA=C'OM
AECOM
658 North Main Street
Oshkosh, WI, 54901
aecom.00m
Mr. James Rabe, PE, CPESC
Director of Public Works
City of Oshkosh
215 Church Avenue
Oshkosh, WI 54901
gECEIVED
v , 4 2p19
ND I�W000
DOSNKp N *ISCDN$1N
October 31, 2019
AECOM Project No.
60578876
AECOM Proposal No.
OPP-813123
City Purchase Order No.
180814-00
Amendment Request No. 2 to Establish Lot Corners Related to CSM No. 2 for the Southwest Industrial Park
Expansion located in Oshkosh, Wisconsin
Dear Mr. Rabe,
AECOM Technical Services, Inc. (AECOM) is proposing Amendment No. 2 to Proposal Number OPP-813123, dated
May 11, 2018, and Amendment No. 1 dated June 4, 2019 to add additional funds for pinning the lot corners of
Certified Survey Map (CSM) No. 2 per State of Wisconsin requirements.
Project Background
AECOM began assisting the City in preparing a draft Plat Map and associated legal descriptions under a Task Order
as part of the 2017 General Structural Services Agreement. That approved budget and associated scope of work was
completed in late 2017. After completing that scope of work, subsequent revisions to the plat beyond the original
approved scope of work were requested by the Planning Services and Engineering Divisions. The work involved in
those revisions was completed under a separate agreement, dated May 11, 2018.
During the summer of 2018, City staff determined utilizing CSM's in lieu of a Plat Map would be a better course of
action and provide more flexibility to the City in the long term. This change in direction was the result of increased
interest in development of some of the available land including three potential railroad spurs. The CSM approach
allowed for an expedited method for creation of lots and easements to meet the property development schedules. As
a result, with City staff permission, AECOM utilized remaining funds not utilized in Proposal Number OPP-813123 to
start the preparation of CSM No. 1 and thirteen associated easements. We anticipate two additional CSMs (CSM No.
2 and CSM No. 3) with associated easements will be completed to fully develop the anticipated lots and required
easements.
Amendment No. 1 requested additional funds to complete CSM No. 1 and CSM No. 2, removal of the Plat Map lot
corner pins previously installed and the installation of the lot corner pins for CSM No. 1. CSM No. 1 and CSM No. 2
were completed and CSM No. 1 lot comers were pinned. Services provided beyond the Amendment No. 1 budget
included multiple revisions of CSM No. 2 to accommodate developer requests. In addition, during the pinning of CSM
No. 1 lot comers and removing the Plat Map comers that were no longer required, it was discovered that Compass
Way 3/4" rebar pins had been replaced with 14" long 2" diameter pipe. We were directed to remove the pipes and re -
pin with rebar as was originally completed. With the additional work we utilized all of the approved budget in
Amendment No. 1.
CSM No. 2
CSM No. 2 was completed in August 2019. After development of the draft CSM, the following revisions occurred:
, =
• Complete four revisions of the CSM which included three lots s.,.
Added a triangle outlot for the railroad NOV - g 2019
• Split Lot 2 into two lots
• Final version of CSM contained one outlot and Lots 1 and 2 — — 'rCF
KAProjects\60578876_SWIP Plat Map\700-Contrach60578876_SWIP Plat Map Amendment Request 2.d= 1/4
i
1i A=COM
• Verify coordinates with three Professional Licensed Surveyor's (PLS) and worked with City staff
The effort to complete this work was beyond the proposed budget provided in Amendment No. 1.
Lot Pinning — Completed
AECOM surveyors, under direction of a PLS, established all lot corners created by CSM No. 1. In addition, AECOM
staff removed the previously -installed Plat Map lot and ROW comers that were no longer be required. During this
work it was discovered that all the 3/4" rebar pins previously installed by AECOM along Compass Way had been
replaced with 2" diameter pipe approximately 14" long. The pipe locations were located close but not exactly correct.
We were directed by City staff to reinstall the rebar for consistent and accuracy of the lot corners and right-of-ways
locations on the site.
Lot Pinning — Proposed
We anticipate it will take approximately two 8-hour days with a 2-person crew under the direction of a PLS to install all
the pins for CSM No. 2. Included in the time estimate is setting pins for the right-of-way radius for the transition from
Compass Way to Transport Drive. The cost for pin installation, including equipment, is estimated to be $3,600.
Additional Proposed Budget
AECOM has fully utilized the Amendment No. 1 budget as described above. We estimate approximately $3,600 to
complete pinning of CSM No. 2, and the right-of-way for the transition from Compass Way to Transport Drive.
Therefore, we are requesting a total budget increase of $3,600.
As with all our agreements, AECOM will only bill for actual time incurred. We reserve the right to request changes in
budgets if the scope of work varies from our project assumptions. This includes increases as well as decreases in our
budget.
The services provided will be performed in accordance with the approved Fee Schedule and conditions of the General
Conditions of Service — City of Oshkosh, April 2009, which are expressly incorporated into, and are an integral part of,
our agreement for professional services.
If you have any questions or need to clarify a point, please call any of the undersigned at 920-236-6718
Yours sincerely,
AECOM Technical Services, Inc.
Paul F. Timm
Account Manager
encl: Amendment to Agreement
Amendment Authorization
Kevin L. Breh�yrw
Associate Vice President
K:\Projects\60578876_SWIP Plat Map\100-Contract\60578876_SWIP Plat Map Amendment Request 2.docx 2/4
AECOM
558 N Main Street
Oshkosh, WI 54901
920.236.6710
Amendment to Agreement
Amendment No. 2
AECOM Proposal No. OPP-813123
City of Oshkosh Purchase Order No. 180814-00
AECOM Project No. 60578876
RETURN TO: AECOM
558 North Main Street
Oshkosh, WI 54901
Attention: Paul Timm
Date: October 31. 2019
Summary Original Contract Value
$10,460
Total Previous Amendments
$17,180
Amount this Amendment
$3,600
Revised Contract Amount
$31,240
Task # Description
3 Establishment of Lot Corners
Amount
$3,600
TOTAL $3,600
K \Projects\60578876_SWIP Plat MapV 00-Contract160578876_SWIP Plat Map Amendment Request 2.docx 3/4
F.A't:140�"
Authorization
October 31, 2019
558 N Main Street
Oshkosh, WI 54901
920.236.6710
I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this
contract.
I hereby authorize AECOM to proceed with the scope of work outlined in Amendment No. 2 to the agreement
dated May 11, 2018, OPP-813123 and Amendment No. 1 dated June 4, 2019 related to the Proposal to
Complete the Final Plat and Establish Lot Comers by Preparing Two Certified Survey Maps In -lieu of a Plat
Map for the Southwest Industrial Park Expansion located in Oshkosh, Wisconsin with a revised total budget
authorization of $31,240 under the general terms and conditions specified in the proposal.
i�
Sigffaaatureur
Mark A Rohloff
Print Name
City Manager
Title/Organization
Signature
Pamela R. Ubrig
Print Name
City Clerk
Title/Organization
�ure
Lynn A. Lorenson
Print Name
City Attorney
Title/Organization
Signature
Russ Van Gompel
Print Name
Director of Finance
Title/Organization
1.1161(9
Date
Date
Date
/ /
Date
K:\Projects\60578876_SWIP Plat Map\100-Contrad180578876_SWIP Plat Map Amendment Request 2.00u 4/4