HomeMy WebLinkAboutContract 18-02 Libbey/Nicolet Watershed/ N Main Stp_COM Mr. James Rabe, PE, CPESC Director of Public Works City of Oshkosh us RECEIVED OCT 15 2019 DEPT OF PUBLIC WORKS OSH ,O H. W SCONSIN AECOM Mein Street 55B 1400 54901 Oshkosh, WI, aecom.com October 15, 2019 AECOM Pro]ect No. 60565413 City Contract No. 16-02. City purchase Order No. 180340-00 215 Church mv-n Contract 18-02, Oshkosh,MB and Documentation Services Related to City Amendment Request No. 2 for Constructi54901 on Monitoring ubbeylNicolet Watershed/North Main Street Area Detention Basin, Oshkosh, Wisconsin. Dear Mr. Rabe, . s proposing an amendment to the agreement dated January rvi B. AECOM Technical Services, Inc(AECOM) ifield rOePated to the and amendment dated April ope of work15 2019 to adtad to he field management d documentation is proposed to be ces increased an additional 19 days and includes project management during that time period. In 2018 the project was delayed, which resulted in the construction schedule being extended due to issues beyond the Contractor's control. The project delays included: delay of contract award, extended communications efforts with property owners associated with preconditions survey for property access, delay in receiving a notice to proceed to work in the easement area between Jackson Street and the wet basin, and inclement weather conditions experienced n 2016. The revised contract documents required the project to be substantially completed byAugust 1, 2019. The spring of 2019 was extremely wet. There was above normal precipitation from April through August 2019. Therefore, the Contractor could not make the revised substantial completion date. Substantial completion was extended by the City to August 19, 2019. This amendment is proposed to provide a budget increase to cover additional field documentation and project management costs that were incurred between the revised and the actual substantial project completion in 2019. Field Documentation AECOM completed an additional 19 days of full-time field documentation in 2019 than was budgeted for in Amendment No. 1. Approximately, 196.5 additional hours of field technician time, and additional equipment rental charges and project management costs were incurred in 2019. Field documentation work completed between August 1 and August 19, 2019 includes the following: • Jackson Street Side - Abandonment of existing storm sewer beneath west side of Jackson Street. - Sidewalk from Jackson Square Apartments to Bacon Avenue. - Final grading and restoration of easement area. - Sidewalk / Final Restoration. • Comet / Geneva Cul-de-Sacs - Installation of remaining storm sewer piping and outfalls/rip rap in the dry basin. • North Main Street / Libbey & Packer Avenues RFCtZ�EO n - Topsoil Placement / Final Restoration. NOv _ 6 ZQ17 • Wet Basin y OFFS - Landscaping Plantings / Final Restoration. ct::K f K'IProjects16n56541J Libbey-NicoletDBI1O6-Contractillo Client Co0bactIB056541J COn„prrAmenn'mentN0' q/AX (�Y L.UwN 114 A=SWM Dry Basin — Abandon existing 60" pipe on south side. — Remove bens and temporary rip -rap. — Installation of topsoil, seeding, and a -mat. — Erosion Control. Additional Proposed Budget AECOM has incurred $24,917.50, or 196.5 hours, of unbudgeted documentation services -related project cost. As with all our agreements, AECOM only bills for actual time incurred. We reserve the right to request changes in budgets if the scope of work varies from our project assumptions. This includes increases as well as decreases in our budget. The hourly fees will remain the same as the 2018 Approved Fee Schedule. The services provided will be performed in accordance with the approved Fee Schedule and conditions of the General Conditions of Service — City of Oshkosh, April 2009, which are expressly incorporated into, and are an integral part of, our agreement for professional services. If you have any questions or need to clarify a point, please call any of the undersigned at 920-236-6718. Yours sincerely, AECOM Technical Services, Inc. Paul . Timm Acco nt Manager encl: Amendment to Agreement Amendment Authorization evin L. Brehm, P.E. K Associate Vice President K:\Pmjects\60565413_Libbey-Niwlet DB\100-Contract\110 Client ContradW0565413—Contract Amendment No. Ida= 214 AECOM Amenoi 1ant to Agreement Amendment No. 2 City Contract 18-02 City of Oshkosh Purchase Order No. 180340-00 AECOM Project No. 60565413 RETURN TO: AECOM Date: October 15, 2019 558 North Main Street Oshkosh, WI 54901 Attention: Paul Timm Summary Original Contract Value $290,245.00 Total Previous Amendments $56,591.25 Amount this Amendment $24,917.50 Revised Contract Amount $371,753.76 Task# Description Amount 3 Additional Field Work and Project Management $24,917.50 TOTAL $24,917.50 558 N Main Street Oshkosh, WI 54901 920.236.6710 K\Projecls160565413 Libbey-Nicolet DB%100-Contract1110 Client Contract\60565413_Contmat Amendment No. 2.do= 314 e A=COM Authorization October 15, 2019 558 N Main Street Oshkosh, WI 54901 920.236.6710 I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work outlined in Amendment 2 to the agreement dated January 17, 2018, OPP-640353, and Amendment 1 dated April 15, 2019 related to Construction Monitoring and Documentation Related to City Contract 18-02 Libbey/Nicolet Watershed/North Main Street Area Detention Basin, Oshkosh, Wisconsin with a revised total budget authorization of $371,753.75 under the general terms and conditions specified in the proposal. Signiiture Mark A Rohloff Print Name City Manager Panization II nn jqu Cl�V y Y 1 Signature Pamela R. Ubrig; Print Name City Clerk Title/organization Sign J- \�JU Lynn A. Lorenson; Print Name City Attorney Title/Organization �y Signature Russ Van Gompel Print Name Director of Finance Title/Organization Date cb Date �bl lao� � Date to �.?v A! Date K:Vmjects%0565413_Ubbey-Nicolet DBY100-Contmctt110 Client Contract\60565413 Contract Amendment No. 2.dom 414