Loading...
HomeMy WebLinkAboutChange Orde No 1 PTS ContractorsTO: PTS CONTRACTORS, INC. 4075 EATON ROAD GREEN BAY, WI 54311 CHANGE ORDER #1 (FINAL) DATE: OCTOBER 21.2019 Your present contract with the City of Oshkosh, Contract No. 18-05, awarded February 27, 2016. is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($323,616.82) NET INCREASE TO ALTERNATE 3: $0.00 NET INCREASE TO SECTION I: $92,895.18 NET DECREASE TO CONTRACT ($230,721.64) SECTION I -TOTALS _ _ BID TOTAL $7,251,553.01 $7,251,553.01 CO #1 ($230,721.64) ($230,721.64) CONTRACT TOTAL $7,020,831.37 $7,020,831.37 CITY OF OSHKOSH BY: City Man ger City Clerk --� Approved and a epted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptrd1ler Approveo form: Cityon ey CONTRACT 18-05 CHANGE ORDER #1 (FINAL) 18-05 ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPRICE Removing pavement; Square 1100 complete asspecified Yards 18.700.00 18.981.90 281.90 $2.00 $563.80 Removing pavement on Oregon Street; Station 177+79 to Station 187+08; Linear 1101 complete asspecified Feet 1,250.00 1,352.90 102.90 $13.00 $1.337.70 Removing concrete and asphalt sidewalk and driveway; complete as Square 1120 specified Feet 54,400.00 59,209.80 4809.80 $0.40 $1,923.92 Unclassified excavation; Cubic 1200 complete asspecified Yards 3,370.00 3,657.30 287.30 $15.00 $4,309.50 Excavation special (paving); 1220 complete asspecified Tons 750.00 0.00 -750.00 $10.00 $7,500.00 concrete pavement HES; �T' with 5" CABC and grading; Square 1303 complete asspecified Yards 1,260.00 1,479.20 219.20 $54.50 $11,946.40 8" concrete pavement HES; with 6" CABC and grading; Square 1313 complete asspecified Yards 900.00 1,053.50 153.50 $48.00 $7,368.00 8" concrete pavement doweled; with 6" CABC and grading; complete as Square 1314A sped Yards 6,700.00 14,619.30 7919.30 $47.50 $376,166.75 concrete pavement 18" doweled; HES; with 6" CABC and grading; complete as Square 1315 specified Yards 8,880.00 775.50 -8,104.50 $50.00 $405,225.00 Concrete pavement gaps; 1334 complete asspecified Each 2.00 2.00 $1,000.00 Crushed aggregate base course; complete as �specified 1340 Tons 2,820.00 0.00 -2,820.00 $6.00 $16,920.00 Pavement ties; complete as 1350 specified Each 100.00 105.00 5.00 $8.00 $40.00 Drilled dowel bars; 1", 1352 complete asspecified Each 280.00 204.00 -76.00 $10.00 $760.00 Drilled dowel bars; 1 1/4"; 1354 complete asspecified Each 185.00 162.00 -23.00 $12.20 $280.60 Adjust manholes and inlets; 1360 complete asspecified Each 155.00 165.00 10.00 $280.00 $2,800.00 Turf restoration; complete as Square 1370 specified Yards 1,390.00 1,662.80 272.80 $10.00 $2,728.00 Restore gravel driveway/ Square 1372 apron; complete asspecified Yards 30.00 50.50 20.50 $10.00 $205.00 Cold weather covering (concrete pavement) - single visquine; complete as Square 1380 specified Yards 3,500.00 0.00 -3,500.00 $0.01 $35.00 Up -charge for late season cold weather concrete pavement; complete as Cubic 1390 specified Yards 200.00 0.00 -200.00 $10.00 $2,000.00 Standard Type "B" curb �18" with 6" CABC and grading; Linear 1400 complete as specified Feet 140.001 489.30 349.30 $26.50 $9,256.45 Page 1 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE 12" radius curb with 6" CABC and grading; complete as Linear 1410 specified Feet 840.00 847.50 7.50 $10.00 $75.00 30" curb and gutter; 8"; with 6" CABC and grading; Linear 1442 complete asspecified Feet 440.00 433.60 -6.40 $26.50 $169.60 Sidewalk curb; complete as Linear 1460 specified Feet 210.00 146.90 -63.10 $30.50 $1,924.55 4" concrete sidewalk with 3" CABC and grading; complete Square 1500 asspecified Feet 35,850.00 37,574.60 1724.60 $5.20 $8,967.92 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square 1510 specified Feet 7,000.00 12,740.10 5740.10 $5.60 $32,144.56 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete Square 1514 asspecified Feet 6,230.00 1,200.50 -5,029.50 $5.80 $29,171.10 6" concrete step; complete as Square 1530 Ispecified Feet 125.00 184.60 59.60 $50.00 $2,980.00 Curb ramp detectable warning field (naturaVnon- painted); complete as Square 1540 specified Feet 288.00 304.00 16.00 $28.50 $456.00 No. 4 reinforcing rods - deformed, epoxy -coated; Linear 1550 complete asspecified Feet 1 3,900.00 4,660.00 660.00 $1.50 $990.00 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated; 1560 complete asspecified Each 385.00 478.00 93.00 $4.00 $372.00 Cold weather covering (sidewalk) - single visquine; Square 1580 complete asspecified Feet 9,600.00 0.00 -9,600.00 $0.01 $96.00 Up -charge for late season cold weather concrete pavement; complete as Cubic 1590 specified Yards 200.00 0.00 -200.00 $10.00 $2,000.00 Locate existing property monuments; complete as 1650 specified Each 25.00 43.00 18.00 $150.00 $2,700.00 Replace section corner; 1651 complete asspecified Each 2.00 1.00 -1.00 $400.00 $400.00 Replace existing property monuments; complete as 1652 specified Each 20.00 36.00 16.00 1 $60.00 $960.00 Sawing existing pavement; Linear 1700 complete asspecified Feet 1,790.00 1,659.00 -131.00 $2.00 $262.00 Sawing concrete pavement full depth; complete as Linear 1710 Ispecified Feet 1 750.00 1,009.00 259.00 $3.00 $777.00 Tack coat; complete as 1900 specified Gallons 80.00 0.00 -80.00 $5.50 $520.00 5" asphaltic transition MT with 10" CABC and grading; Square 1910 complete asspecified Yards 390.00 181.80 -208.20 $45.00 $9,369.00 4" asphaltic transition LT with 10" CABC and grading; Square 1911 complete asspecified Yards 740.00 1,168.30 428.30 $39.00 $16,703.70 Page 2 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE /N CONTRACSEIN TPRICE 4" asphaltic surface LT with 6" CABC and grading; Square 1916 complete asspecified Feel 660.00 743.30 83.30 $37.00 $3.082.10 asphaltic surface LT with �2" 6" CABC and grading; Square 1917 complete asspecified Yards 250.00 57.30 -192.70 $21.00 $4,046.70 Asphaltic cold weather Square 1918 Paving; complete asspecified Yards 400.00 0.00 -400.00 $21.00 $8,400.00 Oregon Street; Station 177+79 to Station 187+08; Linear 1919 complete asspecified Feet 1,250.00 1,352.90 102.90 $70.00 $7,203.00 Pavement marking epoxy; 8" Linear 1974 white); complete asspecified Feet 475.00 620.70 145.70 $1.001 $145.70 Pavement marking epoxy; 4" Linear 1975 white); complete asspecified Feet 2,650.001 2,739.70 89.70 $0.50 $44.85 Pavement markings epoxy; 4" (yellow); complete as Linear 1976 specified Feet 4,705.00 5,194.40 489.40 $0.50 $244.70 Pavement markings parking stall epoxy; 4" (white); Linear 1977 complete asspecified Feet 170.00 254.00 84.00 $5.251 $441.00 Pavement markings epoxy; 12" (white); complete as Linear 1978 specified Feet 2,680.001 2,025.20 -654.80 $8.50 $5,565.80 Pavement markings stop line epoxy; 18" (white); complete Linear 1979 asspecified Feet 210.00 203.90 -6.10 $11.00 $67.10 Pavement markings arrow epoxy; Type 2 (white); 1980 complete asspecified Each 8.00 8.00 1 $250.00 Pavement markings arrow epoxy; Type 3 (white); 1981 complete asspecified Each 8.001 8.00 $250.00 Furnish and install 10" storm Linear 2002 sewer; complete asspecified Feet 510.00 145.00 -365.00 $60.00 $21,900.00 Furnish and install 12" storm Linear 2003 sewer; complete asspecified Feet 1,265.00 1,271.20 6.20 $72.00 $446.40 Furnish and install 15" storm Linear 2006 sewer; complete as specified Feet 335.00 346.60 11.60 1 $74.001 $858.40 Furnish and install 18" storm Linear 2009 sewer; complete asspecified Feet 655.00 622.20 -32.80 $75.00 $2,460.00 Furnish and install 21" storm Linear 2012 sewer; complete asspecified Feel 410.00 416.80 6.80 $98.00 $666.40 Furnish and install 24" storm Linear 2015 sewer; complete asspecified Feet 430.00 417.30 -12.70 $74.00 $939.80 Furnish and install 27" storm Linear 2018 sewer; complete as specified Feet 100.00 76.60 -23.40 $104.00 $2,433.60 Furnish and install 30" storm Linear 2021 sewer; complete ass specified Feet 740.00 739.20 -0.80 $97.00 $77.60 Furnish and install 36" storm Linear 2024 sewer; complete as specified Feet 250.00 232.60 -17.40 $150. 00 $2,610.00 Page 3 of 14 CONTRACT 18-05 CHANGE ORDER 01 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACTPR/CE Furnish and install 42" storm Linear 2027 sewer; complete asspecified Feet 285.00 287.50 2.50 $150.00 $375.00 Furnish and install 48' storm Linear 2030 sewer; complete asspecified Feet 860.00 829.90 -30.10 $172.00 $5,177.20 Furnish and install 54" storm Linear 2033 sewer; complete asspecified Feet 25.001 22.00 1 -3.00 $500.00 $1,500.00 Furnish and install standard storm sewer manhole (4' diameter); complete as Vertical 2201 specified Feet 110.35 115.03 4.68 $350.00 $1,638.00 Furnish and install standard storm sewer manhole (5' diameter); complete as Vertical 2202 specified Feet 29.75 16.59 -13.16 $530.00 $6,974.80 Furnish and install standard storm sewer manhole (6' diameter); complete as Vertical 2203 specified Feet 44.65 60.95 16.30 1 $690.00 $11,247.00 Furnish and install standard storm sewer manhole (7" diameter); complete as Vertical 2204 specified Feet 79.25 66.50 -12.75 $800.00 $10,200.00 Furnish and install standard storm sewer manhole (8' x 8' Vertical 2211 box); complete asspecified Feet 19.35 19.38 0.03 $1,200.001 $36.00 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as Vertical 2213 specified Feet 12.15 13.74 1.59 $400.00 $636,00 Furnish and install Type 1 2236 inlet; complete asspecified Each 1.00 1.00 $2,700.00 Furnish and install Type 3 inlet (with 18" sump); 2237 complete asspecified Each 60.00 57.00 -3.00 $2,000.00 $6,000.00 Furnish and install 6" storm sewer lateral; complete as Linear 2400 specified Feet 740.00 1,667.50 927.50 $68.00 $63,070.00 Furnish and install 8" storm sewer lateral; complete as Linear 2402 specified Feet 1,095.00 125.00 1 -970.00 $74.00 $71,780.00 Furnish and install storm sewer marker balls; complete 2404 asspecified Each 128.00 123.00 -5.00 $36.00 $180.00 Furnish and install storm sewer clay dams; complete 2406 asspecified Each 64.00 59.00 -5.00 $130.00 $650.00 Furnish and install storm sewer lateral inlet; complete 2408 asspecified Each 21.001 17.00 1 -4.00 $525.00 $2,100.00 Storm lateral inlet adjustments; complete as 2414 specified Each 21.00 0.00 -21.00 $190.00 $3 990.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2508 specified Each 150.00 102.00 -48.00 $75.00 $3,600.00 Page 4 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPRICE Sediment removal -Type D modified inlet protection; 2510 complete asspecified Each 150.00 17.00 -133.00 $5.00 $665.00 Furnish; install; maintain; and remove stone tracking pad; 2512 complete asspecified Each 1.00 0.00 -1.00 $2.000.00 $2,000.00 Furnish; install; maintain; and remove stone bag; complete 2516 asspecified Each 10.00 34.00 24.00 $10.00 $240.00 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as Linear 2518 specified Feet 50.00 0.00 -50.00 $10.00 $500.00 Furnish; install; maintain; and remove ditch check; 2522 complete asspecified Each 5.00 0.00 -5.00 $10.00 $50.00 Furnish; install; maintain; and remove dewatering tank system; complete as 2524 specified Each 3.00 2.00 -1.00 $1,000.00 $1,000.00 Rock excavation; complete Cubic 2750 as specified Yards 150.00 0.00 -150.00 $0.01 $1.50 Abandon 8" - 12" storm Linear 2800 sewer; com late ass ecified Feet 275.00 260.00 -15.00 $12.00 $180.00 Abandon 15' and larger storm sewer; complete as Linear 2802 specified Feet 745.00 732.00 -13.00 $20.00 $260.00 Remove 30" and smaller storm sewer; complete as Linear 2804 specified Feet 860.00 850.00 -10.00 $26.00 $260.00 Remove 33" - 60" storm Linear 2806 sewer; complete asspecified Feet 1 80.00 75.00 -5.00 $40.00 $200.00 Abandon storm sewer manholes and inlets; 2810 complete as specified Each 11.00 9.00 -2.00 $650.00 $1,300.00 Remove storm sewer manholes and inlets; 2812 complete asspecified Each 23.00 22.00 -1.00 $640.00 $640.00 Connect to existing storm sewer main; complete as 2850 specified Each 22.00 23.00 1.00 $1,000.00 $1,000.00 Connect to existing storm sewer lateral; complete as 2852 specified Each 3.00 5.00 2.00 $320.00 $640.00 Connect to existing storm sewer manhole; complete as 2856 specified Each 4.00 4.00 $1,275.00 Storm sewer utility line opening (ULO); complete as 2914 specified Each 5.001 3.00 -2.00 $950.00 $1,900.00 Excavation special (storm); 2950 complete asspecified I Tons 500.00 0.00 -500.00 $16.00 $8,000.00 Furnish and install 5" drain Linear 2951 tile; complete asspecified Feet 25.00 0.00 -25.00 $50.00 $1,250.00 Bentonite slurry dam (storm); 2952 com late asspecified Each 4.00 0.00 .4.00 $950.00 $3,800.00 Page 5 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE Furnish and install 8" sanitary sewer (relay); complete as Linear 3000 specified Feet 535.00 507.90 -27.10 $116.00 $3,143.60 Furnish and install 10" sanitary sewer (relay); Linear 3002 complete asspecified Feet 144.00 149.30 5.30 $140.00 $742.00 Furnish and install 12" sanitary sewer (relay); Linear 3004 complete asspecified Feet 15.00 31.00 16.00 $205.00 $3,280.00 Furnish and install 30" sanitary sewer (relay); Linear 3014 complete asspecified Feet 10.00 9.00 -1.00 $260.00 $250.00 Furnish and install 54" sanitary sewer (relay); Linear 3022 Icomplete asspecified Feet 12.00 8.001 4.00 $380.00 $1,520.00 Furnish and install 42" sanitary sewer (new); Linear 3048 complete ass ecified Feet 790.00 765.77 -24.23 $685.00 $16,597.55 Furnish and install 60" sanitary sewer (new); Linear 3054 complete asspecified Feet 2,055.00 2,004.76 -60.24 $756.00 $45,541.44 Furnish and install 8" sanitary sewer drop; complete as Vertical 3060 specified Feet 20.00 14.95 -5.05 $425.00 $2,146.25 Furnish and install 12" sanitary sewer drop; Vertical 3064 complete asspecified Feet 5.00 3.28 -1.72 $505.00 $868.60 Furnish and install standard sanitary sewer manhole (4' diameter); complete as Vertical 3100 specified Feet 109.00 101.80 -7.20 $415.00 $2,988.00 Furnish and install standard sanitary sewer manhole (5' diameter); complete as Vertical 3102 specified Feet 19.001 17.09 -1.91 $700.00 $1,337.00 Furnish and install standard sanitary sewer manhole (6' diameter); complete as Vertical 3104 specified Feet 35.00 33.93 -1.07 $800.00 $856.00 Furnish and install sanitary junction chamber 0-1; 3113F complete ass ecified Each 1.00 1.00 $247,000.00 Furnish and install external sanitary sewer manhole chimney seal; complete as 3114 specified Each 28.00 27.00 .1.00 $530.00 $530.00 Furnish and install external sanitary sewer manhole chimney seal extension; com lete ass ecifed Each 2.00 0.00 -2.00 $420.00 $840.00Furnish E3118 and install internal sanitary sewer manhole chimney seal; complete as specified Each 2.00 0.00 -2.00 $390.00 $780.00 Furnish and install internal sanitary sewer manhole chimney seal extension; 3120 1 complete asspecified Each 2.001 0.00 1 -2.00 $355.00 $710.00 Page 6 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT INCREASE IN DECREASE NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as 3210 specified Each 20.00 6.00 -14.00 $325.00 $4,550.00 Furnish and install 10" x 6" sanitary sewer factory wyes or tees; complete as 3212 specified Each 4.00 4.00 $375.00 Furnish and install 8" x 8" sanitary sewer factory wyes or tees; complete as 3219 Specified Each 3.00 3.00 $310.00 Furnish and install 6" sanitary sewer laterals (new); Linear 3232 complete asspecified Feet 140.00 106.00 -34.00 $115.00 $3,910.00 Furnish and install 6" sanitary sewer riser (new); complete Linear 3233 asspecified Feet 5.00 0.00 -5.00 $189.00 $945.00 Furnish and install 4"16" sanitary sewer lateral (relay); Linear 3234 complete asspecified Feet 1,196.00 1,460.001 264.00 $110.00 $29,040.00 Furnish and install 4"/6" sanitary sewer riser (relay); Linear 3235 complete asspecified Feet 16.00 6.00 -10.00 $190.00 $1,900.00 Furnish and install sanitary sewer lateral marker balls; 3236 complete asspecified Each 106.00 138.00 32.00 $40.00 $1,280.00 Furnish and install clay 1 3238 dams; complete asspecified Each 68.00 71.00 3.00 $128.00 $384.00 Furnish and install sanitary lateral extension (relay); Linear 3243 complete asspecified Feet 65.00 5.50 -59.50 $80.00 $4,760.00 Furnish and install connection to existing 8" 3300 mains; complete asspecified Each 12.00 6.00 -6.00 $985.00 $5,910.00 Furnish and install connection to existing 10" 3302 mains; complete asspecified Each 7.001 5.00 -2.00 $1,000.00 $2,000.00 Furnish and install connection to existing 12" 3304 mains; complete asspecified Each 2.00 2.00 $985.00 Furnish and install connection to existing 30" sanitary sewer mains; 3314 complete asspecified Each 2.00 2.00 $5,200.00 Furnish and install connection to existing 54" sanitary sewer mains; 3322 Complete asspecified Each 1.001 1.00 $12,000.00 Furnish and install connection to existing 60" sanitary sewer mains; 3324 complete as specified Each 1.00 1.00 $18'000.00 Furnish and install sanitary sewer concrete collars; 3330 complete asspecified Each 1 1.00 0.00 -1.00 $2,400.00 $2,400.00 Page 7 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPRICE Furnish and install 10" sanitary sewer open cut casing pipes; complete as Linear 3404 specified Feet 36.00 50.00 14.00 $165.00 $2,310.00 Rock excavation; complete Linear 3601 asspecified Feet 3,380.00 2,770.53 -609.47 $0.01 $6.09 Crack and damage survey; 3650 Icomplete asspecified Each 118.00 82.00 1 -36.00 $525.00 $18,900.00 Closed circuit televising; Linear 3700 complete asspecified Feet 3,571.00 3,481.00 -90.00 $2.50 $225.00 Closed circuit televising - using push camera; complete 3710 asspecified Each 10.00 3.00 -7.00 $300.00 $2,100.00 Abandon sanitary sewer manholes; complete as 3800 specified Each 1.00 1.00 $1,200.00 Abandon 8" sanitary sewer; Linear 3802 complete asspecified Feet 18.001 18.00 1 $12.00 Abandon 10" sanitary sewer; Linear 3804 complete asspecified Feet 157.00 157.00 $26.00 Abandon 30" sanitary sewer; Linear 3818 complete as specified Feet 18.00 18.00 $50.00 Remove sanitary sewer manholes; complete as 3852 specified Each 1.00 1.00 $950.00 Remove existing sanitary Lump 3853 vault; complete asspecified Sum 1.00 1.00 $15,000.00 Remove sanitary sewer; Linear 3854 complete asspecified Feet 131.00 125.00 -6.00 $64.00 $384.00 Sanitary sewer utility line opening (ULO); complete as 3890 specified Each 10.00 3.00 -7.00 $1,200.00 $8,400.00 Excavation special (sanitary); 3892 complete asspecified Tons 500.00 0.00 -500.00 $16.00 $8,000.00 Bentonite slurry dam (sanitary); complete as 3894 specified Each 1 4.00 0.00 -4.00 $610.00 $2,440.00 Furnish and install 4" ductile iron water main (relay) with polywrap; complete as Linear 4000 specified Feet 82.00 79.00 -3.00 $130.00 $390.00 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as Linear 4002 specified Feet 413.001 398.00 -15.00 $128.00 $1,920.00 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as Linear 4004 specified Feet 3,591.00 3,263.10 -327.90 $116.00 $38,036.40 Furnish and install 12" ductile iron water main (relay) with polywrap; complete as Linear 4008 specified Feet 143.00 310.50 167.50 1 $148.00 $24,790.00 Furnish and install 1" water service (relay); complete as Linear 4036 specified Feet 2,478.00 2,302.10 -175.90 $90.00 $15,831.00 Furnish and install 1-1/4" water service (relay); Linear 4037 complete asspecified Feet 30.00 0.00 -30.00 $90.00 $2,700.00 Page 8 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACTPRICE Furnish and install 1-1/2" water service (relay); Linear 4038 complete asspecified Feet 45.00 49.50 4.50 $115.00 $517.50 Furnish and install 2" water service (new); complete as Linear 4046 specified Feet 73.00 0.00 -73.00 $150.00 $10,950.00 Furnish and install 1" corporation and stop box; 4048 Complete asspecified Each 80.00 76.00 1 -4.00 $250.00 $1,000.00 Furnish and install 1-1/4" corporation and stop box; 4050 complete ass specified Each 1.00 0.00 -1.00 $580.00 $580.00 Furnish and install 1-1/2" corporation and stop box; 4051 complete ass specified Each 2.00 2.00 $860.00 Furnish and install 2" corporation and stop box; 4053 complete as s ecified Each 2.001 0.00 -2.00 $1,140.00 $2,280.00 Furnish and install water service clay dams; complete 4055 asspecified Each 82.00 76.00 -6.00 $130.00 $780.00 Furnish and install connections to existing 4" water main; complete as 4056 specified Each 3.00 4.00 1.00 $1,700.00 $1,700.00 Furnish and install connections to existing 6" water main; complete as 4058 specified Each 10.00 11.00 1.00 $1,700.001 $1.700.00 Furnish and install connections to existing 8" water main; complete as 4060 specified Each 16.00 7.00 -9.00 $2,200.00 $19,800.00 Furnish and install connections to existing 12" water main; complete as 4064 specified Each 2.001 2.00 $3,000.00 Temporary water main; Lump 4080 complete asspecified Sum 1.00 0.00 -1.00 $0.01 $0.01 Furnish and install 6" x 6" water main tee; complete as 4101 specified Each 1.00 2.00 1.00 $360.00 $360.00 Furnish and install 8" x 6" water main tee; complete as 4110 specified Each 6.00 8.00 2.00 $430.00 $860.00 Furnish and install 6" x 8" water main cross; complete 4182 asspecified Each 1.00 0.00 -1.00 $700.00 $700.00 Furnish and install 8" x 8" water main cross; complete 4189 asspecified Each 7.00 6.00 -1.00 $700.00 $700.00 Furnish and install 8" x 12" water main cross; complete 4194 asspecified Each 1.00 0.00 -1.00 $1,020.00 $1,020.00 Furnish and install 4" 22 1/2 degree water main bend; 4226 complete asspecified Each 5.00 0.00 -5.00 $170.00 $850.00 Furnish and install 6" 22 1/2 degree water main bend; 4227 complete as specified Each 4.001 3.00 -1.00 $200.00 $200.00 Page 9 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET UNIT INCREASEIN CONTRACT DECREASE/N DECREASE PRICE PRICE CONTRACTPRICE Furnish and install 4" 45 degree water main bend; 4235 com left as s ecified Each 10.00 7.00 -3.00 $155.00 $465.00 Furnish and install 6" 45 degree water main bend; 4236 complete asspecified Each 45.00 30.00 -15.00 $205.00 $3 075.00 Furnish and install 8" 45 degree water main bend; 4237 Complete asspecified Each 32.0 221.00 -11.00 $280.00 $3,080.00 Furnish and install 12" 45 degree water main bend; 4239 complete ass ecified Each 2.00 4.00 2.00 $600.00 $1.200.00 Furnish and install 8" x 4" water main reducer; complete 4263 asspecified Each 3.00 3.00 $210.00 Furnish and install 8" x 6" water main reducer; complete 4264 as specified Each 10.00 9.00 -1.00 $225.00 $225.00 Cut and cap existing 6" water 4352 main; complete asspecified Each 1.00 0.00 -1.00 $205.00 $205.00 Cut and cap existing 8" water 4354 main; complete asspecified Each 1.00 1.00 $305.00 Cut and cap existing 12" water main; complete as 4358 specified Each 1.00 0.00 -1.00 1 $540.00 $540.00 Furnish and install 6" water main gate valve; complete as 1 4401 specified Each 11.00 10.00 -1.00 $1,140.00 $1,140.00 Furnish and install 8" water main gate valve; complete as 4402 specified Each 42.00 31.00 -11.00 $1,600.00 $17,600.00 Furnish and install 12" water main gate valve; complete as 4404 specified Each 2.00 0.00 -2.00 $2.725.00 $5,450.00 Furnish and install hydrant; 4600 complete asspecified Each 7.00 7.00 $3,800.00 Furnish and install 2" water main casing pipe; complete Linear 4712 ass ecifed Feet 70.00 0.00 -70.00 $58.00 $4,060.00 Furnish and install 4" water main casing pipe; complete Linear 4714 asspecified Feet 20.001 70.00 50.00 $64.00 $3,200.00 Furnish and install 18" water main casing pipe; complete Linear 4726 asspecified Feet 65.00 67.50 2.50 $70.001 $175.00 Furnish and install 20" water main casing pipe; complete Linear 4728 ass ecified Feet 15.00 0.00 -15.00 $100.00 $1,500.00 Rock excavation; complete Linear 4801 asspecified Feet 320.00 591.50 271.50 $0.01 $2.72 Abandon water main on Oregon Street; complete as Lump 4900 specified Sum 1.00 0.00 -1.00 $3,000.00 $3,000.00 Remove water main; Linear 4920 complete asspecified Feet 670.00 500.00 -170.00 $32.00 $5,440.00 Water main utility line opening (ULO); complete as 4950 specified Each 4.00 2.00 -2.00 $640.00 $1,280.00 Page 10 of 14 CONTRACT 18-05 CHANGE ORDER 41 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACTPRICE Excavation special (water); 4990 complete asspecified Tons 500.00 0.00 -500.00 $16.00 $8,000.00 Bentonite slurry dam (water); 4992 com lete asspecified Each 4.00 0.00 -4.00 $550.00 $2,200.00 Furnish and install pull box (steel); 18" x 36"; complete 5012 asspecified Each 31.00 31.00 1 $600.00 Furnish and install pull box (steel); 24" x 42 ; complete 5018 ass ecified Each 31.00 32.00 1.00 $650.00 $650.00 Adjust pull box; complete as 5025 specified Each 62.00 0.00 -62.00 $125.00 $7,750.00 Remove pull box; complete 5026 ecified Is Each 11.00 10.00 -1.00 $100.00 $100.00 Remove concrete base; 5027 complete asspecified Each 42.00 42.00 $100.00 Furnish and install control cabinet; complete as 5050 s ecified Each 4.00 4.00 $1,200.00 Install electrical service; 5054 complete asspecified Each 3.00 2.00 -1.00 $1,200.00 $1,200.00 Furnish and install 2" Schedule 40 PVC; complete Linear 5120 asspecified Feet 2.800.00 2,800.00 $5.00 Furnish and install 2" Schedule 80 PVC; complete Linear 5122 ass ecified Feet 630.00 650.00 20.00 $6.00 $120.00 Furnish and install 3" Schedule 40 PVC; complete Linear 5130 asspecified Feet 5,970.00 5,970.00 $6.00 Furnish and install 3" Schedule 80 PVC; complete Linear 5132 asspecified Feet 1,800.00 1.958.00 158.00 $7.00 $1.106.00 Connect to existing conduit; 5184 complete ass ecified Each 3.00 3.00 $125.00 Furnish and install 4 gauge red -coated wire; complete as Linear 5230 specified Feet 6,320.00 7,584.00 1264.00 $1.20 $1.516.80 Furnish and install 4 gauge black -coated wire; complete Linear 5231 ass ecified Feet 6,320.00 7,584.00 1264.00 $1.20 $1,516.80 Furnish and install 8 gauge green -coated wire; complete Linear 5252 asspecified Feet 6.090.00 6,763,00 673.00 $1.00 $673.00 Furnish and install 10 gauge red -coaled wire; complete as Linear 5260 s ecified Feet 350.00 461.00 111.00 $1.00 $111.00 Furnish and install 10 gauge black -coated wire; complete Linear 5261 asspecified Feet 350.00 461.00 111.00 $1.00 $111.00 Furnish and install 10 gauge green -coated wire; complete Linear 5262 asspecified I Feet 850.00 1,100.00 250.00 $1.00 $250.00 Furnish and install 12 gauge red -coated wire; complete as Linear 5270 specified Feet 800.00 800.001 $1.00 Page 11 of 14 CONTRACT 18-05 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE /N DECREASE/NPRICE QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACTPR/CE Furnish and install 12 gauge black -coated wire; complete Linear 5271 asspecified Feet 800.00 800.00 $1.00 Furnish and install 12 gauge green -coated wire; complete Linear 5272 asspecified Feet 800.00 800.00 $1.00 Furnish and install 14 gauge green -coated wire; complete Linear 5282 asspecified Feet 3,850.00 3,850.00 $0.75 Furnish and install 14 gauge stranded single pair twisted with shield; complete as Linear 5356 specified Feet 1,300.00 1,526.00 226.00 $1.50 $339.00 Furnish and install 14 AWG solid 21 conductor; complete Linear 5372 asspecified Feet 2,040.00 2.100.00 60.00 $3.50 $210.00 Furnish and install fuse 5380 holder; complete asspecified Each 80.00 64.00 -16.00 $50.00 $800.00 Furnish and install 5A fuse; 5392 complete asspecified Each 80.00 64.00 -16.00 $5.00 $80.00 Install light pole and pole top lights; "City Supplied"; 5410 complete asspecified Each 1 37.00 36.00 -1.00 $500.00 $500.00 Install 1 O' traffic signal pole; "City Supplied"; complete as 5420 specified Each 2.00 0.00 -2.00 $200.00 $400.00 Install 15' traffic signal pole; "City Supplied", complete as 5422 specified Each 5.00 8.00 3.00 $200.00 $600.00 Install 20'traffic signal pole; "City Supplied" complete as 5424 specified Each 11.00 10.00 -1.00 $350.00 $350.00 Install 30' traffic signal pole; "City Supplied", complete as 5426 specified Each 3.00 2.00 -1.00 $425.00 $425.00 Install 25' trombone arm; "City Supplied", complete as 5430 specified Each 13.00 12.00 -1.00 $325.00 $325.00 Install traffic camera; "City Supplied"; complete as 5432 specified Each 3.00 0.00 -3.00 $2,000.00 $6,000.00 Install five -head traffic signal; "City Supplied"; complete as 5434 specified Each 17.00 16.00 -1.00 $225.00 $225.00 Install three -head traffic signal; "City Supplied"; 5436 complete asspecified Each 9.00 8.00 -1.00 $140.00($140.0011 Install pedestrian signal; "City Supplied"; complete as 5436 specified Each 17.00 16.00 -1.00 $150.00 $150.00 Install pedestrian push button; "City Supplied"; 5440 complete ass specified Eachr18.00 16.00 -2.00 $125.00 $250.00Furnish and install Type 25502 Base; complete as specified Each21.00 20.00 -1.00 $775.00 $775.00 Page 12 of 14 CONTRACT 18-05 CHANGE ORDER 41 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACTPR/CE PRICE Furnish and install Type 5 5504 Base; complete asspecified Each 34.00 32.00 -2.00 $725.00 $1,450.00 Furnish and install Type 9 5506 Base; complete asspecified Each 4.00 4.00 $5,000.00 SECTION I (BID ITEMS 1100 - 5506) - SUBTOTAL: NET DECREASE TO SECTION I: ALTERNATE 3 $666,631.07 ($980,147.89) ($323,616.82) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET NET UNIT CONTRACT DECREASEIN INCREASE DECREASE PRICE CONTRACSEIN TPRICE Furnish and install sanitary PRJrF junction chamber 0-6; Linear 3113A-3 complete ass ecified Feet 1.00 1.00 $56,000.00 Furnish and install sanitary junction chamber 0.8; Linear 31138-3 complete asspecified Feet 1.00 1.00 $38.000.00 Furnish and install sanitary junction chamber 0-5; Linear 3113C-3 complete asspecified Feet 1.00 1.00 $33,000.00 Furnish and install sanitary junction chamber 0-4; 311313-3 complete asspecified Each 1.00 1.00 S42,000.On Furnish and install sanitary junction chamber 0-3; 3113E-3 complete asspecified Each 1.00 1.00 $34,000.00 ALTERNATE 3 (BID ITEMS 3113A-3 - 3113E-3) - SUBTOTAL: NET INCREASE TO ALTERNATE 3: ADDITIONAL WORK REQUIRED: CO #1 $0.00 $0.00 $0.00 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE Mum CONTRACT DECREASEIN CONTRACTPR/CE Furnish and install 8" x 6" sanitary sewer factory wyes or tees for additional deteriorated main section; 1-3210 complete asspecified Each 0.00 21.00 21.00 $100.00 $2.100.00 Time and materials 4/10 to remove old tunnel through Oregon Street right of way; Lump 1-10000 complete asspecified Sum 0.00 1.00 1.00 $8.774.20 $8,774.20 Time and materials 4/10 extra work associated with installing the storm sewer at the bridge; complete as Lump 1-20000 specified Sum 0.00 1.00 1.00 $6,600.00 $6,600.00 Time and materials 6/15 extra work to lower inlet lead due to private utility conflict; Lump 1-20001 comp] IS asspecified Sum 0.00 1.00 1.00 $1,850.00 $1,850.00 Remove concrete and fix storm lateral at Hobby Town; 1-20002 complete as specified Each 0.00 0.50 0.50 $10,219.95 $5.109.98 Extra time and materal to furnish casing pipe; complete Lump 1 1-20003 asspecified. I Sum 0.00 1.00 1.00 $8,295.00 $8,295.00 Page 13 of 14 CONTRACT 18-05 CHANGE ORDER 01 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASET DECRE4SEIN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Furnish and install 8" sanitary sewer (relay) additional deteriorated main section; Linear 1-30000 complete asspecified Feet 0.00 666.50 666.50 $79.00 $52,653.50 Remove concrete and fix storm lateral at Hobby Town; Lump 1-30001 complete as specified Sum 0.00 28.50 28.50 $125.00 $3,562.50 extra work to install 8" sleeve on an old service that was not in use; complete as Lump 1=40000 specified Sum 0.00 1.00 1.00 $860.00 $850.00 extra work to fix a leaking water service AT 1012 Oregon; complete as Lump 140001 specified Sum 0.00 1.00 1.00 $825.00 $825.00 Field Office; complete as Lump 1-50000 specified Sum 0.00 1.00 1.00 $2,275.00 $2,275.00 ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 1.3210-1-50000) - SUBTOTAL: $92,895.18 $0.00 NET INCREASE : $92,895.18 NET DECREASE TO SECTION I: NET INCREASE TO ALTERNATE 3: NET INCREASE TO SECTION I: NET DECREASE TO CONTRACT: ($323,616.82) $0.00 $92,896.18 Page 14 of 14