HomeMy WebLinkAboutChange Order No 1 RC ExcavatingTO: RC EXCAVATING INC. 3125 BIRCH ROAD, SUITE D SUAMICO, WI 54173 CHANGE ORDER #1 (REVISED FINAL) DATE: OCTOBER 7, 2019 Your present contract with the City of Oshkosh, Contract No. 18-02, awarded May 22, 2018, is hereby amended and changed as follows: NET DECREASE TO SECTION: ($250,516.70) NET INCREASE TO SECTION: $61,879.16 NET DECREASE TO CONTRACT ($188,637.64) SECTION I TOTALS BID TOTAL $4,798,337.95 $4,798,337.95 CO #1 ($188,637.54) ($188,637.54) CONTRACT TOTAL $4,609,700.41 $4,609,700.41 CITY OF OSHKOSH BY: (— city MManrag� City Clerk Approved and accepted: �.0 EXGWR-TflyGi�i✓L Con ctor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh Wisconsin, under the within Change Order. 4� �v^ Comptroll r Approved A"If... fatuitilllliia ui CONTRACT 18.02 CHANGE ORDER #1 (REVISED FINAL) 18-02 ITEM NUM R DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN Removing pavement; Square UR TIry QUANTITIES INCREASE DECREASE PRICE CONTRACTERICE CONTRACTPRICE 1100 com fete as specified Yards 7,084.00 6,861.30 -222.70 $5.00 $1,113.50) Removing concrete and asphalt sidewalk and driveway; complete as Square 1120 specified Feet 5,368.00 4,590.41 -777.59 $0.60 $$66.54 Removing existing silt and safety fencing; Linear 1190 complete asspecified 1,060.00 1,054.70 -5.30 $1.30 ($6,89 Removing and salvaging existing chain -link fencing and gate; complete as 1191 specified FFeet 1,930-00 1,930.00 $2.05 8" concrete pavement; with 6" CABC and grading; complete as 1311 specified 4,380.00 4,776.10 396.10 $52.00 $20.597.20 Pavement ties; complete 1350 as specified Each 150.00 214.00 64.00 $8.10 $518.40 Drilled dowel bars; 1 1/4-, 1354 cam lete as specified Each 270.00 130.00 -140.00 $14.25 $1,995.00 Adjust manholes and inlets; complete as 1360 specified Each 63.00 57.00 -6.00 $305.00 $1,830.00) Turf restoration; complete Square 1370 as specified Yards 1.575.00 1,800.06 225.06 $9.00 $2,025.54 30" curb and gutter; 8"; with 6" CABC and grading; complete as Linear 1442 specified Feet 1,080.00 377.50 -702.50 1 $28.00 $19,670.00) 36" mountable curb and gutter; 8"; with 6" CABC and grading; complete as Linear 1450 specified Feet 77.00 199.00 122.00 $40.50 $4.941.00 4" concrete sidewalk with 3" CABC and grading; Square 1500 complete asspecified Feet 1,840.00 2,599.08 759.08 $6.05 $4,592.43 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; Square 1510 complete as specified Feet 4.840.00 3.977.99 1 -862.01 $7.35 $6,335.77) Curb ramp detectable warning field (naturaVnon- painted); complete as Square 1540 specified Feet 48.00 48.00 $35.00 No. 4 reinforcing rods - deformed; epoxy -coated; Linear 1550 complete ass specified Feet 75.00 0.00 -75.00 $1.25 $93.75 Drilled No. 4 sidewalk tie bars - deformed; epoxy - coated; complete as 1560 specified Each 31.00 36.00 5.00 $5.05 $25.25 Locate existing property monuments; complete as 1650 specified Each 5.00 0.00 -5.00 $250.00 $1,250.00 Locate existing survey monuments; complete as E1652specified specified Each 1.00 0.00 -1.00 $250.00 $250.00) Replace existing property monuments; complete as Each 1 5.001 0.00 -5.00 1 $250.00 $1,250.00 Page 1 of CONTRACT 18.02 CHANGE ORDER #1 (REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER ANTIQUANTITIES INCREASE DECREASE PRICE CONTRACIP&CE CONTRACTPRI E Replace existing survey monuments; complete as 1653 specified Each 1.00 0.00 -1.00 $250.00 $250.00 Sawing existing pavement; complete as Linear 1700 specified Feet 280.00 337.60 57.60 $2.00 $115.20 Sawing Concrete pavement full depth; Linear - - 1710 complete as specified Feet 1,120.00 1,597.35 477.35 $2.00 $954.70 Tack coat; complete as 1900 specified Gallons 141.00 125.00 -16.00 $4.05 $64.80 4" asphaltic pavement LT With 10" CABC and grading; Complete as Square 1906 specified Yards 396.00 419.00 23.00 $48.50 $1,115.50 5" asphaltic transition MT with 10" CABC and - grading; complete as Square 1910 specified Yards 44.00 0.00 1 -44.00 $70.00 1 ($3,080.00 Furnish and install Jackson Street pavement; Square 1920 complete as specified Yards 1,498.00 1,574.50 76.50 $80.00 $6,120.00 Furnish and install 8" storm sewer; complete as Linear 2001 specified Feet 378.00 355.50 -22.50 $68.50 $1,541.25 Furnish and install 12" storm sewer; complete as Linear 2003 specified Feet 446.00 360.60 -85.40 $76.00 $6,490AD Furnish and install 21" storm sewer; complete as Linear 2012 specified Feet 5.00 0.00 -5.00 $114.00 $570.00 Furnish and install 24" storm sewer; complete as Linear 2015 specified Feet 260.001 213.90 -46.10 $107,00 $4,932.70 Furnish and install 27" storm sewer, complete as Linear 2018 specified Feet 60.00 71.801 11.80 $127.00 $1,498.60 Furnish and install 30" storm sewer; complete as Linear 2021 specified Feet 260.00 247.00 1 •13.00 $137.00 $1,781.00 Furnish and install 36" storm sewer; complete as Linear 2024 specified Feet 490.00 467.70 -22.30 $132.00 $2,943.60 Furnish and install 42" storm sewer; complete as Linear 2027 .specified Feet 10.001 14.00 4.00 $360.00 $1,440.00 Furnish and install 48" storm sewer; complete as Linear 2030 specified Feet 420.00 402.00 -18.00 $127.00 $2.286.00) Furnish and install 54" storm sewer; complete as Linear 2033 specified Feet 650.00 611.00 -39.00 $208.00 $8,112.00 Furnish and install 60" storm sewer; complete as Linear 2036 specified Feet 460.00 434.05 1 -25.95 $167.00 $4,333.65 Furnish and install 29" x 45" HERCP Class HI storm sewer; complete as Linear 2051 specified Feet 10.001 8.00 -2.00 $263.00 $526.00 60" HERCP Class III storm sewer; complete as Linear 1 2055 specified Feet 90.00 66.50 -23.50 $278.00 $6,533.00 Page 2 of 9 CONTRACT 18-02 CHANGE ORDER #1 (REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBERQUANTITY QUANTITIES INCREASE 05CREASE- PRICE CONTRA TPRICE CONTRACTPRI E Furnish and install 5' x 8' box culvert storm sewer, Linear 2079 complete as specified Feet 120.00 120.00 $860.00 Furnish and install 5' x 8' box culvert storm sewer with manhole or inlet - riser, complete as Linear 2103 specified Feet 11.00 11.00 $886.00 RCP Class III apron endwall with joint ties; 2140 complete as specified Each 2.00 2.00 $895.00 Furnish and install 24" RCP Class III apron endwall with joint ties; 2144 complete as specified Each 1.00 1.00 $1,125.00 RCP Class III apron endwall with joint ties; 2145 complete as specified Each 1.00 1.001 $1,210.00 RCP Class III apron endwall with joint ties; 2149 complete as specified Each 1.00 1.00 $2,175.00 RCP Class III apron endwall with joint ties; 2150 complete as specified Each 1.00 1.00 $3,375.00 RCP Class III apron endwall with joint ties; 2151 complete asspecified Each 2.00 2.00 $3,950.00 Furnish and install 5' x 8' box culvert end section with joint ties; complete 2178 as specified Each 1.00 1.00 $11,050.00 Furnish and install 8" perforated underdrain pipe; complete as Linear 2190 specified Feet 5,000.00 4.743.50 -256.50 - $74.00 $18,981.00) Furnish and install standard storm sewer manhole (5' diameter); Vertical 2202 complete as specified Feet 38.00 38.31 0.31 $571.00 1 $177.01 Furnish and install standard storm sewer manhole (8' diameter); Vertical 2205 complete as specified Feet 42.00 42.03 0.03 1 $729.00 $21.87 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as Vertical 2213 specified Feet 13.00 11.96 -1.04 $484.00 $503.36) Furnish and install standard storm sewer inlet manhole (5' diameter); complete as Vertical 2214 specified Feet 15.00 14.33 -0.67 $657.00 $440.18 Furnish and install standard storm sewer inlet manhole (8' diameter); complete as Vertical 2217 specified Feet 43.00 42.66 -0.34 $863.00 ($290.02) Furnish and install storm sewerjunction chamber M-1; complete as 2225A specified Each 1.00 1.00 $45,500.00 Page 3 of 9 CONTRACT 18-02CHANGE ORDER 41 (REVISED FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN Furnish and install storm QUANTITY QUANTITIES INCREASE DECREASE PRICIF QQMrRArTPRICE CONTRACTPRICE sewer junction chamber M-14; complete as 2225E specified Each 1.00 1.00 $19,250.00 Furnish and install storm sewer outlet structure; 2226 complete as specified Each 1.00 1.00 $9,100.00 Fnd i Furnish anstall standard storm sewer manhole riser (4' diameter); complete as Vertical 2227 specified Feel 5.00 4.81 -0.19 $165.00 $31.35 Furnish and install Type 3 inlet (with 18" sump); 2237 complete as specified Each 7.00 9.00 2.00 $2,050.00 $4,100.00 Furnish and insta116" storm sewer lateral; Linear 2400 complete as specified Feet 209.00 136.30 -72.70 $51.00 $3,707.70) Furnish and install storm sewer marker balls; 2404 complete as specified Each 21.00 20.00 -1.00 $41.00 $41.00 Furnish and install storm sewer clay dams; 2406 complete as s ecified Each 7.00 5.00 -2.00 $255.00 $510.00) Furnish and install storm sewer lateral inlet; 2408 complete as specified Each 4.00 3.00 A.00 $760.00 $760.00) Storm lateralinlet adjustments; complete as 2414 specified Each 4.00 3.00 -1.00 $505.00 $505.00 Furnish; install; maintain; and remove Type D modified inlet protection; 2508 complete asspecified Each 46.00 52.00 6.00 $140.00 $840.00 Sediment removal -Type D modified inlet protection; complete as 2510 specified Each 46.00 0.00 -46.00 $1.00 ($46.00 Furnish; install; maintain; and remove stone tracking pad; complete as 2512 s ecified Each 4.00 3.00 -1.00 $2,500.00 $2,500.00 Furnish; install; maintain; and remove silt fence; Linear 2514 complete ass ecified Feet 3,339.00 2,017.50 -1,321.50 $1.65 $2,180.48 Furnish; install; maintain; and remove silt fence/tracking pad at Southwest Industrial Park; complete as Lump 2514E specified Sum 1.00 0.00 -1.00 $2,685.00 $2,685.00 Install salvaged topsoil 6" depth; complete as Square 2602 specified Yards 42.630.00 18,648.00 -23.982.00 $0.80 $19,185.60) Install salvaged topsoil 12" depth; complete as Square 2606 specified Yards 2,835.00 2,088.50 -746.50 $3.00 $2,239.50) Furnish and install aquatic fencing; complete Linear 2609 lassoecified 1,754.00 1,660.90 -93.10 $3.65 $339,82 Furnish and install native seeding; complete as rFeet 1 2610 specified 10,773.00 3,842.10 -6,930.90 $0.90 ($6,237.81 Page 4 or 9 CONTRACT 18-02 CHANGE ORDER #1 (REVISED FINAL) 17EM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNfT INCREASE/N DECREASE IN UMBER nativeplete A TTY UANTITIES INCREASE DECREASE PRICE CONTRACTPR E CONTRA TP ICE as Square 2612 EFurnishandinstall Yards 18.28100 17,653.10 -627.90 $0.70 $439.53install turf lete as Square 2620 Yards 3.486.00 3,296.30 .-189.70 $0.50 $94.85 Furnish and install no - mow fescue; complete as Square 2622 specified Yards 10,028.00 9,546.00 -482.00 $0.45 $216.90) Furnish and install annual cover crop; complete as Square 2624 specified - Yards 42,567.00 45,702.68 3135.68 $0.15 $470.35 Furnish and install trees; 2626 complete as specified Each 15.00 15.00 $495.00 Furnish and install shrubs; complete as 2628 specified Each 53.00 53.00 $105.00 Furnish and install Class l; Type A erosion control mat; complete as Square 2630 specified Yards 42,567.00 34,180.90 -8,386.10 $1.00 $8,386.10 Furnish and install medium rip -rap with filter fabric; complete as Square 2648 specified Yards 2,795.00 2,536.60 -258.40 1 $35.00 $9,044.00 Fumish and install heavy rip -rap with filter fabric; Square 2650 complete asspecified Yards 644.00 440.00 -204.00 $36.00 $7,344.00 Furnish and install Scour Stop; complete as Square 2653 Ispecified Yards 265.00 229.80 -35.20 $90.00 $3,168.00 Strip topsoil and restore stockpile at Southwest Industrial Perk; complete Square 2654 as specified Yards 182.00 0.00 -182.00 $8.00 $1,456.00 Abandon 8" - 12'.storm sewer; complete as Linear 2806 specified Feet 360.00 379.10 19A0 1 $8.00 $152.80 Abandon 15" and larger storm sewer; complete as Linear 2802 specified Feet 2.850.001 2.123.00 -727.00 $58.00 ($42,166.00 Remove 30" and smaller storm sewer; complete as Linear 2804 specified Feet 290.00 246.80 44.20 $22.00 1 ($972.40 Remove 33" - 60" storm sewer; complete as Linear 2806 specified Feet 60.00 121.90 61.90 $36.00 $2.228.40 Abandon storm sewer manholes and inlets; 2810 complete as specified Each 2.00 1.00 -1.00 $810.00 ($810.00) Remove storm sewer manholes and inlets; 2812 complete as specified Each 2.00 2.00 1 $525.00 Remove and dispose of existing bulkhead in MH 12-737; complete as 2813 specified Each 1.00 1,00 $2,025.00 Connect to existing storm sewer main; complete as 2850 specified - Each 15.00 16.00 1.00 $1,525.00 $1,525.00 Page 5 of 9 CONTRACT 18-02 CHANGE ORDER 41 (REVISED FINAL) DESCRIPTION UNIT ct to existing storm lateral; complete connect to existing storm sewer manhole; complete 2856 as specified I c-1, Connect to existing storm "v ].UV $1,850.00 sewer inlet; complete as 2858 specified Mobilization; complete as Each Lump 1.00 0.00 -1.00 $1,550.00 $1.55 ..00 2900 specified Strip and stockpile Sum 1.00 1.00 $105,000.00 topsoil; complete as Square 2902 specified Clear trees; complete as Yards Lump 36,000.00 34, 128.00 -1,872.00 $0.25 $468.00 2906 specified Sum 1.00 1.00 $15,000.00 Clear shrubs; complete Lump 2908 as s ecified Sum 1.00 1.00 $2,500.00 Grub stumps; complete Lump 2912 as specified Sum 1.00 1.00 $10,000.00 General excavation; Lump 2930 complete as specified Sum 1.00 1.00 $1,500,000.00 Excavation below subgrade - detention basin; complete as Cubic 2931 specified Import clay material; Yards Cubic - 8,000.00 0.00 -8,000.00 $0.01 ($80.00) 2932 complete as specified Yards 51000.00 0.00 -5,000.00 $8.00 Construct clay liner; Lump $40.000.00 2934 complete as specified Sum 1.00 1.00 $195,000.00 Furnish and install geocomposite drainage layer, complete as Square 2941 specified Yards 50.505.00 50,415.00 -90.00 $5.00 Furnish and install 8" $450.00 backfow preventer; 2943 complete as specified Each 2.00 2.00 $1,400.00 Furnish and install 12" backflow preventer, 2945 com late as specified Each 1.00 1.00 Furnish; install; maintain; $2,150.00 and remove HOPE safety fencing; complete as Linear 2946 specified Furnish antl install 8" Feet 3,098.00 1,683.00 -1,415.00 $4.60 $6,5D9.00 sanitary sewer (relay); Linear 3000 complete as specified Feet 10.00 8.50 -1.50 $228.00 Furnish and install 10" $342.00 sanitary sewer (relay); Linear 3002 complete as specified Feet 10.00 0.00 -10.00 $253.00 Furnish and install8" $2,530.00 sanitary sewer (new); Linear 3030 complete as specified Feet 440.00 419.90 -20.10 $102.00 Furnish and install $2,050.20 standard sanitary sewer manhole (4' diameter); Vertical 3100 complete as specified Feet 255.00 253.65 -1.35 $310.00 Furnish and install ($418.50) external sanitary sewer manhole chimney seal; 3114 complete as specified Each 4.00 3.00 $385.00 $385.00) Page 6 of 9 CONTRACT 18-02 CHANGE ORDER 91 (REVISED FINAL) ITEM N MBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT ICREASEIN DECREASEIN Furnish and install 8" x 6" ANTITY QUANTITIES INCREASE PECREAS PRICE CONTRACTPRICE CONTRACTPRICE sanitary sewer factory Wyss or tees; complete as 3210 specified Each 3.00 0.00 -3.00 $455.00 $1,365.00 Furnish and install 10" x 6" sanitary sewer factory wyes or tees; complete as 3212 specified Each 2.00 0.00 -2.00 $556.00 $1,112.00) Furnish and install 476" sanitary sewer lateral (relay); complete as Linear 3234 specified Feet 150.00 0.00 -150.00 $70.00 ($10,500.00 Furnish and install - sanitary sewer lateral marker balls; complete as 3236 specified Each 10.00 0.00 -10.00 $52.00 ($520.00) Furnish and install clay dams; complete as 3238 specified Each 5.00 0.00 1 -5.00 $255.00 $1,275.00 Furnish and install connection to existing 8" sanitary sewer mains; 3300 complete as specified Each 6.00 2.00 -4.00 1 $1,900.00 $7,600.00 Furnish and install connection to existing 10" sanitary sewer mains; 3302 complete as specified Each 4.00 0.00 -4.00 $2,050.00 ($8,200.00 Core into existing manhole; complete as 3332 specified Each 1.00 1.00 $3,150.00 Crack and damage survey; complete as 3650 specified Each 21.00 16.00 -5.00 $1,500.00 $7,500.00 Abandon sanitary. sewer manholes; complete as 3800 specified Each 1.00 1.00 $675.00 Abandon 6" sanitary sewer, complete as Linear 3801 specified Feet 50.00 0.00 -50.00. $17.00 $850.00 Abandon 8" sanitary sewer, complete as Linear 3802 s ecified Feet 430.00 370.80 -59.20 $11.00 $651.20 Remove sanitary sewer; Linear 3854 complete as specified Feet 300.00 28.40 -271.60 $6.00 $1,629.60 Furnish and install 8" - ductile iron water main (relay) with polywrap; Linear 4004 complete as specified Feet 50.00 70.00 20.00 $350.00 $7,000.00 Furnish and install 10" ductile iron water main (relay) with polywrap; Linear 4006 complete as specified Feet 150.00 154.00 4.00 $275.00 $1,100.00 Furnish and install 12" ductile iron water main (relay) with polywrap; Linear 4008 complete as specified Feet 40.00 62.00 22.00 $285.00 $6,270.00 Furnish and install 1" water service (relay); Linear 4036 complete asspecified Feet 53.00 0.00 -53.00 $86.00 $4,558.00 Furnish and install 1" corporation and stop box; 4048 complete as specified - Each 5.00 7.00 2.00 $975.00 $1.950.00 Page 7 of 9 CONTRACT 18.02 CHANGE ORDER 91 (REVISED FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN Furnish and install QUANTITYQUANTITIES INCREASE DECREASE PRICE CONTRA PRICE COMRA TP ICE connections to existing 8" water main; complete as 4060 specified Each 4.00 2.00 -2.00 $3,550.00 $7,100.00 Furnish and install connections to existing 10" water main; complete 4062 as specified Each 4.00 4.00 $3,850.00 Furnish and install connections to existing 12" water main; complete 4064 as specified Each 2.00 2.00 $4,550.00 Furnish and install 10" x 12" water main cross; 4197 complete as specified Each 1.00 1.00 $1,650.00 Furnish and install 8" 45 degree water main bend; 4237 complete as s ecified Each 8.00 10.00 2.00 $325.00 $650.00 Furnish and install 10" 45 degree water main bend; 4238 complete asspecified Each 8,00 12.00 4.00 $450.00 $1,800.00 Furnish and install 12" 45 degree water main bend; 4239 complete as specified Each 4.00 4.00 $760.00 Furnish and install 8" water main cap; complete 4255 as specified Each 1.00 . 0.00 -1.00 $2,400.00 $2,400.00 Furnish and install 8" water main gate valve; 4402 complete as specified Each 1.00 0.00 1 -1.00 $2,050.00 $2,050.00 Furnish and install 10" water main gate valve; 4403 complete as specified 4' Each 4.00 4.00 $2,230.00 Furnish and install water main gate valve; 4404 complete asspecified Each 2.00 2.00 $2.775.00 Furnish and install 10" x 8" tapping valve and sleeve; complete as 4438 specified Each 1 2.00 2.00 $5.300.00 Furnish and install 24" water main casing pipe; Linear 4730 complete asspecified Feet 0.001 2.00 $555.00 $1,110.00 SECTION (BID ITEMS 1100 - 4730) - SUBTOTAL: $74,564.26 ($326,080.96) NET DECREASE TO SECTION: - ($250,516.70) ADDITIONAL WORK REQUIRED CO #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE/N NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPR/CE Furnish and install additional traffic control for Packer/Main Street intersection; complete as Lump 1-1998 specified Sum 0.00 1.00 1.00 $3,675.00 $3,675.00 Liquidated damages for truck route infractions; 1-1999 complete as specified Each 0.00 2.00 2.00 ($250.00) ($500.00) Furnish and install 10" storm sewer; complete as Linear 1-2002 specified Feet 0.00 32.40 32.40 1 $73.50 1 $2,381.40 Page 8 of 9 CONTRACT 18-02 CHANGE ORDER 01 (REVISED FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN Furnish and install QUANTITY QUANTITIES /NCREA DECREA E PRICE CONTRACTPRI CONTRAC PRICE standard storm sewer; manhole (6' diameter); Vertical 1-2203 complete as specified Feet 0.00 7.76 7.76 $656.25 $5,092.60 Furnish and intall Turf Reinforce Mat System; Square 1-2638 complete as specified Yards 0.00 843.20 843.20 $21.34 $17,993.89 Furnish and install temporary soil stabilization compound; Lump 1-2997 complete as specified Sum 0.00 1.00 1.00 $1,334.70 $1,334.70 Down time to expose existing lateral; complete Lump 1-2998 as specified Sum 0.00 1.00 1.00 $874.42 $874.42 Excavate/Remove/Isolate existing septic field encumbrances within Jackson Street easement; complete as Lump 1-2999 Ispecified Sum 0.00 1.00 1.00 1 $8,137.00 $8,137.00 Furnish and install new 6" ductile iron water main with polywrap; complete Linear 1-4020 as specified Feet 0.00 15.50 15.50 $115.50 $1,790.25 Furnish and install connections to existing 6" water main; complete as 1-4058 specified Each 0.00 1.00 1.00 $2,625.00 $2,625.00 Furnish and install 8" 22.5 degree water main bend; 1-4228 complete as specified Each 0.00 1.00 1.00 1 1 $325.00 $325.00 Furnish and install 10" 22.5 degree water main bend; complete as 1-4229 specified. Each 0.00 3.00 3.00 $450.00 $1,350.00 Furnish and Install 6" 45- degree water main bend; 1.4236 complete asspecified Each 0.00 2.00 2.00 $288.75 $577.50 Furnish and install 10" sleeve; complete as 1-4301 specified Each 0.00 3.00 3.00 $3,360.00 $10,080.00 Furnish and install 6" water main gate valve; 1-4401 complete as specified Each 0.00 1.00 1.00 $1,837.50 $1.837.50 Furnish and install Ispecified hydrant; complete as 1-4500 Each 0.00 1.00 1.00 $4.305.00 $4,305.00 (BID ITEMS 1-1998-1.4600)-SUBTOTAL: $61,879.16 $0.00 NET INCREASE TO SECTION: $61,879.16 NET DECREASE TO SECTION: ($250,516.70) NET INCREASE TO SECTION: $61,879.16 NET DECREASE TO CONTRACT: ($188,637.54) Page 9 of 9