HomeMy WebLinkAboutChange Order No 1 RC ExcavatingTO: RC EXCAVATING INC.
3125 BIRCH ROAD, SUITE D
SUAMICO, WI 54173
CHANGE ORDER #1 (REVISED FINAL)
DATE: OCTOBER 7, 2019
Your present contract with the City of Oshkosh, Contract No. 18-02, awarded May 22, 2018, is hereby amended
and changed as follows:
NET DECREASE TO SECTION:
($250,516.70)
NET INCREASE TO SECTION:
$61,879.16
NET DECREASE TO CONTRACT
($188,637.64)
SECTION I
TOTALS
BID TOTAL
$4,798,337.95
$4,798,337.95
CO #1
($188,637.54)
($188,637.54)
CONTRACT TOTAL
$4,609,700.41
$4,609,700.41
CITY OF OSHKOSH
BY: (—
city MManrag�
City Clerk
Approved and accepted:
�.0 EXGWR-TflyGi�i✓L
Con ctor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh Wisconsin,
under the within Change Order. 4�
�v^
Comptroll r
Approved
A"If... fatuitilllliia ui
CONTRACT 18.02 CHANGE ORDER #1 (REVISED FINAL)
18-02
ITEM
NUM R
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
Removing pavement;
Square
UR TIry
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTERICE
CONTRACTPRICE
1100
com fete as specified
Yards
7,084.00
6,861.30
-222.70
$5.00
$1,113.50)
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120
specified
Feet
5,368.00
4,590.41
-777.59
$0.60
$$66.54
Removing existing silt
and safety fencing;
Linear
1190
complete asspecified
1,060.00
1,054.70
-5.30
$1.30
($6,89
Removing and salvaging
existing chain -link fencing
and gate; complete as
1191
specified
FFeet
1,930-00
1,930.00
$2.05
8" concrete pavement;
with 6" CABC and
grading; complete as
1311
specified
4,380.00
4,776.10
396.10
$52.00
$20.597.20
Pavement ties; complete
1350
as specified
Each
150.00
214.00
64.00
$8.10
$518.40
Drilled dowel bars; 1 1/4-,
1354
cam lete as specified
Each
270.00
130.00
-140.00
$14.25
$1,995.00
Adjust manholes and
inlets; complete as
1360
specified
Each
63.00
57.00
-6.00
$305.00
$1,830.00)
Turf restoration; complete
Square
1370
as specified
Yards
1.575.00
1,800.06
225.06
$9.00
$2,025.54
30" curb and gutter; 8";
with 6" CABC and
grading; complete as
Linear
1442
specified
Feet
1,080.00
377.50
-702.50
1 $28.00
$19,670.00)
36" mountable curb and
gutter; 8"; with 6" CABC
and grading; complete as
Linear
1450
specified
Feet
77.00
199.00
122.00
$40.50
$4.941.00
4" concrete sidewalk with
3" CABC and grading;
Square
1500
complete asspecified
Feet
1,840.00
2,599.08
759.08
$6.05
$4,592.43
6" concrete sidewalk/
driveway/ramp with 3"
CABC and grading;
Square
1510
complete as specified
Feet
4.840.00
3.977.99
1
-862.01
$7.35
$6,335.77)
Curb ramp detectable
warning field (naturaVnon-
painted); complete as
Square
1540
specified
Feet
48.00
48.00
$35.00
No. 4 reinforcing rods -
deformed; epoxy -coated;
Linear
1550
complete ass specified
Feet
75.00
0.00
-75.00
$1.25
$93.75
Drilled No. 4 sidewalk tie
bars - deformed; epoxy -
coated; complete as
1560
specified
Each
31.00
36.00
5.00
$5.05
$25.25
Locate existing property
monuments; complete as
1650
specified
Each
5.00
0.00
-5.00
$250.00
$1,250.00
Locate existing survey
monuments; complete as
E1652specified
specified
Each
1.00
0.00
-1.00
$250.00
$250.00)
Replace existing property
monuments; complete as
Each 1
5.001
0.00
-5.00 1
$250.00
$1,250.00
Page 1 of
CONTRACT 18.02 CHANGE ORDER #1 (REVISED FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
ANTIQUANTITIES
INCREASE
DECREASE
PRICE
CONTRACIP&CE
CONTRACTPRI E
Replace existing survey
monuments; complete as
1653
specified
Each
1.00
0.00
-1.00
$250.00
$250.00
Sawing existing
pavement; complete as
Linear
1700
specified
Feet
280.00
337.60
57.60
$2.00
$115.20
Sawing Concrete
pavement full depth;
Linear
- -
1710
complete as specified
Feet
1,120.00
1,597.35
477.35
$2.00
$954.70
Tack coat; complete as
1900
specified
Gallons
141.00
125.00
-16.00
$4.05
$64.80
4" asphaltic pavement LT
With 10" CABC and
grading; Complete as
Square
1906
specified
Yards
396.00
419.00
23.00
$48.50
$1,115.50
5" asphaltic transition MT
with 10" CABC and
-
grading; complete as
Square
1910
specified
Yards
44.00
0.00
1 -44.00
$70.00
1
($3,080.00
Furnish and install
Jackson Street pavement;
Square
1920
complete as specified
Yards
1,498.00
1,574.50
76.50
$80.00
$6,120.00
Furnish and install 8"
storm sewer; complete as
Linear
2001
specified
Feet
378.00
355.50
-22.50
$68.50
$1,541.25
Furnish and install 12"
storm sewer; complete as
Linear
2003
specified
Feet
446.00
360.60
-85.40
$76.00
$6,490AD
Furnish and install 21"
storm sewer; complete as
Linear
2012
specified
Feet
5.00
0.00
-5.00
$114.00
$570.00
Furnish and install 24"
storm sewer; complete as
Linear
2015
specified
Feet
260.001
213.90
-46.10
$107,00
$4,932.70
Furnish and install 27"
storm sewer, complete as
Linear
2018
specified
Feet
60.00
71.801
11.80
$127.00
$1,498.60
Furnish and install 30"
storm sewer; complete as
Linear
2021
specified
Feet
260.00
247.00
1
•13.00
$137.00
$1,781.00
Furnish and install 36"
storm sewer; complete as
Linear
2024
specified
Feet
490.00
467.70
-22.30
$132.00
$2,943.60
Furnish and install 42"
storm sewer; complete as
Linear
2027
.specified
Feet
10.001
14.00
4.00
$360.00
$1,440.00
Furnish and install 48"
storm sewer; complete as
Linear
2030
specified
Feet
420.00
402.00
-18.00
$127.00
$2.286.00)
Furnish and install 54"
storm sewer; complete as
Linear
2033
specified
Feet
650.00
611.00
-39.00
$208.00
$8,112.00
Furnish and install 60"
storm sewer; complete as
Linear
2036
specified
Feet
460.00
434.05
1
-25.95
$167.00
$4,333.65
Furnish and install 29" x
45" HERCP Class HI
storm sewer; complete as
Linear
2051
specified
Feet
10.001
8.00
-2.00
$263.00
$526.00
60" HERCP Class III
storm sewer; complete as
Linear
1
2055
specified
Feet
90.00
66.50
-23.50
$278.00
$6,533.00
Page 2 of 9
CONTRACT 18-02 CHANGE ORDER #1 (REVISED FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBERQUANTITY
QUANTITIES
INCREASE
05CREASE-
PRICE
CONTRA TPRICE
CONTRACTPRI E
Furnish and install 5' x 8'
box culvert storm sewer,
Linear
2079
complete as specified
Feet
120.00
120.00
$860.00
Furnish and install 5' x 8'
box culvert storm sewer
with manhole or inlet
-
riser, complete as
Linear
2103
specified
Feet
11.00
11.00
$886.00
RCP Class III apron
endwall with joint ties;
2140
complete as specified
Each
2.00
2.00
$895.00
Furnish and install 24"
RCP Class III apron
endwall with joint ties;
2144
complete as specified
Each
1.00
1.00
$1,125.00
RCP Class III apron
endwall with joint ties;
2145
complete as specified
Each
1.00
1.001
$1,210.00
RCP Class III apron
endwall with joint ties;
2149
complete as specified
Each
1.00
1.00
$2,175.00
RCP Class III apron
endwall with joint ties;
2150
complete as specified
Each
1.00
1.00
$3,375.00
RCP Class III apron
endwall with joint ties;
2151
complete asspecified
Each
2.00
2.00
$3,950.00
Furnish and install 5' x 8'
box culvert end section
with joint ties; complete
2178
as specified
Each
1.00
1.00
$11,050.00
Furnish and install 8"
perforated underdrain
pipe; complete as
Linear
2190
specified
Feet
5,000.00
4.743.50
-256.50 -
$74.00
$18,981.00)
Furnish and install
standard storm sewer
manhole (5' diameter);
Vertical
2202
complete as specified
Feet
38.00
38.31
0.31
$571.00 1
$177.01
Furnish and install
standard storm sewer
manhole (8' diameter);
Vertical
2205
complete as specified
Feet
42.00
42.03
0.03
1
$729.00
$21.87
Furnish and install
standard storm sewer
inlet manhole (4'
diameter); complete as
Vertical
2213
specified
Feet
13.00
11.96
-1.04
$484.00
$503.36)
Furnish and install
standard storm sewer
inlet manhole (5'
diameter); complete as
Vertical
2214
specified
Feet
15.00
14.33
-0.67
$657.00
$440.18
Furnish and install
standard storm sewer
inlet manhole (8'
diameter); complete as
Vertical
2217
specified
Feet
43.00
42.66
-0.34
$863.00
($290.02)
Furnish and install storm
sewerjunction chamber
M-1; complete as
2225A
specified
Each
1.00
1.00
$45,500.00
Page 3 of 9
CONTRACT 18-02CHANGE ORDER 41 (REVISED FINAL)
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASEIN
Furnish and install storm
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICIF
QQMrRArTPRICE
CONTRACTPRICE
sewer junction chamber
M-14; complete as
2225E
specified
Each
1.00
1.00
$19,250.00
Furnish and install storm
sewer outlet structure;
2226
complete as specified
Each
1.00
1.00
$9,100.00
Fnd i Furnish anstall
standard storm sewer
manhole riser (4'
diameter); complete as
Vertical
2227
specified
Feel
5.00
4.81
-0.19
$165.00
$31.35
Furnish and install Type 3
inlet (with 18" sump);
2237
complete as specified
Each
7.00
9.00
2.00
$2,050.00
$4,100.00
Furnish and insta116"
storm sewer lateral;
Linear
2400
complete as specified
Feet
209.00
136.30
-72.70
$51.00
$3,707.70)
Furnish and install storm
sewer marker balls;
2404
complete as specified
Each
21.00
20.00
-1.00
$41.00
$41.00
Furnish and install storm
sewer clay dams;
2406
complete as s ecified
Each
7.00
5.00
-2.00
$255.00
$510.00)
Furnish and install storm
sewer lateral inlet;
2408
complete as specified
Each
4.00
3.00
A.00
$760.00
$760.00)
Storm lateralinlet
adjustments; complete as
2414
specified
Each
4.00
3.00
-1.00
$505.00
$505.00
Furnish; install; maintain;
and remove Type D
modified inlet protection;
2508
complete asspecified
Each
46.00
52.00
6.00
$140.00
$840.00
Sediment removal -Type
D modified inlet
protection; complete as
2510
specified
Each
46.00
0.00
-46.00
$1.00
($46.00
Furnish; install; maintain;
and remove stone
tracking pad; complete as
2512
s ecified
Each
4.00
3.00
-1.00
$2,500.00
$2,500.00
Furnish; install; maintain;
and remove silt fence;
Linear
2514
complete ass ecified
Feet
3,339.00
2,017.50
-1,321.50
$1.65
$2,180.48
Furnish; install; maintain;
and remove silt
fence/tracking pad at
Southwest Industrial
Park; complete as
Lump
2514E
specified
Sum
1.00
0.00
-1.00
$2,685.00
$2,685.00
Install salvaged topsoil 6"
depth; complete as
Square
2602
specified
Yards
42.630.00
18,648.00
-23.982.00
$0.80
$19,185.60)
Install salvaged topsoil
12" depth; complete as
Square
2606
specified
Yards
2,835.00
2,088.50
-746.50
$3.00
$2,239.50)
Furnish and install
aquatic fencing; complete
Linear
2609 lassoecified
1,754.00
1,660.90
-93.10
$3.65
$339,82
Furnish and install native
seeding; complete as
rFeet
1
2610
specified
10,773.00
3,842.10
-6,930.90
$0.90
($6,237.81
Page 4 or 9
CONTRACT 18-02 CHANGE ORDER #1 (REVISED FINAL)
17EM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNfT
INCREASE/N
DECREASE IN
UMBER
nativeplete
A TTY
UANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPR E
CONTRA TP ICE
as
Square
2612
EFurnishandinstall
Yards
18.28100
17,653.10
-627.90
$0.70
$439.53install
turf
lete as
Square
2620
Yards
3.486.00
3,296.30
.-189.70
$0.50
$94.85
Furnish and install no -
mow fescue; complete as
Square
2622
specified
Yards
10,028.00
9,546.00
-482.00
$0.45
$216.90)
Furnish and install annual
cover crop; complete as
Square
2624
specified -
Yards
42,567.00
45,702.68
3135.68
$0.15
$470.35
Furnish and install trees;
2626
complete as specified
Each
15.00
15.00
$495.00
Furnish and install
shrubs; complete as
2628
specified
Each
53.00
53.00
$105.00
Furnish and install Class
l; Type A erosion control
mat; complete as
Square
2630
specified
Yards
42,567.00
34,180.90
-8,386.10
$1.00
$8,386.10
Furnish and install
medium rip -rap with filter
fabric; complete as
Square
2648
specified
Yards
2,795.00
2,536.60
-258.40
1 $35.00
$9,044.00
Fumish and install heavy
rip -rap with filter fabric;
Square
2650
complete asspecified
Yards
644.00
440.00
-204.00
$36.00
$7,344.00
Furnish and install Scour
Stop; complete as
Square
2653
Ispecified
Yards
265.00
229.80
-35.20
$90.00
$3,168.00
Strip topsoil and restore
stockpile at Southwest
Industrial Perk; complete
Square
2654
as specified
Yards
182.00
0.00
-182.00
$8.00
$1,456.00
Abandon 8" - 12'.storm
sewer; complete as
Linear
2806
specified
Feet
360.00
379.10
19A0 1
$8.00
$152.80
Abandon 15" and larger
storm sewer; complete as
Linear
2802
specified
Feet
2.850.001
2.123.00
-727.00
$58.00
($42,166.00
Remove 30" and smaller
storm sewer; complete as
Linear
2804
specified
Feet
290.00
246.80
44.20
$22.00 1
($972.40
Remove 33" - 60" storm
sewer; complete as
Linear
2806
specified
Feet
60.00
121.90
61.90
$36.00
$2.228.40
Abandon storm sewer
manholes and inlets;
2810
complete as specified
Each
2.00
1.00
-1.00
$810.00
($810.00)
Remove storm sewer
manholes and inlets;
2812
complete as specified
Each
2.00
2.00
1
$525.00
Remove and dispose of
existing bulkhead in MH
12-737; complete as
2813
specified
Each
1.00
1,00
$2,025.00
Connect to existing storm
sewer main; complete as
2850
specified -
Each
15.00
16.00
1.00
$1,525.00
$1,525.00
Page 5 of 9
CONTRACT 18-02 CHANGE ORDER 41 (REVISED FINAL)
DESCRIPTION UNIT
ct to existing storm
lateral; complete
connect to existing storm
sewer manhole; complete
2856 as specified I c-1,
Connect to existing storm
"v
].UV
$1,850.00
sewer inlet; complete as
2858
specified
Mobilization; complete as
Each
Lump
1.00
0.00
-1.00
$1,550.00
$1.55 ..00
2900
specified
Strip and stockpile
Sum
1.00
1.00
$105,000.00
topsoil; complete as
Square
2902
specified
Clear trees; complete as
Yards
Lump
36,000.00
34, 128.00
-1,872.00
$0.25
$468.00
2906
specified
Sum
1.00
1.00
$15,000.00
Clear shrubs; complete
Lump
2908
as s ecified
Sum
1.00
1.00
$2,500.00
Grub stumps; complete
Lump
2912
as specified
Sum
1.00
1.00
$10,000.00
General excavation;
Lump
2930
complete as specified
Sum
1.00
1.00
$1,500,000.00
Excavation below
subgrade - detention
basin; complete as
Cubic
2931
specified
Import clay material;
Yards
Cubic
- 8,000.00
0.00
-8,000.00
$0.01
($80.00)
2932
complete as specified
Yards
51000.00
0.00
-5,000.00
$8.00
Construct clay liner;
Lump
$40.000.00
2934
complete as specified
Sum
1.00
1.00
$195,000.00
Furnish and install
geocomposite drainage
layer, complete as
Square
2941
specified
Yards
50.505.00
50,415.00
-90.00
$5.00
Furnish and install 8"
$450.00
backfow preventer;
2943
complete as specified
Each
2.00
2.00
$1,400.00
Furnish and install 12"
backflow preventer,
2945
com late as specified
Each
1.00
1.00
Furnish; install; maintain;
$2,150.00
and remove HOPE safety
fencing; complete as
Linear
2946
specified
Furnish antl install 8"
Feet
3,098.00
1,683.00
-1,415.00
$4.60
$6,5D9.00
sanitary sewer (relay);
Linear
3000
complete as specified
Feet
10.00
8.50
-1.50
$228.00
Furnish and install 10"
$342.00
sanitary sewer (relay);
Linear
3002
complete as specified
Feet
10.00
0.00
-10.00
$253.00
Furnish and install8"
$2,530.00
sanitary sewer (new);
Linear
3030
complete as specified
Feet
440.00
419.90
-20.10
$102.00
Furnish and install
$2,050.20
standard
sanitary sewer
manhole (4' diameter);
Vertical
3100 complete
as specified
Feet
255.00
253.65
-1.35
$310.00
Furnish
and install
($418.50)
external
sanitary sewer
manhole
chimney seal;
3114 complete
as specified
Each
4.00
3.00
$385.00
$385.00)
Page 6 of 9
CONTRACT 18-02 CHANGE ORDER 91 (REVISED FINAL)
ITEM
N MBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
ICREASEIN
DECREASEIN
Furnish and install 8" x 6"
ANTITY
QUANTITIES
INCREASE
PECREAS
PRICE
CONTRACTPRICE
CONTRACTPRICE
sanitary sewer factory
Wyss or tees; complete as
3210
specified
Each
3.00
0.00
-3.00
$455.00
$1,365.00
Furnish and install 10" x
6" sanitary sewer factory
wyes or tees; complete as
3212
specified
Each
2.00
0.00
-2.00
$556.00
$1,112.00)
Furnish and install 476"
sanitary sewer lateral
(relay); complete as
Linear
3234
specified
Feet
150.00
0.00
-150.00
$70.00
($10,500.00
Furnish and install
-
sanitary sewer lateral
marker balls; complete as
3236
specified
Each
10.00
0.00
-10.00
$52.00
($520.00)
Furnish and install clay
dams; complete as
3238
specified
Each
5.00
0.00
1 -5.00
$255.00
$1,275.00
Furnish and install
connection to existing 8"
sanitary sewer mains;
3300
complete as specified
Each
6.00
2.00
-4.00
1 $1,900.00
$7,600.00
Furnish and install
connection to existing 10"
sanitary sewer mains;
3302
complete as specified
Each
4.00
0.00
-4.00
$2,050.00
($8,200.00
Core into existing
manhole; complete as
3332
specified
Each
1.00
1.00
$3,150.00
Crack and damage
survey; complete as
3650
specified
Each
21.00
16.00
-5.00
$1,500.00
$7,500.00
Abandon sanitary. sewer
manholes; complete as
3800
specified
Each
1.00
1.00
$675.00
Abandon 6" sanitary
sewer, complete as
Linear
3801
specified
Feet
50.00
0.00
-50.00.
$17.00
$850.00
Abandon 8" sanitary
sewer, complete as
Linear
3802
s ecified
Feet
430.00
370.80
-59.20
$11.00
$651.20
Remove sanitary sewer;
Linear
3854
complete as specified
Feet
300.00
28.40
-271.60
$6.00
$1,629.60
Furnish and install 8"
-
ductile iron water main
(relay) with polywrap;
Linear
4004
complete as specified
Feet
50.00
70.00
20.00
$350.00
$7,000.00
Furnish and install 10"
ductile iron water main
(relay) with polywrap;
Linear
4006
complete as specified
Feet
150.00
154.00
4.00
$275.00
$1,100.00
Furnish and install 12"
ductile iron water main
(relay) with polywrap;
Linear
4008
complete as specified
Feet
40.00
62.00
22.00
$285.00
$6,270.00
Furnish and install 1"
water service (relay);
Linear
4036
complete asspecified
Feet
53.00
0.00
-53.00
$86.00
$4,558.00
Furnish and install 1"
corporation and stop box;
4048
complete as specified -
Each
5.00
7.00
2.00
$975.00
$1.950.00
Page 7 of 9
CONTRACT 18.02 CHANGE ORDER 91 (REVISED FINAL)
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
Furnish and install
QUANTITYQUANTITIES
INCREASE
DECREASE
PRICE
CONTRA PRICE
COMRA TP ICE
connections to existing 8"
water main; complete as
4060
specified
Each
4.00
2.00
-2.00
$3,550.00
$7,100.00
Furnish and install
connections to existing
10" water main; complete
4062
as specified
Each
4.00
4.00
$3,850.00
Furnish and install
connections to existing
12" water main; complete
4064
as specified
Each
2.00
2.00
$4,550.00
Furnish and install 10" x
12" water main cross;
4197
complete as specified
Each
1.00
1.00
$1,650.00
Furnish and install 8" 45
degree water main bend;
4237
complete as s ecified
Each
8.00
10.00
2.00
$325.00
$650.00
Furnish and install 10" 45
degree water main bend;
4238
complete asspecified
Each
8,00
12.00
4.00
$450.00
$1,800.00
Furnish and install 12" 45
degree water main bend;
4239
complete as specified
Each
4.00
4.00
$760.00
Furnish and install 8"
water main cap; complete
4255
as specified
Each
1.00
. 0.00
-1.00
$2,400.00
$2,400.00
Furnish and install 8"
water main gate valve;
4402
complete as specified
Each
1.00
0.00
1
-1.00
$2,050.00
$2,050.00
Furnish and install 10"
water main gate valve;
4403
complete as specified
4'
Each
4.00
4.00
$2,230.00
Furnish and install
water main gate valve;
4404
complete asspecified
Each
2.00
2.00
$2.775.00
Furnish and install 10" x
8" tapping valve and
sleeve; complete as
4438
specified
Each 1
2.00
2.00
$5.300.00
Furnish and install 24"
water main casing pipe;
Linear
4730
complete asspecified
Feet
0.001
2.00
$555.00
$1,110.00
SECTION (BID ITEMS 1100 - 4730) - SUBTOTAL: $74,564.26 ($326,080.96)
NET DECREASE TO SECTION: - ($250,516.70)
ADDITIONAL WORK REQUIRED CO #1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASE/N
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPR/CE
Furnish and install
additional traffic control
for Packer/Main Street
intersection; complete as
Lump
1-1998
specified
Sum
0.00
1.00
1.00
$3,675.00
$3,675.00
Liquidated damages for
truck route infractions;
1-1999
complete as specified
Each
0.00
2.00
2.00
($250.00)
($500.00)
Furnish and install 10"
storm sewer; complete as
Linear
1-2002
specified
Feet
0.00
32.40
32.40
1
$73.50 1
$2,381.40
Page 8 of 9
CONTRACT 18-02 CHANGE ORDER 01 (REVISED FINAL)
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASEIN
Furnish and install
QUANTITY
QUANTITIES
/NCREA
DECREA E
PRICE
CONTRACTPRI
CONTRAC PRICE
standard storm sewer;
manhole (6' diameter);
Vertical
1-2203
complete as specified
Feet
0.00
7.76
7.76
$656.25
$5,092.60
Furnish and intall Turf
Reinforce Mat System;
Square
1-2638
complete as specified
Yards
0.00
843.20
843.20
$21.34
$17,993.89
Furnish and install
temporary soil
stabilization compound;
Lump
1-2997
complete as specified
Sum
0.00
1.00
1.00
$1,334.70
$1,334.70
Down time to expose
existing lateral; complete
Lump
1-2998
as specified
Sum
0.00
1.00
1.00
$874.42
$874.42
Excavate/Remove/Isolate
existing septic field
encumbrances within
Jackson Street
easement; complete as
Lump
1-2999
Ispecified
Sum
0.00
1.00
1.00
1 $8,137.00
$8,137.00
Furnish and install new 6"
ductile iron water main
with polywrap; complete
Linear
1-4020
as specified
Feet
0.00
15.50
15.50
$115.50
$1,790.25
Furnish and install
connections to existing 6"
water main; complete as
1-4058
specified
Each
0.00
1.00
1.00
$2,625.00
$2,625.00
Furnish and install 8" 22.5
degree water main bend;
1-4228
complete as specified
Each
0.00
1.00
1.00
1 1
$325.00
$325.00
Furnish and install 10"
22.5 degree water main
bend; complete as
1-4229
specified.
Each
0.00
3.00
3.00
$450.00
$1,350.00
Furnish and Install 6" 45-
degree water main bend;
1.4236
complete asspecified
Each
0.00
2.00
2.00
$288.75
$577.50
Furnish and install 10"
sleeve; complete as
1-4301
specified
Each
0.00
3.00
3.00
$3,360.00
$10,080.00
Furnish and install 6"
water main gate valve;
1-4401
complete as specified
Each
0.00
1.00
1.00
$1,837.50
$1.837.50
Furnish and install
Ispecified
hydrant; complete as
1-4500
Each
0.00
1.00
1.00
$4.305.00
$4,305.00
(BID ITEMS 1-1998-1.4600)-SUBTOTAL: $61,879.16 $0.00
NET INCREASE TO SECTION: $61,879.16
NET DECREASE TO SECTION: ($250,516.70)
NET INCREASE TO SECTION: $61,879.16
NET DECREASE TO CONTRACT: ($188,637.54)
Page 9 of 9