HomeMy WebLinkAboutKL Engineering IncAGREEMENT
This AGREEMENT, made on the �day of U2 r 201� by and �
between the CITY OF OSHKOSH, party of the first part, hereinafter erred to as CITY,
and KL ENGINEERING, INC., 5400 King James Way, Suite 200, Madison, WI 53719, party
of the second part, hereinafter referred to as the CONSULTANT,
WITNESSETH:
The CITY and the CONSULTANT, for the consideration hereinafter named, enter
into the following AGREEMENT for ENGINEERING SERVICES FOR OREGON STREET
AND WEST 24TH AVENUE / HUGHES STREET TRAFFIC SIGNAL DESIGN.
ARTICLE I. PROTECT MANAGER
A. Assignment of Project Manager. The CONSULTANT shall assign the following
individual to manage the PROJECT described in this AGREEMENT:
Kelly Trac, P.E., PTOE — Project Manager
B. Changes in Project Manager. The CITY shall have the right to approve or
disapprove of any proposed change from the individual named above as Project Manager.
The CITY shall be provided with a resume or other information for any proposed substitute
and shall be given the opportunity to interview that person prior to any proposed change.
ARTICLE II. CITY REPRESENTATIVE
The CITY shall assign the following individual to manage the PROJECT described in
this AGREEMENT:
Dan Gabrilska — Civil Engineering Supervisor
ARTICLE III. SCOPE OF WORK
The CONSULTANT shall provide the services described in the CONSULTANT's
Proposal. The CITY may make or approve changes within the general Scope of Services in
this AGREEMENT. If such changes affect CONSULTANT's cost of or time required for
performance of the services, an equitable adjustment will be made through an amendment
to this AGREEMENT.
1:\Engineering\=CDWRACI X\ 2nd Paving\PmjecL1nformafion\Contract lnfo\Consultant Page 1 of 7
Agreements\n Eng Agreemmt-Traffic Signal Des -OR St & W 24th Av Rughes St Intersection 12-5
19.doa
All reports, drawings, specifications, computer files, field data, notes, and other
documents and instruments prepared by the CONSULTANT as instruments of service shall
become property of the CITY upon payment for those documents by the CITY to the
CONSULTANT, and shall remain the property of the CITY.
ARTICLE IV. STANDARD OF CARE
The standard of care applicable to CONSULTANT's services will be the degree of
skill and diligence normally employed by professional consultants or consultants
performing the same or similar services at the time said services are performed.
CONSULTANT will re -perform any services not meeting this standard without additional
compensation.
ARTICLE V. OPINIONS OF COST, FINANCIAL CONSIDERATIONS. AND SCHEDULES
In providing opinions of cost, financial analyses, economic feasibility projections,
and schedules for the PROJECT, CONSULTANT has no control over cost or price of labor
and materials; unknown or latent conditions of existing equipment or structures that may
affect operation or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by operating personnel or third parties; and
other economic and operational factors that may materially affect the ultimate project cost
or schedule. Therefore, it is understood between the parties the CONSULTANT makes no
warranty the CITY's actual project costs, financial aspects, economic feasibility, or schedules
will not vary from CONSULTANT's opinions, analyses, projections, or estimates.
ARTICLE VI. RECORD DRAWINGS
Record drawings, if required, will be prepared, in part, on the basis of information
compiled and furnished by others. CONSULTANT is not responsible for any errors or
omissions in the information from others the CONSULTANT reasonably relied upon and
are incorporated into the record drawings.
ARTICLE VII. CITY RESPONSIBILITIES
The CITY shall furnish, at the CONSULTANT's request, such information as is
needed by the CONSULTANT to aid in the progress of the PROJECT, providing it is
reasonably obtainable from City records.
To prevent any unreasonable delay in the CONSULTANT's work, the CITY will
examine all reports and other documents and will make any authorizations necessary to
proceed with work within a reasonable time period.
I:\Engineering\=CONTRAM\ID 2nd Paving\Project_Infom tion\Contrattlnfo\Cmuultant Page 2 of 7
Agreements\KL Eng Agre t-Tmffic Sgnal Des -OR St k W 24th Ave -Hughes& lntersction12Z-
19.doa
ARTICLE VIII. ASBESTOS OR HAZARDOUS SUBSTANCES
If asbestos or hazardous substances in any form are encountered or suspected,
CONSULTANT will stop its own work in the affected portions of the PROJECT to permit
testing and evaluation.
If asbestos is suspected, CONSULTANT will, if requested, manage the asbestos
remediation activities using a qualified subcontractor at an additional fee and contract
terms to be negotiated.
If hazardous substances other than asbestos are suspected, CONSULTANT will, if
requested, conduct tests to determine the extent of the problem and will perform the
necessary studies and recommend the necessary remedial measures at an additional fee and
contract terms to be negotiated.
The CITY recognizes CONSULTANT assumes no risk and/or liability for a waste or
hazardous waste site originated by other than the CONSULTANT.
ARTICLE IX. CITY'S INSURANCE
The CITY will maintain property insurance on all pre-existing physical facilities
associated in any way with the PROJECT.
The CITY will provide (or have the construction contractor(s) provide) a Builders
Risk All Risk insurance policy for the full replacement value of all project work including
the value of all onsite CITY -furnished equipment and/or materials associated with
CONSULTANT's services. Upon request, the CITY will provide CONSULTANT a copy of
such policy.
ARTICLE X. TIME OF COMPLETION
The work to be performed under this AGREEMENT shall be commenced and the
work completed within the time limits as agreed upon in the CONSULTANT's Proposal.
The CONSULTANT shall perform the services under this AGREEMENT with
reasonable diligence and expediency consistent with sound professional practices. The
CITY agrees the CONSULTANT is not responsible for damages arising directly or
indirectly from any delays for causes beyond the CONSULTANT's control. For the
purposes of this AGREEMENT, such causes include, but are not limited to, strikes or other
labor disputes, severe weather disruptions or other natural disasters, failure of performance
by the CITY, or discovery of any hazardous substances or differing site conditions. If the
h\Engineering\=MNTRAM\M0 2ad Paving\ Pmject_Informa[ion\ContraR trdoWumaltant Page 3of7
AgaementsM Eng Agreement-Taffic Signal Des-0R St & W 24th Ave -Hughes St lntersection_l25-
19.doa
delays resulting from any such causes increase the time required by the CONSULTANT to
perform its services in an orderly and efficient manner, the CONSULTANT shall be entitled
to an equitable adjustment in schedule.
ARTICLE XI. COMPONENT PARTS OF THE AGREEMENT
This AGREEMENT consists of the following component parts, all of which are as
fully a part of this AGREEMENT as if herein set out verbatim, or if not attached, as if hereto
attached:
1. This Instrument
2. CONSULTANT's Proposal dated August 16, 2019 and attached hereto
In the event any provision in any of the above component parts of this
AGREEMENT conflicts with any provision in any other of the component parts, the
provision in the component part first enumerated above shall govern over any other
component part which follows it numerically except as may be otherwise specifically
stated.
ARTICLE XII. PAYMENT
A. The Agreement Sum. The CITY shall pay to the CONSULTANT for the
performance of the AGREEMENT the total sum as set forth below, adjusted by any changes
hereafter mutually agreed upon in writing by the parties hereto:
• Time and Materials Not to Exceed $16,300 (Sixteen Thousand three Hundred
Dollars).
• Attached fee schedule shall be firm for the duration of this AGREEMENT.
B. Method of Payment. The CONSULTANT shall submit itemized monthly
statements for services. The CITY shall pay the CONSULTANT within thirty (30) calendar
days after receipt of such statement. If any statement amount is disputed, the CITY may
withhold payment of such amount and shall provide to CONSULTANT a statement as to
the reason(s) for withholding payment.
C. Additional Costs. Costs for additional services shall be negotiated and set
forth in a written amendment to this AGREEMENT executed by both parties prior to
proceeding with the work covered under the subject amendment.
L\Engineering=0 conB CTSNw 2nd Paving\rmjenmro.macion\cnnnad mfa\canunlfanf Page4of7
Agreements\KL Eng Agreement -Traffic Signal Des-0R St k W 2kh Avi,Haghea St Inrersection_12-5-
19.don
D. Indirect Costs. Indirect costs such as computer time, printing, copying, cell
phone charges, telephone charges, and equipment rental shall be considered overhead and
shall not be invoiced separately to the PROJECT.
E. Expenses. Expenses may be billed with up to a maximum of 10% mark-up.
All invoices with expenses shall include supporting documentation of the expense. Failure
to include the supporting documentation will result in the reduction of payments by the
amount of those expense(s) not including documentation.
ARTICLE XIII. HOLD HARMLESS
The CONSULTANT covenants and agrees to protect and hold the City of Oshkosh
harmless against all actions, claims, and demands to the proportionate extent caused by or
resulting from the intentionally wrongful or negligent acts of the CONSULTANT, his/her
agents or assigns, his/her employees, or his/her subcontractors related to the performance
of this AGREEMENT or be caused or result from any violation of any law or administrative
regulation, and shall indemnify the CITY for all sums including court costs, attorney fees,
and damages of any kind which the CITY may be obliged or adjudged to pay on any such
claims or demands upon the CITY's written demand for indemnification or refund for those
actions, claim, and demands caused by or resulting from intentional or negligent acts as
specified in this paragraph.
Subject to any limitations contained in Sec. 893.80 and any similar statute of the
Wisconsin Statutes, the CITY further agrees to hold CONSULTANT harmless from any and
all liability, including claims, demands, losses, costs, damages, and expenses of every kind
and description (including death), or damages to person or property arising out of re -use of
the documents without consent where such liability is founded upon or grows out of the
acts or omission of any of the officers, employees or agents of the City of Oshkosh while
acting within the scope of their employment.
ARTICLE XIV. INSURANCE
The CONSULTANT agrees to abide by the attached City of Oshkosh Insurance
Requirements.
I:\Engir ring\=CONTRAM\13g2nd Paving\ Pmjenmrom„6un\contnR WOCoroulteot Page50f7
AgxmMNWL Eng Agreemffi ent-Trac Signal Des-0St R k W 24th Ave -Hughes St Intersection 12-5-
19.doa
ARTICLE XV. TERMINATION
A. For Cause. If the CONSULTANT shall fail to fulfill in timely and proper
manner any of the obligations under this AGREEMENT, the CITY shall have the right to
terminate this AGREEMENT by written notice to the CONSULTANT. In this event, the
CONSULTANT shall be entitled to compensation for any satisfactory, usable work
completed.
B. For Convenience. The CITY may terminate this AGREEMENT at any time by
giving written notice to the CONSULTANT no later than ten (10) calendar days before the
termination date. If the CITY terminates under this paragraph, then the CONSULTANT
shall be entitled to compensation for any satisfactory work performed to the date of
termination.
This document and any specified attachments contain all terms and conditions of the
AGREEMENT and any alteration thereto shall be invalid unless made in writing, signed by
both parties and incorporated as an amendment to this AGREEMENT.
ARTICLE XVI. RE -USE OF PROTECT DOCUMENTS
All reports, drawings, specifications, documents, and other deliverables of
CONSULTANT, whether in hard copy or in electronic form, are instruments of service for
this PROJECT, whether the PROJECT is completed or not. The CITY agrees to indemnify
CONSULTANT and CONSULTANT's officers, employees, subcontractors, and affiliated
corporations from all claims, damages, losses, and costs, including, but not limited to,
litigation expenses and attorney's fees arising out of or related to the unauthorized re -use,
change, or alteration of these project documents.
ARTICLE XVII. SUSPENSION DELAY OR INTERRUPTION OF WORK
The CITY may suspend, delay, or interrupt the services of CONSULTANT for the
convenience of the CITY. In such event, CONSULTANT's contract price and schedule shall
be equitably adjusted.
I:\Engineering\=0 CONTRACTS\2f1-0S 2nd Paving\PmjWLTnPommtion\Contract Info\Consuhant
Agreements\RE Eng Agreement -Traffic Signal 0e 01$&1241h Ave -Hughes St Intersediun_12-S Page 6of7
19.d.
ARTICLE XVIII. NO THIRD -PARTY BENEFICIARIES
This AGREEMENT gives no rights or benefits to anyone other than the CITY and
CONSULTANT and has no third -party beneficiaries.
In the Presence of:
(Seal of Consultant
if a Corporation)
(Witness)
(Witness)
APPROVED:
CONSULTANT
BY: '^ dSt a
1ee51 De d r
(Specify Title)
By:
(Specify Title)
Title)
CITY OF OSHKOSH
By:
Mare A. Rohloff, City Manager
And:
Pamela R. Ubrig, City Cle
I hereby certify that the necessary provisions
have been made to pay the liability which
will accrue under this AGREEMENT.
/a/- 4::7zz -
City Comptroller
I:\Engim fing\2=COWRAMf 2OL 2M Paving\RojeR_Info mafion\Con rad lnfo\Cmuoltant Page % Of %
Agmementa\KL Eng Agreement-Taffia Signal Oea-0R St & W 14th Av Hughee St intemernon 12-5- g
19.Eoa
giiLaEn
(A] BetterExperience
August 16, 2019
5400 King James Way I Suite 200
Madison, WI 53719
608.663.1218
Toll Free: 800.810.4012
www. klengine eying. com
RECEivED
Justin Gierach, PE DEC —2 2019
Engineering Division Manager/City Engineer DEPT OF pV
City
of Oshkosh
— Department
nt f Public Works OSHKOSy, W1SC HORNS
Oshkosh, WI 54901
RE: Proposal for Engineering Services — Oregon St & W 24'h Ave / Hughes St Traffic Signal Design
Dear Justin:
KL Engineering, Inc. is pleased to provide you with this proposal for engineering services to perform traffic
signal design for the Oregon Street & W 24th Avenue / Hughes Street intersection.
The following attachments are included with this letter, and should be considered part of our contract for
engineering services:
• Attachment A — Contract Assumptions and Scope of Services
• Attachment B — Billing Schedule
The total cost for the services under this contract will be billed on an hourly basis utilizing the enclosed billing
schedule with a maximum cost of $16,300.00
We look forward to working with you on this project. Please let us know if you have any questions regarding
this proposal.
Sincerely,
KL Engineering, Inc.
Kelly Trac, P.E., PTOE
Project Manager
fVwQ aMWunloojo=, of osnRu:nwrepm.zau�Nuanwwroposs� lemr.d_
Contract Assumptions and Scope of Services
Traffic Engineering and Electrical Design Services
Oregon St & W 24th Ave / Hughes St Traffic Signal Design
Oshkosh, Wisconsin
August 16, 2019
This document describes contract assumptions and provides a scope of services to perform traffic engineering and
electrical design services for the Oregon St & W 24th Ave / Hughes St signalized intersection in Oshkosh, Wisconsin.
This scope of services consists of traffic signal design, geometric design assistance, and coordination tasks.
General Project Understanding and Assumptions
Traffic Signal Design
• The project includes reconstruction of the Oregon St & W 241h Ave / Hughes St traffic signals and will include
the following:
o Overhead signals will be placed on trombone arm assemblies
o Flashing Yellow Arrows (FYA) will not be used for permitted left -turn phases
o Pedestrian signals following ADA standards will be included on all approaches with crosswalks
o Grid Smart Camera System for traffic signal detection
o WisDOT traffic signal infrastructure and equipment. Decorative or other "non-standard" equipment
is not included.
• Traffic signal cable routing will meet City of Oshkosh standards.
• Traffic signal timing is not included under this proposal.
• Temporary traffic signals are not included under this proposal.
• Geometric design, pavement marking, and signing modifications for the intersection will be completed by City
of Oshkosh. KL Engineering will provide design assistance at the intersection for pedestrian accommodations.
Project Delivery and Administration
• This proposal assumes the City of Oshkosh will provide Feld surveyed base mapping and CAD files for the
project. Field surveyed project data includes topography, utility locations, and right-of-way boundaries.
• This proposal assumes the City of Oshkosh will complete the overall project and intersection design, except
for items included in this scope of services. City of Oshkosh will compile and prepare the bidding documents
for advertisement.
• KL Engineering will provide CAD in AutoCAD 2018 format.
• This proposal is based on completing plans for one (1) letting to be advertised.
• This proposal does include providing a limited support role during the construction phase of the project.
Scope of Services
Traffic Signal Design
• Prepare new traffic signal construction plans for the intersection of Oregon St & W 24th Ave / Hughes St. Traffic
signal plans to include the following:
o Traffic signal concrete base removal plans
o Permanent traffic signal plans
o Sequence of Operations sheet
o Cable routing sheet
o Traffic signal details
o Miscellaneous Quantities
Traffic signal design will be completed per MUTCD, WisDOT TSDM, and City of Oshkosh requirements.
Traffic signal plans will be developed in the WisDOT format as described in the FDM.
Submittals
• Prepare up to two (2) plan submittals for the project: Preliminary plans and Final PS&E plans.
• Final design plans will include: electrical design (conduit/pullboxes/cabling/wiring), final equipment layout,
hardware requirements, signal control requirements, construction cost estimate, and specifications.
Geometric Design & Construction Support
• Includes up to sixteen (16) hours of intersection design support.
• Includes up to sixteen (16) hours of administrative and technical support to address inquiries regarding design
intent, contractor questions, design change requests, electrical inspection, and project meetings.
Meetings and Project Management
• Includes up to one (1) meeting with the City of Oshkosh.
KM ntr OsWunidpeMtyofOshkosh\Oregon-24N Hughes Uat menlA-ScopeaSeMm.docx 2 of 2
Engineerinq
f!q!ter Experience
STANDARD BILLING RATE SCHEDULE
EFFECTIVE JANUARY 1, 2019
Standard Billina Rates
Administration
$65.00
Limited Term Employee
$45.00
Engineering Technician 1
$67.00
Engineering Technician II
$77.00
Senior Engineering Technician
$90.00
Surveyor
$70.00
Registered Land Surveyor
$105.00
Environmental Specialist
$110.00
Electrical Designer/Inspector
$110.00
Transportation Planner
$110.00
GIS Specialist
$110.00
Registered Landscape Architect
$130.00
Engineer 1
$83.00
Engineer II
$94.00
Project Engineer
$105.00
Senior Project Engineer
$125.00
Project Manager
$130.00
Senior Project Manager
$140.00
Principal
$155.00
Expenses
Out-of-pocket direct job expenses
at cost
(reproductions, sub -consultants, equipment rental, etc)
Travel Expenses
Company or Personal Car Mileage IRS rate
Lodging and Subsistence at cost
Billing and Payment
Travel time is charged for work required to be performed out -of -office.
Invoicing is on a monthly basis for work performed. Payment for services is due within
30 days from the date of the invoice. An interest charge of 1.5% per month is made on
the unpaid balance starting 30 days after the date of the invoice.
This schedule of billing rates is effective January 1, 2019 and will remain in effect until
December 31, 2019 unless unforeseen increases in operational costs are encountered.
We reserve the right to change rates to reflect such increases.
Rev. 01/01/19