HomeMy WebLinkAboutChange Order No 1 Wood Sewer & ExcavatingTO: WOOD SEWER &EXCAVATING, INC. CHANGE ORDER #1 (FINAL)DATE: DECEMBER 18, 2019
E9238 CTY RD X
NEW LONDON, WI 54961
Your present contract with the City of Oshkosh, Contract No. 19.20, awarded May 14, 2019, is hereby amended
and changed as follows:
NET INCREASE TO SECTION I: $9,743.79
NET DECREASE TO SECTION I: ($20,302.90)
NET DECREASE TO CONTRACT ($10,559.11)
SECTION I
TOTALS
BID TOTAL $599,814.06
$599,814.06
($10,559.11)
CO #1 ($10,559.11)
CONTRACT TOTAL $539,264.95
$589,254.95
CITY OF OSHKOSH
BY: !Cv
City Man
City Clerk
Appr ad and accepted:
Contractor
Grey L.. VJOod
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order. / f v - -
Com rol r
Approved s oform: n '
City Attorne
P
CONTRACT 19-20 CHANGE ORDER p1 (FINAL)
19-20
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
Removing pavement;
Square
1100
complete asspecified
Yards
834.83
888.47
53.64
$14.90
$799.24
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120 Ispecified
Feet 1
2.579.10
2,651,00
71.90
$5.00
$359.50
7" concrete pavement
removal and replacement;
including sawing; pavement
lies; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
Square
1308
ass specified
Yards
715.47
716.20
0.73
$110.00
$80.30
Adjust manholes and inlets;
1360
complete as specified
Each
1.00
1.00
$1 000.00
Turf restoration; complete as
Square
1370
specified
Yards
1.200.00
1,209.00
9.00
$14.00
$126.00
30" concrete curb and gutter
removal and replacement;
including sawing; pavement
ties; dowel bars; bond
breaker; integral curb and
fine grading; turf restoration;
and traffic control; complete
Linear
1448
asspecified
Feet
20.00
18.00
-2.00
1 $48.00
$96.00
4" concrete sidewalk with 3"
CABC and grading; complete
Square
1500
las specified
Feet
1,586.59
1431.50
-155.09
$11.00
$1,705.00
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
1510
specified
Feet
999.50
1,151.50
152.00
$12.00
$1,824.00
No. 4 reinforcing rods -
deformed; epoxy -coated;
Linear
1550
complete as specified
Feet
370.00
364.00
-6.00
$2.00
$12.00
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
1560
complete as s ecified
Each
192.00
188.00
-4.00
$5.00
$20.00
Sawing existing pavement;
Linear
1700
complete asspecified
Feet
1,590.40
1,761.50
171.10
$4.50
$769.95
4" asphaltic pavement LT
with 10" CABC and grading;
Square
1906
complete asspecified
Yards
830.06
888.47
58.41
$80.00
$4,672.80
Furnish and install 8" storm
Linear
2001
sewer; complete ass specified
Feet
360.00
370.00
10.00
$101.00
$1,010.00
Furnish and install 12" storm
Linear
2003
sewer; complete as specified
Feet
16.00
17.00
1.00
$102.00
$102.00
Furnish and install 15" storm
Linear
2006
sewer; Complete asspecified
Feet
635.00
621.00
-14.00
$110.00
$1,540.00
Furnish and install standard
storm sewer manhole (4'
diameter); complete as
Vertical
2201
specified
Feet
8.80
7.80
-1.00
$490.00
$490.00
Page 1 ol2
R
CONTRACT 19-20 CHANGE ORDER 01 (FINAL)
INCREASEIN
DECREASE IN
ITEM
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
Furnish and install Type 3
Inlet
(with 18" sump);
$2,100.00
2237
complete as s eked
Each
2.00
2.00
Furnish and install 6" storm
sewer lateral; complete as
Linear
1,445.50
-100.50
$119.80
$12,039.90
2400
s ecified
Feet
1,546.00
Furnish and install storm
sewer marker balls; complete
94.00
•6.00
$40.00
$240.00
2404
as s ecified
Each
100.00
Furnish and install storm
sewer clay dams; complete
47.00
-3.00
$90.00
$270.00
2406
asspecified
Each
50.00
Furnish and install storm
sewer lateral inlet; complete
Each
30.00
23.00
-7.00
$500.00
$3,500.00
2408
as specified
Cleanouts; complete as
2418
specified
Each
6.00
6.00
$900.00
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
77.00
-3.00
$110.00
$330.00
2608
specified
Each
80.00
Furnish; install; maintain; and
2516
remove stone bag; complete
ass ecified
Each
46.00
44.00
-2.00
$10.00
$20.00
2800
Abandon 8" -12" storm
sewer; complete as s ecifled
Linear
I Feet
45.00
42.00
.3.00
$13.00
$39.00
Connect to existing storm
sewer main; complete as
2850
specified
Each
1.00
1.00
$760.00
Connect to existing storm
sewer lateral; complete as
2652
specified
Each
3.00
3.00
$100.00
Connect lateral to existing
storm sewer main; complete
2864
asspecified
Each
29.00
29.00
$760.00
Connect to existing storm
sewer manhole; complete as
2856
specified
Each
3,00
3.00
$760.00
Connect to existing storm
sewer inlet; complete as
2858
specified
Each
2.00
2.00
$760.00
Storm sewer utility line
opening (ULO); complete as
2914
s ecified
Each
4.00
4.00
$800.00
Furnish and install external
sanitary sewer manhole
chimney seat; complete as
3114
s ecified
Each
1.00
1.00
$1,900.00
SECTION (BID ITEMS 1100 -3114) - SUBTOTAL: $9,743.79 ($20,302.90)
NET DECREASE SECTION I: ($10,669.11)
NET DECREASE TO CONTRACT: ($10,659.11)
Page 2 or