Loading...
HomeMy WebLinkAbout0107599-PlumbingCITY OF OSHKOSH 107599 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address1120-1180 EMMERS LNOwnerWESTOWNE NORTH PROPERTIES LLCCreate Date04/15/2004 ContractorJT SCHMIDT PLUMBING INCCategoryPlan 440 - Industrial-Interior Bathtub0Shower0Ejector/Grind0Dip Well1F Prep Sink2Gar Drain0 Whirlpool0Floor Drain5Water Softner0Drink Ftn0Serv Sink00 Soda Disp Lavatory40Local Waste0Wait. St.0Shamp Sink01 Lndry TrayCoffee Maker Toilet30Clothes Wshr0Ice Chest0Flr/Wst Sink0 2 Lndry Stndp Int Grease Trap Res. Sink10Bidet0Exam Sink0Catch Basin0 Disposal0 Ext Grease Trap Bar Sink011Wash Ftn0 Beer Tap0Sculry Sink Dishwasher RPZ Valve0 Water Heater102Urinal1 Sump PumpDent. Oper.0Hand Sink 0 Eye Wash Statn Site Drain1000Standp Rec0 Classrm SinkLab Sink0Plaster Sink Roof Drain000Ice Maker1 Breakrm SinkSterilizer0Surgeons Sink Use/Nature of Work RESTUARANT "ASIAN GARDENS" 1160 EMMERS LN SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 $0.00Permit Voided Valuation$19,000.00Plan ApprovalPermit Fees$252.00 Issued ByDate04/21/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner Address419 S WASHINGTON STCOMBINED LOCWI54113-0000Telephone Number788-7314 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.