PURPOSE: APPROVE AMENDMENT TO AGREEMENT FOR FLOW
MONITORING COLLECTION SERVICES FOR 2020 / ADS
ENVIRONMENTAL SERVICES, INC. ($59,985.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City and ADS Environmental Services, Inc. previously entered
into an agreement in which ADS Environmental Services, Inc. would provide the City
with flow monitoring collection services; and
WHEREAS, additional flow monitoring collection services are needed to collect
data during the spring rains;
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the proper City officials are authorized and directed to enter into and take
those steps necessary to implement an appropriate amended agreement with ADS
Environmental Services, Inc. for additional flow monitoring collection services in the
amount of fifty-nine thousand nine hundred eighty-five dollars. ($59,985.00).
Acct. No. 05511920-6450 Engineering & Consulting Fees
CI
City
of
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager/City Engineer
DATE: April 9,2020
RE: Approve Amendment to Agreement for Flow Monitoring Collection Services
for 2020/ADS Environmental Services,Inc. (ADS) ($59,985)
BACKGROUND
An agreement for flow monitoring collection was awarded by the Common Council to ADS on
March 26, 2019.
The past seven years the City has utilized ADS to conduct flow monitoring services to collect
sanitary sewer flow data used to identify areas of high inflow and infiltration of clear water into
the sanitary sewer system. This data is utilized to calibrate and verify the sanitary collection
system model that was developed by Jacobs Engineering Group, Inc. (formerly CH2M Hill).
ANALYSIS
With a combination of the computer virus from earlier this year and the COVID-19 virus
sweeping the globe, bids for this work were not able to be sent out as usual. This work is time
sensitive as we need to collect data during the spring rains. Staff asked ADS to provide costs for
new locations throughout the City.
FISCAL IMPACT
Staff has reviewed the amendment and the proposed costs and has found the costs consistent
with the level of effort that will be expended in order to complete this project. The amount of this
contract amendment is $59,985. This will raise the total agreement amount to $131,983 (not to
exceed). Funds for this project are included in the 2020 Wastewater Utility Operating Budget.
I:\Engineering\I&I Work\Flow Monitoring\2020\ADS CA>1 Memo_4-9-20.doix
Page 1 of 2
RECOMMENDATIONS
I recommend approval of this amendment.
Approved,
Mark A. Rohloff
City Manager
JLG/et
I:\Engineering\I&I Work\Flow Monitoring\2020\ADS CA u1 Memo 4-9-20.docx
Page 2 of 2
RECEIVED
g
APR - 6 2020
Table 1
Proposed Flow Monitoring Locations DEPT O V 1'L)B L I C WORKS
City of OshkoshSanitar Sewer Collection System OSHKOSH, WISCONSIN
Preliminary Flow Pipe Size at Monitoring
Monitor No. Manhole ID Approximate Location Location(inches)**
FM1*** 16-577 Manhole is located on the east side of 54"Fiberglass liner inside
North Campbell Road, RCP(Upstream)
approximately 1,010'northwest of 54"Fiberglass liner inside
Dempsey Trail RCP(Downstream)
FM2*** 12-770 Manhole is located in Sanitary 48"Fiberglass in RCP
Easement for Parcel No. 12-2444- (Upstream)
1400 48"Fiberglass in RCP
(Downstream)
FM3*** 11-910 Manhole is located on the north side 60"HOBAS(Upstream)
of East Parkway Avenue, 60"HOBAS(Downstream)
approximately 63'east of Hazel
Street
FM4*** 16-397 Manhole is located on the east side of 27"RCP(Upstream)
North Campbell Road, 27"Concrete(Downstream)
approximately 650'south of Taft
Avenue
FM5*** 15-2663 Manhole is located on the north side 60"HOBAS(Upstream)
of East New York Avenue in the 60"HOBAS(Downstream)
intersection with Oak Street,11.2'
south of East New York Avenue and
31.3'west of Oak Street
**All pipe sizes should be field verified.
***Flow monitoring period to start as soon as possible. Confirm with Steven Gohde prior to installation. Ninety(90)day minimum
monitorinperiod.
I:\Engineering\I&I Work\Flow Monitoring\2019\Tables 1&L4-2-20.doa Page 1 of 2
TABLE 2
Cost Basis for Amendment
City of Oshkosh Sanitanl Sewer S. stem
Cost per
No.of Cost per Site per
Cost Item No.of Sites Days Site Day Total Cost
Sewer Monitoring Locations
Mobilization 5 N/A $1,125 N/A $5,625
Installation 5 N/A $1,000 N/A $5,000
Monitoring 5 120 N/A $66 $39,600
Demobilization 5 N/A $360 N/A $1,800
Rain Gauge M nitoring Location
Installation 1 N/A $355 N/A $355
Monitoring 1 120 N/A $20 $2,400
Demobilization 1 N/A 205 N/A $205
Documentation
Interim Reports and Final N/A N/A $5,000
Report
Project Total $59,985
1:\Engineering\I&I Work\Flow Monitoring\2019\Tables 1&2 4-2-20.docx Page 2 of 2
FM #1 —Location Map
MH#16-577
LOCATION: East side of North Campbell Road—Approximately 1,010' northwest of Dempsey
Trail
U/S PIPE: 54"Fiberglass liner inside of a RCP pipe (Southeast)
D/S PIPE: 54"Fiberglass liner inside of a RCP pipe (South)
S
MH 16577
VIC
•ti
7
11,2.
F��� �^• t�'.:- ��",�s -ram �' � �
FM #2—Location Map
MH#12-770
LOCATION: Sanitary Easement in Parcel No. 12-2444-1400 (west of 1500 Arboretum Drive)
U/S PIPE: 48"Fiberglass in RCP (Southwest)
D/S PIPE: 48"Fiberglass in RCP (South)
f Q `
t� '�•'M� ems . +•.` t.. �.
MtSC�
� . MH 12-770 F-�1�,"$?o
19
f.
L � �' ^ � Tye. L•
.'_� ,' ,. $ _ _'� .�i� .,tea .:^. �.:• .�_.._d,rr., .�yri'�'`�. ,. `ts
FM #3 —Location Map
MH#11-910
LOCATION:North side of East Parkway Avenue -Approximately 63' east of Hazel Street
U/S PIPE: 60"HOBAS (South)
D/S PIPE: 60"HOBAS (Southwest)
v.r•T%
MH11.910.
jam' r� ,•1 f '" afN �
�� ✓
IL �• .ti =•Q �28 � .c
1 .JftrARKWAYAVY,,
i�
is �d _ - y'j �; - ■ r
FM #4 — Location Map
MH#16-397
LOCATION: East side of North Campbell Rd—Approximately 650' south of Taft Avenue
U/S PIPE: 27"RCP (Southeast)
D/S PIPE: 27" Concrete (Southeast)
}
MH 16 397 (, f
a
<2
1 1 1
• : •
.1 • : •
�, ,� ;s ,y.� a �, y� ._�t t "k• �:
ATM
ba
a"
Y4. fr_'� .9f l..t .Y�• 14� ��.' c�'K '�f
$ ..t t" Yam•" �.r ti � � �, t
a M }
m �• to
S1 a 'ii' �• -
� YY. J�•. t � yr �ti� YY°