HomeMy WebLinkAbout23. 20-163 APRIL 14, 2020 20-163 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS NO. 19- 01 WEST WAUKAU AVENUE GALLUPS-MERRITTS CREEK CROSSING RECONSTRUCTION HIGHWAY LANDSCAPERS, INC. ($21,365.16) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: HIGHWAY LANDSCAPERS, INC. PO Box 618 Kaukauna WI, 54130 Net Increase to Contract: ($21,365.16) PURPOSE: See attached Change Order. Acct. Nos. 03110410-7480 Sidewalk Construction Fund Expenditures 03170410-7480-03304 Special Assessments Fund — Sidewalks 03150410-7480 Street Improvement Fund Expenditures 03170410-7480-03301 Special Assessments Fund — Streets 03170410-7480-03303 Special Assessments Fund —Water 03170410-7480-03302 Special Assessments Fund — Sewer 03170410-7480-03305 Special Assessments Fund — Storm Sewer 03210410-6804-04901 Contract Control— Storm Sewer 03210410-6802-04901 Contract Control— Sanitary Sewer 03210410-6803-04901 Contract Control—Water Main 0 City of Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager/City Engineer DATE: April 9,2020 RE: Change Order No. 1 for Public Works Contract No. 19-01 West Waukau Avenue Gallups-Merritts Creek Crossing Reconstruction Highway Landscapers, Inc. ($21,365.16) BACKGROUND Change Order No. 1 for Contract 19-01 is scheduled for consideration by the Common Council at the April 14, 2020 meeting. The contract was originally awarded to Highway Landscapers, Inc. in September of 2018. ANALYSIS This change order is for adjusting final quantities to match field conditions. FISCAL IMPACT Estimated Total Contract Section Change Order Amount Construction Costs CIP Budget Amount Storm Sewer $27,406.91 $908,094.20 $919,000 Sanitary Sewer -$3,844.75 $107,184.54 $140,000 Water Main -$2,197.00 $134,774.64 $180,000 Total $21,365.16 $1,150,053.38 $1,239,000 Adequate funds are available in the relating sections of the 2019 Capital Improvement Budget. I:\Engineering\2019 CONTRACTS\19-01 W Waukau Gallops Page 1 of 2 Crk\Project Information\Correspondence\Memo\19-01 Memo for CO#1_4-9-20.docx RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 19-01 in the amount of$21,365.16 to Highway Landscapers, Inc. Approved: l�Mark A. Rohloff City Manager J[.G/ec I:\Engineering\2019 CONTRACTS\19-01 W Waukau Gallups Page 2 of 2 Crk\Project Information\Correspondence\Memo\19-01 Memo for CO 41 4-9-20.docx TO: HIGHWAY LANDSCAPERS CHANGE ORDER#1 (FINAL): 1900 BOHM DRIVE DATE: MARCH 2, 2020 LITTLE CHUTE, WI 54140 Your present contract with the City of Oshkosh, Contract No. 19-01, awarded August 27, 2019, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($8,647.58) NET DECREASE TO ALTERNATE: ($1,602.00) NET INCREASE TO ADDITIONAL WORK: $31,614.74 NET INCREASE TO CONTRACT $21,365.16 TOTALS BID TOTAL $940,235.77 $940,235.77 CO# $21,365.16 $21,365.16 CONTRACT TOTAL $961,600.93 $961,600.93 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 19-01 CHANGE ORDER#1 (FINAL) 19-01 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Mobilization;complete as Lump 1050 specified Sum 1.00 1.00 $90,000.00 Removing concrete and asphalt sidewalk and driveway, complete as Square 1120 specified Feet 1,363.00 1.403.00 40.00 $5.00 $200.00 8"concrete pavement removal and replacement; including sawing; pavement ties;dowel bars; bond breaker; integral curb and fine grading;turf restoration; and traffic control;complete Square 1318 asspecified Yards 1,100.00 1.118.50 18.50 $78.88 $1,459.28 Adjust manholes and inlets; 1360 complete as specified Each 15.00 9.00 -6.00 $355.00 $2,130.00 Turf restoration; complete as Square 1370 specified Yards 560.00 447.50 -112.50 $14.00 $1,575.00 Cold weather covering (concrete pavement)-single visquine; complete as Square 1380 specified Yards 1,100.00 1,118.50 18.50 $0.01 $0.19 Cold weather covering (concrete pavement)-double visquine;complete as Square 1382 specified Yards 1,100.00 0.00 -1,100.00 $0.01 $11.00 Cold weather covering (concrete pavement)-double visquine with 6"hay; Square 1384 complete asspecified Yards 1,100.00 0.00 -1,100.00 $0.01 $11.00 Up-charge for late season cold weather concrete pavement; complete as Cubic 1390 specified Yards 200.00 253.40 53.40 $15.00 $801.00 6"concrete sidewalk/ driveway/ramp with 3"CABC and grading;complete as Square 1510 specified Feet 1,409.00 1,056.00 -353.00 $8.50 $3,000.50 Cold weather covering (sidewalk)-single visquine; Square 1580 complete asspecified Feet 1,409.00 1,056.00 -353.00 $0.01 $3.53 Cold weather covering (sidewalk)-double visquine; Square 1582 complete asspecified Feet 1,409.00 0.00 -1,409.00 $0.01 $14.09 Cold weather covering (sidewalk)-double visquine with 6"hay; complete as Square 1584 specified Feet 1,409.00 0.00 -1,409.00 $0.01 $14.09 Up-charge for late season cold weather concrete sidewalk;complete as Cubic 1590 specified Yards 20.00 176.00 156.00 1 $15.00 $2,340.00 4"asphaltic pavement LT with 10"CABC and grading; Square 1906 complete as specified Yards 27.00 34.70 7.70 $200.00 $1,540.00 Pavement markings;epoxy; 4"(white);complete as Linear 1974 specified Feet 500.00 0.00 -500.00 $5.00 $2,500.00 Page 1 of 5 CONTRACT 19-01 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Pavement markings;epoxy; 4"(yellow);complete as Linear 1975 specified Feet 500.00 0.00 -500.00 $5.00 $2,500.00 Furnish and install 12"RCP Class V storm sewer; Linear 2005 complete asspecified Feet 89.00 93.40 4.40 $95.00 $418.00 Furnish and install 15"RCP Class V storm sewer; Linear 2008 complete as specified Feet 53.00 53.00 $105.00 Furnish and install 27"RCP Class V storm sewer; Linear 2020 complete asspecified Feet 108.00 100.00 -8.00 $155.00 $1,240.00 Furnish and install 36"RCP Class V storm sewer; Linear 2026 complete asspecified Feet 9.00 9.50 0.50 $325.00 $162.50 Furnish and install standard storm sewer manhole(5' diameter);complete as Vertical 2202 specified Feet 6.50 5.22 -1.28 $725.00 $928.00 Furnish and install standard storm sewer inlet manhole(5' diameter);complete as Vertical 2214 specified Feet 7.50 5.87 -1.63 $725.00 $1,181.75 Furnish and install Type 1 2236 inlet; complete as specified Each 1.00 1.00 $2,200.00 Furnish and install Type 3 2238 inlet; complete as specified Each 3.00 3.00 $2,400.00 Furnish; install; maintain; and remove Type D inlet protection;complete as 2506 specified Each 6.00 8.00 2.00 $150.00 $300.00 Furnish; install; maintain;and remove silt fence;complete Linear 2514 asspecified Feet 672.00 427.00 -245.00 $3.00 $735.00 Furnish; install, maintain;and remove turbidity barrier; 2526 complete asspecified Each 1.00 0.00 -1.00 $6,500.00 $6,500.00 Furnish and install turf grass; Square 2620 complete asspecified Yards 240.00 240.00 $10.00 Furnish and install Class I; Urban;Type A erosion control mat; complete as Square 2632 specified Yards 240.00 240.00 $2.00 Furnish and install medium rip-rap with filter fabric; Square 2648 complete asspecified Yards 60.00 214.00 154.00 $45.00 $6,930.00 Remove 30"and smaller storm sewer; complete as Linear 2804 specified Feet 292.00 292.00 $25.00 Remove storm sewer manholes and inlets; 2812 complete asspecified Each 6.00 6.00 $250.00 Connect to existing storm sewer main;complete as 2850 specified Each 1.00 1.00 $1,200.00 Connect to existing storm sewer manhole;complete as 2856 specified Each 1.00 1.00 $1,200.00 Remove old structure STA Lump 2972 34+81; complete asspecified Sum 1.00 1.00 $15,000.00 Page 2 of 5 CONTRACT 19-01 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Excavation for structure culverts B-70-325;complete Lump 2974 asspecified Sum 1.00 1.00 $10,500.00 Backfill structure Type A; 2976 complete asspecified Tons 940.00 874.64 -65.36 $24.00 $1,568.64 Breaker run;complete as 2978 specified Tons 192.00 254.04 62.04 $20.00 $1,240.80 Protective surface treatment; Square 2979 complete asspecified Yards 24.00 24.00 $20.00 Adhesive anchors-No.4 2980 bars; complete as specified Each 10.00 10.00 $25.00 Concrete masonry culverts; Cubic 2982 complete asspecified Yards 234.00 242.00 8.00 $695.00 $5,560.00 High-strength bar steel reinforcement-structures; 2984 complete asspecified Pounds 24,350.00 24,350.00 $2.00 Coated high-strength bar steel reinforcement- structures;complete as 2986 specified Pounds 5,180.00 5,180.00 $2.25 Railing steel-Type NY4; Linear 2988 complete asspecified Feet 128.00 128.00 $225.00 Rubberized membrane waterproofing;complete as Square 2990 specified Yards 13.00 13.00 $50.00 Pipe underdrain;wrapped- six inch(6");complete as Linear 2992 specified Feet 124.00 124.00 $15.00 Geotextile fabric-Type C; Square 2994 complete asspecified Yards 400.00 400.00 $4.50 Temporary water diversion; Lump 2996 complete asspecified Sum 1.00 1.00 $45,000.00 Furnish and install 10" sanitary sewer(new); Linear 3032 complete as specified Feet 249.00 247.00 -2.00 $145.00 $290.00 Furnish and install standard sanitary sewer manhole(4' diameter);complete as Vertical 3100 specified Feet 34.00 30.99 -3.01 $725.00 $2,182.25 Furnish and install 10"x 6" sanitary sewer factory wyes or tees; complete as 3212 Ispecified Each 2.00 2.00 $1,000.00 Furnish and install 4"/6" sanitary sewer lateral(relay); Linear 3234 complete asspecified Feet 80.00 60.50 -19.50 $85.00 $1,657.50 Furnish and install sanitary sewer lateral marker balls; 3236 complete asspecified Each 4.00 5.00 1.00 $100.00 $100.00 Furnish and install clay 3238 dams; complete asspecified Each 2.00 2.00 $500.00 Furnish and install connection to existing 8" sanitary sewer mains; 3300 complete as specified Each 1.00 1.00 $1,500.00 Page 3 of 5 CONTRACT 19-01 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 18" sanitary sewer open cut casing pipes; complete as Linear 3410 specified Feet 49.00 50.00 1.00 $185.00 $185.00 Closed circuit televising; Linear 3700 complete as specified Feet 245.00 245.00 $6.00 Remove sanitary sewer manholes;complete as 3852 specified Each 2.00 2.00 $800.00 Remove sanitary sewer; Linear 3854 complete asspecified Feet 207.00 207.00 $30.00 Furnish and install 12"ductile iron water main(relay)with polywrap; complete as Linear 4008 specified Feet 43.00 39.00 -4.00 $150.00 $600.00 Furnish and install 16"ductile iron water main(relay)with polywrap; complete as Linear 4010 specified Feet 135.00 130.00 -5.00 $175.00 $875.00 Furnish and install 16"ductile iron water main(relay)with polywrap and TR Flex restrained joints; complete as Linear 4011 specified Feet 60.00 60.00 $225.00 Furnish and install 1"water service(relay); complete as Linear 4036 specified Feet 45.00 39.00 -6.00 $92.00 $552.00 Furnish and install 1" corporation and stop box; 4048 complete as specified Each 1.00 1.00 $850.00 Furnish and install connections to existing 12" water main;complete as 4064 specified Each 2.00 2.00 $1,500.00 Furnish and install 12"45 degree water main bend; 4239 complete asspecified Each 4.00 4.00 $1,450.00 Furnish and install 16"45 degree water main bend; 4240 complete as specified Each 4.00 4.00 $2,750.00 Furnish and install 16"x 12" water main reducer;complete 4276 asspecified Each 2.00 2.00 $1,850.00 Furnish and install 12"water main gate valve; complete as 4404 specified Each 2.00 2.00 $5,500.00 Furnish and install 16"water main gate valve, complete as 4405 specified Each 2.00 2.00 $9,500.00 Furnish and install 24"water main casing pipe; complete Linear 4730 asspecified Feet 49.00 50.00 1.00 $185.00 $185.00 Abandon water main on West Waukau Avenue; complete Lump 4900 as specified Sum 1.00 1.00 $6,500.00 SECTION I(ITEMS 1050-4900)-SUBTOTAL: $21,421,77 ($30,069.35) NET DECREASE TO SECTION I: ($8,647.58) Page 4 of 5 CONTRACT 19-01 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE ALTERNATE ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Unclassified excavation; Cubic 1200-1 complete asspecified Yards 450.00 450.00 $10.00 Furnish and install turf grass; Square 2620-1 complete asspecified Yards 230.00 196.00 -34.00 $12.00 $408.00 Furnish and install no-mow Square 2611-1 fescue;com fete asspecified Yards 775.00 684.00 -91.00 $12.00 $1,092.00 Furnish and install Class I; Urban;Type A erosion control mat;complete as Square 2632-1 specified Yards 230.00 196.00 -34.00 $3.00 $102.00 Furnish and install concrete- ties block for channel lining; Square 2970-1 complete asspecified Yards 775.00 775.00 $76.00 ALTERNATE-(BID ITEMS 1200-1 -2970-1)-SUBTOTAL: $0.00 ($1,602.00) NET DECREASE TO ALTERNATE: ($1,602.00) ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Tree and stump removal; 1-20000 complete as specified Each 0.00 2.00 2.00 $5,000.00 $10,000.00 Additional rebar for box culvert due to error in plan; Lump 1-20001 complete asspecified Sum 0.00 1.001 1.00 $300.00 $300.00 Repair and replace railing; Lump 1-20002 complete as specified Sum 0.00 1.00 1.00 $4.305.00 $4,305.00 Fabricate;galvanize; and install steel grate for the 36" Lump 1-20003pipe;complete as specified Sum 0.00 1.00 1.00 $1,950.00 $1,950.00 Excavate frozen road subgrade and backfill with 1 1/4"base aggregate; Lump 1-20004 complete asspecified Sum 0.00 1.00 1.00 $13,400.74 $13,400.74 Time and materials to construct the box culvert during the cold weather cure Lump 1-20005 period; complete as specified Sum 0.00 1.00 1.00 $1,659.00 $1,659.00 ADDITIONAL WORK REQUIRED CO#1 (ITEMS 1-20000-1-20005)-SUBTOTAL: $31,614.74 $0.00 NET INCREASE TO ADDITIONAL WORK: $31,614.74 NET DECREASE TO SECTION 1 ($8,647.58) NET DECREASE TO ALTERNATE ($1,602.00) NET INCREASE TO ADDITIONAL WORK $31,614.74 NET INCREASE TO CONTRACT: $21,365.16 Page 5 of 5