Loading...
HomeMy WebLinkAbout0107025-Building (shed)OSHKOSH ON THE WATER .lob Address 2281 GOLDEN AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner GENE M/SHIRLEYSCHMIEDEL Contractor OWNER Category 151 - New Utility Buildings-Sheds (Residential) No 107025 Create Date 03/23/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size 8'x12' Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Constructing a 8'xl 2' storage shed in the rear yard. The storage shed will be constructed on a treated wood base that will be properly of Work anchored to the ground to resist wind up-lift. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $900.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 03/23/2004 Final/O.P. 00/00/0000 Parcel Id # 0617990000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2281 GOLDEN AVE Agent/Owner OSHKOSH WI 54904 - 7921 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPUANCE CHECKUST PROPER~CONTRACTOR: CONSTRUCTION DATA: ~ New Construction · TYPE OF CONSTRUCTION: (i.e. fence, pool, paddng lot, sign, etc.) ZONING.,,'~- \ Addition Alteration COMPLIANCE CHECKLIST DEFICIENT 'COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. "~APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEW'ED BY: ~