Loading...
HomeMy WebLinkAbout0107498-Building (patio door) � CITY OF OSHKOSH N No 107498 � �OSHKOSH BUILDING PERMIT -APPLICATION AND RECO .��'� ON THE WATER � �k, OP Job Address 910 COZY LN Owner DAVID R SCOTT Ce Date 04/19/2004 Designer Contractor STANLEY LEACH-BUILDER Category 141 -Exterior Remodeling Plan Type � Building _ � Sign � Canopy � Fence � Raze j Zoning C�ass of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection i Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garege 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post 0 Treated Wood Occupancy Permit Not Required Flood Plain Height Permit : Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature FR/Installing a 12'patio door in the gable end wall. A code compliant header will be installed to carry all loads imposed. of Work i � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date 04/19/2004 Final/O.P. 00/00/0000 � Permit Voided � Parcel Id# 1519627300 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary app ovals before starting such activity. Signature Date / ljl� AgenUOwner � Address 5099 SHERMAN RD OSHKOSH WI 54901 - 9755 Telephone Number 235-2530 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.