Loading...
HomeMy WebLinkAbout27. 20-127 MARCH 24, 2020 20-127 RESOLUTION (CARRIED 6-1 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 WITH LINNCO FOR ADDITIONAL DEMOLITION IN THE EAST 700 BLOCK OF SOUTH MAIN STREET (+$242,100); APPROVE AMENDMENT TO PROFESSIONAL SERVICE AGREEMENT WITH AECOM FOR DEMOLITION MANAGEMENT AND ENVIRONMENTAL ISSUES IN THE EAST 700 BLOCK OF SOUTH MAIN STREET (+$40,820); APPROVE BUDGET AMENDMENT INITIATED BY: DEPARTMENT OF COMMUNITY DEVELOPMENT WHEREAS, the Redevelopment Authority has recently acquired 706 S. Main Street; and WHEREAS,a change order for additional demolition in the East 700 Block of South Main Street will allow for the contractor to remain on site to continue demolition; and WHEREAS, an amendment to AECOM's professional service agreement is necessary for the additional demolition management and environmental management in the E. 700 Block of South Main Street. NOW THEREFORE BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change order is hereby approved and the proper City officials are authorized to execute any and all documents necessary for purposes of same. LINNCO, INC. 2 SECOND AVE S, #160 SAUK RAPIDS, MN 56379 Net Increase to Contract: + $242,100 PURPOSE: Additional Demolition E. 700 Block South Main Street MARCH 24, 2020 20-127 RESOLUTION CONT'D BE IT FURTHER RESOLVED that in order to permit the project to be completed in a timely manner and on schedule, the City Manager, or his designee, is hereby authorized to approve future change orders in an amount not to exceed the available contingency funds. BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that an amendment to the professional service agreement with AECOM is hereby approved to provide demolition management and environmental management in the amount of $40,820 and the proper City officials are authorized and directed to enter into an appropriate agreement for purposes of same and to take those steps necessary to implement the terms and conditions of the agreement as amended. BE IT FURTHER RESOLVED that the following 2019 Capital Improvements Budgets are hereby amended to fund said change order and professional service agreement amendment: 0534-1040-7216-67904 $2,000 2019 CIP 1 E. 81h Ave Remediation BE IT FURTHER RESLOVED that money for this purpose is hereby appropriated from: Acct. No. 0534-1040-7216-67904 TID #20 South Shore Redevelopment $2,000 Acct. No. 0534-1040-7216-67907 TID #20 South Shore Redevelopment $3,000 Acct. No. 0534-1040-7216-67004 TID #20 South Shore Redevelopment $103,700 Acct. No. 0323-0740-6401-63020 2020 Blight Removal Scattered Site $174,230 �E , City f Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Allen Davis, Community Development Director DATE: March 18, 2020 RE: Approve Change Order No. 1 with LinnCo for additional Demolition in the East 700 Block of South Main Street ($242,100); Approve Amendment to Professional Service Agreement with AECOM for Demolition Management and Environmental Issues in the East Block of South Main Street (+$40,820) Approve Budget Amendment BACKGROUND The City has acquired 706 South Main Street recently as was consistent with the Southshore Redevelopment Plan and TIF #20. Phase 1 Environmental Site Assessments (ESA) have been completed. The demolition of the structures by LinnCo must be completed in order to perform Phase 2 Environmental testing by AECOM. All these efforts are in anticipation of issuing a Request for Proposals (RFP) for the redevelopment of this area in the near future. ANALYSIS The proposed demolition contract change order will remove the building and any hard surfaces on the property. This will also remove the underground storage tanks uncovered during the demolition process. Available materials will be recycled, including the concrete and asphalt which will be crushed and reused for back fill as needed, and stockpiled for future use on 9t'' Ave and/or the Pioneer Drive riverwalk. The contract also requires the grading, top soil and seed and hydro mulch so that the site will be development ready and attractive. FISCAL IMPACT Cost savings from the 2019 CIP Rec Lanes funding to hire a structural engineer were not needed since acquiring 706 S Main St. Those funds were used for the acquisition of 706 S. Main and can be used for the additional demolition. The funding for the demolition project is available in the CIP from TIF #20 funds for demolition of the surrounding buildings ($108,000) and Scattered Sites ($174,920). City Hall,215 Church Avenue P.O.Box 1 130 Oshkosh,WI 54903-1 130 920.236.5000 http://www.ci.oshkosh.wi.us RECOMMENDATION Approve Change Order No. 1 with LinnCo for additional Demolition in the East 700 Block of South Main Street ($242,100); Approve Amendment to Professional Service Agreement with AECOM for Demolition Management and Environmental Issues in the East Block of South Main Street (+$40,820) Approve Budget Amendment. Submitted, Approved: 49 r v J ,- Allen Davis Mark A. Rohloff Community Development Director City Manager City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1 130 920.236.5000 http://www.ci.oshkosh.wi.us CHANGE ORDER NO. 1 TO: LinnCo Inc. Date: March 18,2020 Your present Contract-Sawdust District Demolition with the City of Oshkosh for the demolition of various structures is hereby amended and changed as follows: CB-1 UST Impacted Soil Disposal T&M Est.400 Tons Not to Exceed $ 8,100.00 CB-2 Unknown Concrete Structures Not To Exceed $ 67,600.00 CB-3 Luecks Home Improvement Demolition Lump Sum $ 166,400.00 Subtotal Increase $ 242,100.00 Original Award Contract Amount $467,714.50 Net Change Increase C.O.#1 $242,100.00 Revised Contract Amount $709,814.50 CITY OF OSHKOSH APPROVED AND ACCEPTED: City Manager LinnCo Inc. City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,under the within Change Order. Finance Director Russ Van Gompel Approved as to form: Lynn Lorenson,City Attorney fy's Construction Bulletin A;'Os' hkosh. Bulletin No CB-1 Date 3/18/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Fuel Oil Subsurface Impacted Soil Emergency Clean up at 43 E.7th Avenue Potential Fuel Oil Subsurface Clean up at 706 S. Main Street Reason for Modification(s) An underground fuel oil tank assumed to have been used for suppling a heating system was discovered during demolition of the office building at 43 E. 7th Avenue. The steel tank had several holes in it, and fuel oil apparently leaked into the subsurface. The tank was properly decommissioned but the soil surrounding the tank appeared to be severely impacted with fuel oil. AECOM recommended removal of the impacted material to limit future liability. LinnCo provided an estimate to load and transport 200 tons of impacted material to Waste Management's Valley Trail Landfill, Berlin Wisconsin. In addition, there is a potential for a fuel oil tank associated subsurface clean up with the Luecks Facility. This budget includes and estimated 200 tons for this potential cleanup also. AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs.Time and Materials Not-to-Exceed$8,100.00. Attachments(List Supporting Documents) LinnCo Inc. quote dated March 4,2020 Change Order 1. Budget was doubled to account for Luecks possible fuel oil tank Owner Contractor Engineer Recommendation By By By Date Date Date UnnCo, Inc. LINNCO 2-2nd Avenue South Suite#160 Sauk Rapids, MN 56379 Phone(320)272-8288 Change Order Request# 1 Date: March 4, 2020 To: Paul Timm -AECOM RE: Excavate,load and transport C-soils PER LOAD 200 ton estimated volume 18.2 ton hauled per load 10.99 loads to landfill 0.33 crew hours per load Fltem _� � �=w �HrslUnt �Rate y - Tot,�t Equipment Volvo 300 Exc-Demo Package 3.66 $ 204.00 $ 747.25 Kubota SSV75 3.66 $ 55.00 $ 201.47 Pickup 3.66 $ 25.00 $ 91.58 Total Equipment $ 1,040.29 Labor Foreman-Operator 3.66 $ 112.00 $ 410.26 Laborer 3.66 $ 95.00 $ 347.99 Total Labor $ 758.24 Subcontractors/Materials ITO hauling per hour(Soper) 19.2 $ 100.00 $ 1,923.08 105 minute RT with load/dump $ - $ - Materials-Cost plus 15% 1,923.08 $ 288.46 Total Subs/Mat'Is $ 2,211.54 Misc lump sum pricing Total Misc lump sum $ - Bond 0.0% 4,010.07 $ - Total Bond $ - Grand Total $ 4,010.07 Notes: We have priced the load out assuming our crew is working onsite. :i TY Construction Bulletin h. Bulletin No CB-2 Date 3/18/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Unanticipated and Buried Concrete Structures Encountered and Warning Fabric Permit Requirement Reason for Modification(s) Unknown Concrete Floor Slab/Gas Line and Valve During demolition of 43 E. 7'h Avenue buildings, a second layer of concrete floor slab was encountered under the building floor slab. This concrete slab was approximately 8"thick and reinforced. In addition, a 8"diameter natural gas line and valve was identified. This gas line and valve had to be investigated in an effort to determine if it was decommissioned. This slab and gas line/valve were not apparent or anticipated during the bidding process. Unknown Former Foundry Machine Foundations During demolition of 43 E. 7t'Avenue buildings, a second layer of concrete floor slab was encountered under the building floor slab. Under this second layer of concrete several massive historic foundry machine foundations were encountered. These foundations were not apparent or anticipated during the bidding process. Warning Fabric As required by the Beneficial Reuse of Crushed Lead Impacted Concrete permit,a layer of fabric is required to be placed on top of the material and under the topsoil. This permit requirement was not part of the bidding documents. AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs.The approved budget is on a time and materials basis in the amount of$67,600.00. Attachments (List Supporting Documents) LinnCo Inc. Quote dated March 18, 2020 Owner Contractor Engineer Recommendation By By By Date Date Date LinnCo, Inc, LINNCO 2-2nd Avenue South Suite#160 Sauk Rapids,MN 56379 h 0 27 -8 Phone 32 2 288 eOrder III Chang Request# 2 Date: March 16, 2020 To: Paul Timm -AECOM RE: Buried Items discovered through 3116120 See attached for Item breakdown Equipment Volvo 300 Exc-Demo Package 104.46 $ 204,00 $21,309.77 Kubota SSV75 79.15 $ 55.00 $ 4,353.04 Dozer 17.68 $ 91.00 $ 1,608.51 Wacker Smooth Drum Compactor 28.43 $ 56.00 $ 1,592.26 Genesis LXP 25.31 $ 105.00 $ 2,657.91 Pickup 104.46 $ 25.00 $ 2,611.49 Total Equipment $ 34,132,98 Labor Foreman-Operator 122.14 $ 112.00 $ 13,679.18 Laborer 107.58 $ 95.00 $ 10,220.04 Total Labor $ 23,899.22 Subcontractors/Materials Subcontractor Loader/Operator 69.9 $ 106.00 $ 7,410.49 Materials-Cost plus 15% 7,410.49 $ 1,111.57 Total Subs/Mat'Is $ 8,622.07 Misc lump sum pricing Total Misc lump sum $ - Bond 1.5% 66,554.27 $ 998.31 Total Bond $ 998,31 Grand Total $ 67,652,68 Notes: Pricing assumes utilizing same crushed concrete materials referenced as backfill in docu Unknown items left to address that require more Investigation before we can price: Add1 unknown footings-Foundry and under North Building Gas Line beneath slab Fabric over crushed concrete C-soil removals and backfill - t C i E i, i I Unknown UST-Discovery/Stabilize situation-Load out of C-Soils and Backfill is not included Removal/Poly Excavator EXC/Process Skidsteer Loader Dozer Roller Time Involved 1.0 1.0 Materials Utilized Poly Backfill Volume to be determined once C-soils are removed Excavator Exc/Process Skidsteer Loader Dozer Roller Total cy CV Excavator Exc/Process Skidsteer Loader Dozer Roller 1.0 0.0 1.0 0.0 0.0 0.0 2 Unknown Basement near SE loading dock 16 ftwids 38 ft long 6 ft deep 1 It thick floor slab Removal Volumes Excavator EXdProcessorSkfdsteer Loader Dozer Roller Rubble/Dirt Fill 135 cy CV 40 3.4 3.4 u 5.4 Frost Walls 24 cy CV is 2 4 is 1.3 2.4 25 1.0 Footings 12 cy CV 20 1.2 is 0.7 1.2 2e 0.5 Floor Slab 23 cy CV 10 2.3 is 1.3 2.3 zs 0.9 Totals 194 cy CV Backfill Volume Excavator Exc/Processor Sk dsteer Loader Dozer Roller Total 194 cy CV 5.0 38s 5.0 5_0 Excavator Exc/Process Skidsteer Loader Dozer Roller 9.2 3.3 14.3 12-8 0.0 5.0 i 3 Unknown 8"slab beneath surface slab 27,424 sf 0.67 thickness Removal Volumes Excavator Exc/ProcessorSkdsteer Loader Dozer Roller Floor Slab 681 cy CV 12.5 54.4 10.0 54.4 25 27.2 Totals 681 cy CV Backfill Volume Excavator ExclProcessor Skidsteer Loader Dozer Roller Total 681 cy CV ass 17.7 17.7 17.7 Excavator Exc/Process Skidsteer Loader Dozer Roller 54.4 10.0 54.4 44.9 17.7 17.7 4 Unknown 54"tall pyramid piers with 5'x5'x2.5'thick pads along with buried foundation; 14 Pyramids 2375 4.5 3.5 14 Pads 5 5 2s 1 Beam 76 is 0.667 1 Beam 19 1s 1.000 1 Box Wall 62 4 1-000 1 Box Slab 10 21 1.000 Removal Volumes Excavator ExclProcessor Skidsteer Loader Dozer Roller Pyramids 19 cy CV 10 1.9 12 1.6 1.9 25 0.8 25 0.0 Pads 32 cy CV 10 32 22 2.7 3.2 2s 1.3 2s 0.0 Poured Beam 1 3 cy CV 10 0.3 12 0.2 0.3 2s 0.1 25 0.0 Poured Beam 2 1 cy CV 10 0.1 12 0.1 0.1 z5 0.0 2s 0.0 Box Walls 9 cy CV 10 0.9 12 0.8 0.9 25 0.4 25 0.0 Floor Slab 8 cy CV 10 0.8 12 0.6 0.8 25 0.3 2s 0.0 Totals 73 cy CV Backfill Volume Excavator Exc/ProeessorSkidsteer Loader Dozer Roller Removal Voids 73 cy CV Cube Vold 31 cy CV Total 104 cy CV 2.7 38.5 2.7 2.7 Excavator Exc/Process Skidsteer Loader Dozer Roller 7.3 6.1 10.0 5.6 0.0 2.7 i i i I i i 5 Unknown Southside Foundry Footing 1 Frost Wails 1.00' 1391 4 1 1 Frost Walls 0.6T 31 4 0.67 1 Foundations 1 76 3 4.000 1 Foundations 2 47 6 0.670 1 Floor Slab z3as 1 1-000 Removal Volumes Excavator Exc/ProcessorSkidsteer Loader Dozer Roller Frost Walls 1.00' 21 cy CV 10 2.1 1z 1.7 2.1 .20 1.0 20 0.0 Frost Walls 0.6T 3 cy CV 10 0.3 iz 0.3 0.3 20 0.2 20 0.0 Foundations 1 34 cy CV 10 3.4 12 28 3.4 20 1.7 20 0.0 Foundations 2 6 cy CV io 0.6 12 0.5 0.6 20 0.3 20 0.0 Floor Slab 9 cy CV 10 0.9 12 0.7 0.9 20 0.4 20 0.0 Totals 72 cy CV Backfill Volume Excavator ExclProcessorSkidsteer Loader Dozer Roller Removal Voids 72 cy CV Cube Void 45 cy CV Total 117 cy CV 3.0 38s 3.0 3.0 Excavator Exc/Process Skidsteer Loader Dozer Roller 7.2 6.0 10.2 6.6 0.0 3.0 Excavator Exc/ProcesSkidsteer Loader Dozer Roller Total Hours for Above Item 79.1 25.3 89.9 69.9 17.7 28.4 fl } 1 t 1 { � 7 i i `��RUMZS PIR -.. HE -'� � � a „�� ,� '� `�y'��"`�-,_;�ski �,• 4 '� el t zu- r x s g 3 Construction Bulletin WOS' hkosh Bulletin No CB-3 Date 3/5/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Addition of Lueck's Home Improvement, 706 S. Main Street, Oshkosh Wisconsin. An approximate 12,000 square foot building with an asphalt paved parking lot. I Reason for Modification(s) This facility is part of the Sawdust District Redevelopment area. All the surrounding buildings are already included in the demolition contract. AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs.The approved budget is on a time and materials basis in the amount of$167,000.00. Attachments (List Supporting Documents) LinnCo Inc. quote dated March 18, 2020. Owner Contractor Engineer Recommendation By By By Date Date Date i Proposal INNL Avenue S, Inc. 2 -2nd Avenue S#160 Sauk Rapids, MN 56379 Phone(320)272-8288 Submitted to Job Name Name Paul Timm Name Leucks Building Demolition Attn: AECOM Address 558 N Main Street Address City,State,Zip Oshkosh,WI 54901 City,State,Zip Phone: 920-235-0321 Cell: Bid Date: Time Due: Date: 3/18/2020 Description Complete demolition of the former Luecks Building in Oshkosh,WI. Included: Temporary fence 600 If Erosion Control-Compost Logs 485 If Disconnect one water service at building foundation Disconnect one sewer service at building foundation Complete above grade demolition of structure Note 2,300 sf of exterior brick walls can not be recycled due to lead paint. All other masonry,brick and concrete will be put in owners stockpile next to jobsite LinnCo to work off of the asbestos abatement contractors notification Permits by Owner All roofing debris is assumed to be asbestos containing. All non recycle debris will be landfilled. Partial wood floor on warehouse to be landfilled. Concrete was noted below slab Complete below grade demolition Note West foundation wall to be broke off below grade yet left in place to limit sidewalk/road damages A crawlspace was noted below a portion of the building. Backfill footing voids and crawlspace with Owners crushed stockpiled materials adjacent to jobsite as noted in original bidding documents. Note Some backfill materials are noted in raised warehouse floor. This material figured for reuse. Excluded: Fabric above Owners crushed backfill materials. Topsoil/seed/restoration Note This will be completed at similar rates to other areas in original bid Universal/regulated wastes Examples Bulbs/ballasts/chemicals/freon/etc... TOTAL PRICE: $ 166,337.00 Prepared by-Nick Linnemann,President Accepted by(Signature) LinnCo,Inc. 3/18/2020 Date Title,Company Date f I Proposal INNCO Avenue S, Inc. L2-2nd Avenue #160 Sauk Rapids, MN 56379 i Phone(320)272-8288 i Submitted to Job Name Name Paul Timm Name Leucks Building Demolition Attn: AECOM Address 558 N Main Street Address City,state,Zip Oshkosh,WI 54901 City,State,Zip I Phone: 920-235-0321 Cell: Bid Date: Time Due: Date: 3/18/2020 Description Complete demolition of the former Luecks Building in Oshkosh,WI. Included: Temporary fence 600 If Erosion Control-Compost Logs 485 If Disconnect one water service at building foundation Disconnect one sewer service at building foundation Complete above grade demolition of structure Note 2,300 sf of exterior brick walls can not be recycled due to lead paint. All other masonry,brick and concrete will be put in owners stockpile next to jobsite LinnCo to work off of the asbestos abatement contractors notification Permits by Owner All roofing debris is assumed to be asbestos containing. All non recycle debris will be landfilled. Partial wood floor on warehouse to be landfilled. Concrete was noted below slab Complete below grade demolition Note West foundation wall to be broke off below grade yet left in place to limit sidewalk/road damages A crawlspace was noted below a portion of the building. Backfill footing voids and crawlspace with Owners crushed stockpiled materials adjacent to jobsite as noted in original bidding documents. Note Some backfill materials are noted in raised warehouse floor. This material figured for reuse. Excluded: Fabric above Owners crushed backfill materials. Topsoil/seed/restoration Note This will be completed at similar rates to other areas in original bid Universal/regulated wastes Examples Bulbs/ballasts/chemicals/freon/etc... TOTAL PRICE: $ 166,337.00 Prepared by-Nick Linnemann,President Accepted by(Signature) LInnCO,Inc. 3/18/2020 Date Title,Company Date CHANGE ORDER NO. 1 TO: LinnCo Inc. Date: March 18, 2020 Your present Contract-Sawdust District Demolition with the City of Oshkosh for the demolition of various structures is hereby amended and changed as follows: CB-1 UST Impacted Soil Disposal T&M Est.400 Tons Not to Exceed $ 8,100.00 CB-2 Unknown Concrete Structures Not To Exceed $ 67,600.00 CB-3 Luecks Home Improvement Demolition Lump Sum $ 166,400.00 Subtotal Increase $ 242,100.00 Original Award Contract Amount $467,714.50 Net Change Increase C.O.#1 $242,100.00 Revised Contract Amount $709,814.50 CITY OF OSHKOSH APPROVED AND ACCEPTED: City Manager LinnCo Inc. City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,under the within Change Order. Finance Director Russ Van Gompel Approved as to form: Lynn Lorenson,City Attorney Construction Bulletin Y kh. Bulletin No CB-1 Date 3/18/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the-Contract are hereby ordered (use additional pages if required) Fuel Oil Subsurface Impacted Soil Emergency Clean up at 43 E. 7ch Avenue Potential Fuel Oil Subsurface Clean up at 706 S. Main Street Reason for Modification(s) An underground fuel oil tank assumed to have been used for suppling a heating system was discovered during demolition of the office building at 43 E. 71h Avenue. The steel tank had several holes in it, and fuel oil apparently leaked into the subsurface. The tank was properly decommissioned but the soil surrounding the tank appeared to be severely impacted with fuel oil. AECOM recommended removal of the impacted material to limit future liability. LinnCo provided an estimate to load and transport 200 tons of impacted material to Waste Management's Valley Trail Landfill, Berlin Wisconsin. In addition, there is a potential for a fuel oil tank associated subsurface clean up with the Luecks Facility. This budget includes and estimated 200 tons for this potential cleanup also. AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs.Time and Materials Not-to-Exceed$8,100.00. Attachments(List Supporting Documents) LinnCo Inc. quote dated March 4,2020 Change Order 1. Budget was doubled to account for Luecks possible fuel oil tank Owner Contractor Engineer Recommendation By By By Date Date Date UnnCo, Inc. LINNCO 2-2nd Avenue South Suite#160 Sauk Rapids,MN 56379 Phone(320)272-8288 Change Order Request# 1 Date: March 4, 2020 To: Paul Timm -AECOM RE: Excavate,load and transport C-soils PER LOAD 200 ton estimated volume 18.2 ton hauled per load 10.99 loads to landfill 0.33 crew hours per load Equipment Volvo 300 Exc-Demo Package 3.66 $ 204.00 $ 747.25 Kubota SSV75 3.66 $ 55.00 $ 201.47 Pickup 3.66 $ 25.00 $ 91.58 Total Equipment $ 1,040.29 Labor Foreman-Operator 3.66 $ 112.00 $ 410.26 Laborer 3.66 $ 95.00 $ 347.99 Total Labor $ 758.24 Subcontractors/Materials ITO hauling per hour(Soper) 19.2 $ 100.00 $ 1,923.08 105 minute RT with load/dump $ - $ - Materials-Cost plus 15% 1,923.08 $ 288.46 Total Subs/Mat'ls $ 2,211.54 Misc lump sum pricing Total Misc lump sum $ - Bond 0.0% 4,010.07 $ - Total Bond $ - Grand Total $ 4,010.07 i Notes: We have priced the load out assuming our crew is working onsite. I i 1 I ify' Construction Bulletin &A b Bulletin No CB-2 Date 3/18/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Unanticipated and Buried Concrete Structures Encountered and Warning Fabric Permit Requirement Reason for Modification(s) Unknown Concrete Floor Slab/Gas Line and Valve During demolition of 43 E.71h Avenue buildings, a second layer of concrete floor slab was encountered under the building floor slab. This concrete slab was approximately 8"thick and reinforced. In addition, a 8"diameter natural gas line and valve was identified. This gas line and valve had to be investigated in an effort to determine if it was decommissioned. This slab and gas line/valve were not apparent or anticipated during the bidding process. Unknown Former Foundry Machine Foundations During demolition of 43 E. 7th Avenue buildings, a second layer of concrete floor slab was encountered under the building floor slab. Under this second layer of concrete several massive historic foundry machine foundations were encountered. These foundations were not apparent or anticipated during the bidding process. Warning Fabric As required by the Beneficial Reuse of Crushed Lead Impacted Concrete permit, a layer of fabric is required to be placed on top of the material and under the topsoil. This permit requirement was not part of the bidding documents. AECOM recommends approval as the quote is acceptable based on a comparison of similar E project costs.The approved budget is on a time and materials basis in the amount of$67,600.00. Attachments(List Supporting Documents) LinnCo Inc. Quote dated March 18, 2020 Owner Contractor Engineer Recommendation By By By Date Date Date E it E E I UnnCo, Inc, LINNCO 2-2nd Avenue South Suite#160 Sauk Rapids,MN 56379 Phone(320)272-8288 I Change Order Request# 2 Date: March 16, 2020 To: Paul Timm-AECOM RE: Buried Items discovered through 3116120 See attached for Item breakdown Equipment Volvo 300 Exc-Demo Package 104.46 $ 204.00 $21,309.77 Kubota SSV75 79.15 $ 55.00 $ 4,353.04 Dozer 17.68 $ 91.00 $ 1,608.61 Wacker Smooth Drum Compactor 28.43 $ 56.00 $ 1,592.26 Genesis LXP 25.31 $ 105.00 $ 2,667.91 Pickup 104.46 $ 25.00 $ 2,611.49 Total Equipment $ 34,132,98 Labor Foreman-Operator 122.14 $ 112.00 $ 13,679.18 Laborer 107.58 $ 95.00 $ 10,220.04 Total Labor $ 23,899.22 Subcontractors/Materials Subcontractor Loader/Operator 69.9 $ 106.00 $ 7,410.49 $ - $ 3 Materials-Cost plus 15% 7,410.49 $ 1,111.57 I Total Subs/Mat'Is $ 8,622.07 f Misc lump sum pricing ' Total Misc lump sum $ - ; j Bond 1.5% 66,554.27 $ 998.31 Total Bond $ 998.31 Grand Total $ 67,652.58 Notes: Pricing assumes utilizing same crushed concrete materials referenced as backfill in docu z Unknown items left to address that require more investigation before we can price: t Add1 unknown footings-Foundry and under North Building Gas Line beneath slab Fabric over crushed concrete I C-soil removals and backfill E' E I Unknown UST-Discovery/Stabilize situation-Load out of C-Soils and Backfill is not included Removal/PolyExcavator ExcfProcess Skidsteer Loader Dozer Roller Time Involved 1.0 1.0 Materials Utilized Poly Backfill Volume to be determined once C-soils are removed Excavator ExclProcess Skidsteer Loader Dozer Roller Total cy CV Excavator Exc/Process Skidsteer Loader Dozer Roller 1.0 0.0 1.0 0.0 0.0 0.0 2 Unknown Basement near SE loading dock 16 ftwide 38 ft long 6 ft deep 1 ft thick floor slab Removal Volumes Excavator Exc/Processor Skidsteer Loader Dozer Roller Rubble/Dirt Fill 135 cy CV 40 3.4 3.4 zs 5.4 Frost Walls 24 cy CV 10 24 is 1.3 2.4 is 1.0 Footings 12 cy CV 10 1.2 18 0.7 12 zs 0.5 Floor Slab 23 cy CV 10 2.3 is 1.3 2.3 zs 0.9 Totals 194 cy CV Backfill Volume Excavator Exc/Processor Skidsteer Loader Dozer Roller Total 194 cy CV 5.0 38s 5.0 5.0 Excavator Exc/Process Skidsteer Loader Dozer Roller 9.2 3.3 14.3 22.8 0.0 5.0 I I i t k i pE� 4 3 Unknown 8"slab beneath surface slab 27,424 sf 0.67 thickness Removal Volumes Excavator EXc/Processor Skidsteer Loader Dozer Roller Floor Slab 681 cy CV Us 54.4 10.0 54.4 25 27.2 Totals 681 cy CV Excavator ExclProcessor Skidsteer Loader Dozer Roller Backfill Volume Total 681 cy CV ass 17.7 17.7 17.7 Excavator Exc/Process Skidsteer Loader Dozer Roller 54.4 10.0 54.4 44.9 17.7 17.7 4 Unknown 54"tall pyramid piers with 5'x5'x2.5'thick pads along with buried foundation'. 14 Pyramids 2.375 4.5 35 14 Pads s 5 2.5 1 Beam 76 Ls 0.657 1 Beam 19 Ls 1000 1 Box Wall 62 4 L00a 1 Box Slab 10 21 1.000 Excavator Exc(Processor Skidsteer Loader Dozer Roller Removal Volumes Pyramids 19 cy CV 10 1.9 12 1.6 1.9 zs 0.8 25 0.0 Pads 32 cy CV 10 32 1z 2.7 3.2 2s 1.3 2s 0.0 Poured Beam 1 3 cy CV 10 0.3 sz 0.2 0.3 2s 0.1 25 0.0 Poured Beam 2 1 cy CV 10 0.1 12 0.1 0.1 25 0.0 25 0.0 Box Walls 9 cy CV 10 0.9 12 0.8 0.9 25 0.4 2s 0.0 Floor Slab 8 cy CV 10 0.8 u 0.6 0.8 25 0.3 25 0.0 Totals 73 cy CV Excavator Exc[ProcessorSkidsteer Loader Dozer Roller Backfill Volume j Removal Voids 73 cy CV Cube Void 31 cy CV Total 104 cy CV 2.7 38.s 2.7 2.7 I I Excavator Exc/Process Skidsteer Loader Dozer Roller k ( 7.3 6.1 10.0 5.6 0.0 2.7 I I I i r t 1 i I fiE f l 5 Unknown Southside Foundry Footing 1 Frost Walls 1.00' 139 4 1 1 Frost Walls 0.6T 31 4 0.67 1 Foundations 1 76 9 4.000 1 Foundations 2 47 s o.670 1 Floor Slab lass 1 L000 Excavator ExclProcessor Skidsteer Loader Dozer Roller Removal Volumes Frost Walls 1.00' 21 cy CV 10 2.1 iz 1.7 2.1 20 1.0 20 0.0 Frost Walls 0.6T 3 cy CV 10 0.3 12 0.3 0.3 20 0.2 20 0.0 Foundations'! 34 cy CV 10 3.4 iz 2.6 3.4 20 1.7 20 0.0 Foundations 2 6 cy CV 10 0.6 1z 0.5 0.6 20 0.3 20 0.0 Floor Slab 9 Cy CV 10 0.9 12 0.7 0.9 20 0.4 20 0.0 Totals 72 cy CV Excavator ExcfProcessor Skidsteer Loader Dozer Roller Backfill Volume Removal Voids 72 cy CV Cube Vold 45 cy CV Total 117 cy CV 3.0 385 3.0 3.0 Excavator Exc/Process Skidsteer Loader Dozer Roller 7.2 6.0 10.2 6.6 0.0 3.0 Excavator Exc/Proces Skidsteer Loader Dozer Roller Total Hours for Above Itein 79.1 25.3 89.9 69.9 17.7 28.4 I I i i [I I r j [E I is s } 2 ([ P MA '+ -13 � FM MMNW', � 4 / J a i ' KI'Wl'� L HIS � "fi � ram, ,,-_�`�� .:.�'=,��'" �� �.��` r,�,� �J��}'�} •-:�' `Ykfik i .x mfs` S m. p E R 3 P �f 7' Construction Bulletin &Z' ;Vdihkosh Bulletin No CB-3 Date 3/5/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Addition of Lueck's Home Improvement, 706 S. Main Street, Oshkosh Wisconsin. An approximate 12,000 square foot building with an asphalt paved parking lot. Reason for Modification(s) This facility is part of the Sawdust District Redevelopment area. All the surrounding buildings are already included in the demolition contract. AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs.The approved budget is on a time and materials basis in the amount of$167,000.00. Attachments (List Supporting Documents) LinnCo Inc. quote dated March 18, 2020. Owner Contractor Engineer Recommendation By By By Date Date Date I I I Proposal INN Avenue S, Inc. 2-2nd Avenue S#160 Sauk Rapids, MN 56379 Phone (320)272-8288 Submitted to Job Name Name Paul Timm Name Leucks Building Demolition Attn: AECOM Address 558 N Main Street Address City,State,zip Oshkosh,WI 54901 City,State,zip Phone: 920-235-0321 Cell: Bid Date: Time Due: Date: 3/18/2020 Description Complete demolition of the former Luecks Building in Oshkosh,WI. Included: Temporary fence 600 If Erosion Control-Compost Logs 485 If Disconnect one water service at building foundation Disconnect one sewer service at building foundation Complete above grade demolition of structure Note 2,300 sf of exterior brick walls can not be recycled due to lead paint. All other masonry,brick and concrete will be put in owners stockpile next to jobsite LinnCo to work off of the asbestos abatement contractors notification Permits by Owner All roofing debris is assumed to be asbestos containing. All non recycle debris will be landfilled. Partial wood floor on warehouse to be landfilled. Concrete was noted below slab Complete below grade demolition Note West foundation wall to be broke off below grade yet left in place to limit sidewalk/road damages A crawispace was noted below a portion of the building. Backfll footing voids and crawlspace with Owners crushed stockpiled materials adjacent to jobsite as noted in original bidding documents. Note Some backfill materials are noted in raised warehouse floor. This material figured for reuse. Excluded: Fabric above Owners crushed backfill materials. Topsoil/seed/restoration Note This will be completed at similar rates to other areas in original bid Universal/regulated wastes Examples Bulbs/ballasts/chemicals/freon/etc... TOTAL PRICE: $ 166,337.00 Prepared by-Nick Linnemann,President Accepted by(Signature) LinnCo,Inc. 3/18/2020 Date Title,Company Date i Proposal LinnCo, Inc. LINNCO 2 -2nd Avenue S#160 Sauk Rapids, MN 56379 Phone(320)272-8288 Submitted to Job Name Name Paul Timm Name Leucks Building Demolition Attn: AECOM Address 558 N Main Street Address City,State,Zip Oshkosh,WI 54901 City,State,Zip Phone: 920-235-0321 Cell: Bid Date: Time Due: Date: 3/18/2020 Description Complete demolition of the former Luecks Building in Oshkosh,WI. Included: Temporary fence 600 If Erosion Control-Compost Logs 485 If Disconnect one water service at building foundation Disconnect one sewer service at building foundation Complete above grade demolition of structure Note 2,300 sf of exterior brick walls can not be recycled due to lead paint. All other masonry,brick and concrete will be put in owners stockpile next to jobsite LinnCo to work off of the asbestos abatement contractors notification Permits by Owner All roofing debris is assumed to be asbestos containing. All non recycle debris will be landfilled. Partial wood floor on warehouse to be landfilled. Concrete was noted below slab Complete below grade demolition Note West foundation wall to be broke off below grade yet left in place to limit sidewalk/road damages A crawlspace was noted below a portion of the building. Backfill footing voids and crawlspace with Owners crushed stockpiled materials adjacent to jobsite as noted in original bidding documents. Note Some backfill materials are noted in raised warehouse floor. This material figured for reuse. Excluded: Fabric above Owners crushed backfill materials. Topsoil/seed/restoration Note This will be completed at similar rates to other areas in original bid Universal/regulated wastes Examples Bulbs/ballasts/chemicals/freon/etc... TOTAL PRICE: $ 166,337.00 Prepared by-Nick Linnemann,President Accepted by(Signature) LinnCo,Inc. 3/18/2020 Date Title,Company Date