HomeMy WebLinkAbout18. 20-118 MARCH 24, 2020 20-118 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT
NO. 19-04 HAZEL STREET (WASHINGTON AVENUE TO EAST
IRVING AVENUE) RECONSTRUCTION, FERNAU COURT PAVING,
AND PEARL AVENUE PAVING DORNER, INC. (-$86,208.44)
INITIATED BY: PUBLIC WORKS DEPARTMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
change Order, a copy of which is attached, is hereby approved:
DORNER, INC.
E506 Luxemburg Road
Luxemburg, WI 54217
Net Decrease to Contract: (-$86,208.44)
PURPOSE: See attached Change Order.
r,A
City
0fV
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager/City Engineer
DATE: March 19, 2020
RE: Change Order No. 2 for Public Works Contract No. 19-04
Hazel Street (Washington Avenue to East Irving Avenue) Reconstruction,
Fernau Court Paving, and Pearl Avenue Paving
Dorner,Inc. (-$86,208.44)
BACKGROUND
Change Order No.2 for Contract 19-04 is scheduled for consideration by the Common Council at
the March 24, 2020 meeting. The contract was originally awarded to Dorner, Inc. in March of
2019. Change Order No. 1 was approved by Council in October of 2019. This change order is for
additional services provided.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP:
• Street-Final quantities adjusted to match field conditions.
• Storm Sewer-Final quantities adjusted to match field conditions.
• Sanitary Sewer-Final quantities adjusted to match field conditions.
• Water Main-Final quantities adjusted to match field conditions.
• Sidewalk-Final quantities adjusted to match field conditions.
• Traffic-Final quantities adjusted to match field conditions.
L\Engineering\2019 CONTRACTS\19-04 1st Page 1 of 2
Paving\Project_Information\Correspondence\Memo\19-04 Memo for CO#2_3-19-20.docx
FISCAL IMPACT
New Construction
Contract Section Change Order Amount Costs with Engr CIP Budget Amount
Street $16,115.52 $1,324,509.05 $1,403,200
Storm Sewer -$1,620.30 $1,038,214.14 $1,214,000
Sanitary Sewer -$51,971.17 $597,215.16 $747,500
Water Main -$310.95 $777,629.54 $1,032,600
Sidewalk -$7,410.10 $55,019.89 $65,700
Traffic -$498.00 $160,274.99 $300,000
Park Improvements -$31,316.92 $123,854.23 $170,000
TIF #19 -$9,196.52 $132,623.62 $145,000
Total -$86,208.44 $4,209,340.62 $5,078,000
Adequate funds are available in the relating sections of the 2019 Capital Improvement Budget.
RECOMMENDATIONS
I recommend approval of Change Order No. 2 to Contact No. 19-04 in the amount of-$86,208.44
to Dorner, Inc.
Approved:
Mark A. Rohloff
City Manager
fLG/tlt
1:\Engineering\2019 CONTRACTS\19-04 1st Page 2 Of 2
Paving\Project_Information\Correspondence\Memo\19-04 Memo for CO#2_3-19-20.docx
i
TO: DORNER, INC. CHANGE ORDER#2(REVISED FINAL)
E506 LUXEMBURG ROAD DATE: MARCH 6,2020
LUXEMBURG,WI 54217
Your present contract with the City of Oshkosh, Contract No. 19-04, awarded March 26,2019, is hereby amended
and changed as follows:
NET DECREASE TO SECTION I: ($76,240.54)
NET DECREASE TO WORK UNIT A: ($9,228.92)
NET DECREASE TO WORK UNIT B: ($3,981.01)
NET DECREASE TO ALTERNATE 1 WORK: ($31,316.92)
NET INCREASE TO ADDITIONAL WORK: $34,558.95
NET DECREASE TO CONTRACT: ($86,208.44)
SECTION I TOTALS
BID TOTAL $3,539,793.35 $3,539,793.35
CO#1 $265,593.08 $265,593.08
PREVIOUS $3,805,386.43 $3,805,386.43
CO#2 ($86,208.44) ($86,208.44)
CONTRACT TOTAL $3,719,177.99 $3,719,177.99
CITY OF OSHKOSH
BY:
City Manager
City Clerk
�p moved a ccepted:
U
ntractor
1 certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
CONTRACT 19-04
SECTION I
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Clearing;complete as Inch
1011 specified Diameter 66.00 114.97 48.97 $46.35 $2,269.76
Grubbing;complete as Inch
1021 specified Diameter 1 66.00 114.97 48.97 $21.00 $1,028.37
Mobilization;complete as Lump
1050 specified Sum 1.00 1.00 $175,000.00
Removing pavement; Square
1100 complete asspecified Yards 13,050.00 12,882.30 -167.70 $1.00 $167.70
Removing concrete and
asphalt sidewalk and
driveway;complete as Square
1120 specified Feet 1 23,950.00 23,251.40 -698.60 $1.00 $698.60
Unclassified excavation; Cubic
1200 complete as specified Yards 3,600.00 3,911.10 311.10 1 $18.00 $5,599.80
Excavation special(paving);
1220 complete as specified Tons 150.00 0.00 -150.00 $15.00 $2,250.00
7"concrete pavement;with
5"CABC and grading; Square
1301 complete as specified Yards 2,260.00 2,224.80 -35.20 $50.00 $1,760.00
8"concrete pavement;with
6"CABC and grading; Square
1311 complete asspecified Yards 9,015.00 9,208.50 193.50 $53.00 $10,255.50
8"concrete pavement HES;
with 6"CABC and grading; Square
1313 complete as specified Yards 1,170.00 845.70 -324.30 $56.00 $18,160.80
Crushed aggregate base
course;complete as
1340 specified Tons 2,466.00 1,325.30 -1,140.70 $6.00 $6,844.20
Pavement ties;complete as
1350 specified Each 95.00 96.00 1.00 1 $8.00 $8.00
Drilled dowel bars; 1 1/4';
1354 complete as specified Each 140.00 95.00 -45.00 $14.00 $630.00
Adjust manholes and inlets;
1360 complete as specified Each 1 74.00 74.00 $309.00
Turf restoration on Hazel Square
1370A Street;complete as specified Yards 4,300,00 5,736.30 1436.30 $8.00 $11,490.40
Turf restoration for East
Parkway Avenue storm
sewer restoration;complete Lump
1370B as specified Sum 1.00 1.00 $18,746.00
Restore gravel
driveway/apron;complete as Square
1372 specified Yards 5.00 5.00 $52.00
Cold weather covering
(concrete pavement)-single
visquine;complete as Square
1380 specified Yards 1,227.00 0.00 -1,227.00 $1.00 $1,227.00
Cold weather covering
(concrete pavement)-double
visquine;complete as Square
1382 specified Yards 1 1,227.00 1 0.00 1 1 -1,227.00 $2.00 $2,454.00
Cold weather covering
(concrete pavement)-double
visquine with 6"hay; Square
1384 1 complete as specified Yards 1,227.00 0.00 -1,227.00 $7.00 $8,589.00
Page 1 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASEIN DECREASEIN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITY INSTALLED INCREASE DECREASE PRICE
PRICE PRICE
Up-charge for late season
cold weather concrete
pavement;complete as Cubic
1390 specified Yards 273.00 308.00 35.00 $10.00 $350.00
12"radius curb with 6"CABC
and grading;complete as Linear
1410 specified Feet 285.00 282.20 -2.80 $11.00 $30.80
30"curb and gutter;8";with
6"CABC and grading; Linear
1442 complete asspecified Feet 1 345.00 325.80 -19.20 $36.00 $691.20
Sidewalk curb;complete as Linear
1460 ispecified Feet 30.00 79.20 49.20 $67.00 $3,296.40
4"concrete sidewalk with 3"
CABC and grading;complete Square
1500 asspecified Feet 14,350.00 14,802.80 452.80 $7.00 $3,169.60
6"concrete sidewalk/
driveway/ramp with 3"CABC
and grading;complete as Square
1510 specified Feet 6,600.00 4,666.10 -11933.90 $8.00 $15,471.20
6"concrete sidewalk/
driveway/ramp(HES)with 3"
CABC and grading;complete Square
1514 1 as specified Feet 1,584.00 3,588.70 2004.70 1 $8.00 $16,037.60
8"concrete sidewalk/
driveway/ramp(HES)with 3"
CABC and grading;complete Square
1524 as specified Feet 1 1,025.00 637.20 -387.80 $8.00 $3,102.40
6"concrete step;complete Square
1530 asspecified Feet 75.00 41.80 -33.20 $67.00 $2,224.40
Curb ramp detectable
warning field(natural/non-
painted);complete as Square
1540 specified Feet 112.00 120.00 8.00 $34.00 $272.00
No.4 reinforcing rods-
deformed;epoxy-coated; Linear
1550 complete as specified Feet 2,280.00 1,710.00 -570.00 $2.00 $1,140.00
Drilled No.4 sidewalk tie
bars-deformed;epoxy-
coated;complete as
1560 specified Each 92.00 101.00 9.00 $10.00 $90.00
Cold weather covering
(sidewalk)-single visquine; Square
1580 complete as specified Feet 1,150.00 10,167.50 9017.50 $1.00 $9,017.50
Cold weather covering
(sidewalk)-double visquine; Square
1582 complete as specified Feet 1,150.00 0.00 -1,150.00 1 $1.00 $1,150.00
Cold weather covering
(sidewalk)-double visquine
with 6"hay;complete as Square
1584 specified Feet 1,150.00 0.00 -1,150.00 $1.00 $1,150.00
Up-charge for late season
cold weather concrete
sidewalk;complete as Cubic
1590 specified Yards 32.00 1 148.50 116.50 1 $9.00 $1,048.50
Furnish and install tree;
1600 complete as specified Each 5.00 0.00 -5.00 $412.00 $2,060.00
Locate existing property
monuments;complete as
1650 specified Each 45.00 30.00 -15.00 $129.00 $1,935.00
Replace section corner;
1651 complete as specified Each 1.00 1.00 $381.00
Page 2 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Replace existing property
monuments;complete as
1652 specified Each 20.00 5.00 -15.00 $52.00 $780.00
Sawing existing pavement; Linear
1700 complete as specified Feet 190.00 154.80 -35.20 $3.00 $105.60
Sawing concrete pavement
full depth;complete as Linear
1710 specified Feet 625.00 645.30 20.30 $3.00 $60.90
Tack coat;complete as
1900 specified Gallons 62.00 10.00 -52.00 $6.00 $312.00
4"asphaltic pavement LT
with 10"CABC and grading; Square
1906 complete as specified Yards 665.00 709.30 44.30 $29.00 $1,284.70
4"asphaltic transition LT with
10"CABC and grading; Square
1911 complete as specified Yards 90.00 114.60 24.60 1 $46.00 $1,131.60
4"asphaltic surface LT with
6"CABC and grading; Square
1916 complete as specified Yards 1 55.00 53.30 -1.70 $40.00 $68.00
2"asphaltic surface LT with
6"CABC and grading; Square
1917 complete as specified Yards 20.00 0.00 -20.00 $50.00 $1,000.00
Asphaltic cold weather
paving;complete as Square
1918 specified Yards 75.00 625.90 550.90 1 $42.00 $23,137.80
Furnish and install 10"storm Linear
2002 sewer;complete as specified Feet 85.00 43.00 -42.00 $84.00 $3,528.00
Furnish and install 12"storm Linear
2003 sewer;complete as specified Feet 450.00 1 484.90 34.90 $70.00 $2,443.00
Furnish and install 15"storm Linear
2006 sewer;complete as specified Feet 40.00 27.80 -12.20 $72.00 $878.40
Furnish and install 18"storm Linear
2009 sewer;complete as specified Feet 180.00 210.70 30.70 1 $63.00 $1,934.10
I
Furnish and install 21"storm Linear
2012 sewer;complete as specified Feet 620.00 616.20 -3.80 $85.00 $323.00
Furnish and install 24"storm Linear
2015 sewer;complete asspecified Feet 340.00 332.40 -7.60 $90.00 $684.00
Furnish and install 27"storm Linear
2018 sewer;complete as specified Feet 50.00 44.90 -5.10 1 $95.00 $484.50
Furnish and install 36"storm Linear
2024 sewer;complete as specified Feet 525.00 1 529.80 4.80 $115.00 $552.00
Furnish and install 42"storm Linear
2027 sewer;complete as specified Feet 40.00 36.20 1 -3.80 $182.00 $691.60
Furnish and install 48"storm Linear
2030 sewer;complete as specified Feet 1 880.00 876.80 -3.20 1 $155.00 $496.00
Furnish and install 38"x 60"
HERCP Class III storm Linear
2055 sewer;complete as specified Feet 5.00 0.00 -5.00 $224.00 $1,120.00
Page 3 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITY INSTALLED INCREASE DECREASE PRICE
PRICE PRICE
Furnish and install 48"x 76"
HERCP Class III storm Linear
2059 sewer;complete as specified Feet 650.00 652.10 2.10 $208.00 $436.80
Furnish and install 48"x 76"
RCP Class III apron endwall
with joint ties;complete as
2161 specified Each 1.00 1.00 $29,868.00
Furnish and install standard
storm sewer manhole(4'
diameter);complete as Vertical
2201 specified Feet 1 18.50 17.67 1 -0.83 $413.00 $342.79
Furnish and install standard
storm sewer manhole(5'
diameter);complete as Vertical
2202 specified Feet 19.70 15.50 -4.20 1 $551.00 $2,314.20
Furnish and install standard
storm sewer manhole(6'
diameter);complete as Vertical
2203 specified Feet 1 22.70 14.90 -7.80 $600.00 $4,680.00
Furnish and install standard
storm sewer manhole(7'
diameter);complete as Vertical
2204 specified Feet 23.25 32.81 9.56 $750.00 $7,170.00
Furnish and install standard
storm sewer manhole(8'x 8' Vertical
2211 1 box);complete as specified Feet 20.90 21.79 0.89 $1,300.00 $1,157.00
Furnish and install Type 1
2236 inlet;complete as specified Each 1 2.00 1.00 1 -1.00 $1,835.00 $1,835.00
Furnish and install Type 3
inlet(with 18"sump);
2237 complete as specified Each 22.00 21.00 -1.00 $1,960.00 $1,960.00
Furnish and install Type 3
2238 inlet;complete as specified Each 2.00 2.00 $1,801.00
Furnish and install 6"storm
sewer lateral;complete as Linear
2400 specified Feet 1,175.00 1,232.00 1 57.00 $70.00 $3,990.00
Furnish and install 8"storm
sewer lateral;complete as Linear
2402 Ispecified Feet 75.00 70.00 -5.00 $78.00 $390.00
Furnish and install storm
sewer marker balls;complete
2404 as specified Each 69.00 64.00 -5.00 $52.00 $260.00
Furnish and install storm
sewer clay dams;complete
2406 as specified Each 35.00 32.00 -3.00 $119.00 $357.00
Furnish and install storm
sewer lateral inlet;complete
2408 as specified Each 29.00 29.00 $585.00
Storm lateral inlet
adjustments;complete as
2414 Ispecified Each 1 29.00 0.00 1 -29.00 $116.00r($3,364.00)
Furnish;install;maintain;and
remove Type D modified inlet
protection;complete as
2508 specified Each 85.00 47.00 -38.00 $72.00 $2,736.00
Sediment removal-Type D
modified inlet protection;
2510 lcomplete as specified I Each 85.00 1.00 1 -84.00 1 $5.00 $420.00
Page 4 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Furnish;install;maintain;and
remove stone tracking pad;
2512 complete as specified Each 2.00 0.00 -2.00 $1,027.00 $2,054.00
Furnish;install;maintain;and
remove stone bag;complete
2516 as specified Each 60.00 41.00 -19.00 $10.00 $190.00
Furnish;install;maintain;and
remove 12"diameter
sediment logs;complete as Linear
2518 specified Feet 100.00 40.00 -60.00 $10.00 $600.00
Furnish;install;maintain;and
remove ditch check;
2522 complete as specified Each 20.00 0.00 -20.00 $21.00 $420.00
Furnish;install;maintain;and
remove dewatering tank
system;complete as
2524 specified Each 4.00 0.00 -4.00 $1,000.00 $4,000.00
Furnish;install;maintain;and
remove turbidity barrier;
2526 complete as specified Each 1.00 1.00 $5,562.00
Furnish and install topsoil 6" Square
2600 depth;complete as specified Yards 28.00 0.00 -28.00 $15.00 $420.00
Furnish and install turf grass; Square
2620 complete as specified Yards 28.00 0.00 -28.00 1 $1.00 $28.00
Furnish and install Class I;
Urban;Type A erosion
control mat;complete as Square
2632 specified Yards 28.00 0.00 -28.00 $3.00 $84.00
Furnish and install heavy rip-
rap with filter fabric;complete Square
2650 as specified Yards 45.00 72.00 27.00 $80.00 $2,160.00
Abandon 8"-12"storm Linear
2800 sewer;complete as specified Feet 70.00 1 65.00 -5.00 $5.00 $25.00
Abandon 15"and larger
storm sewer;complete as Linear
2802 specified Feet 1,350.00 1,339.00 -11.00 $16.00 $176.00
Remove 30"and smaller
storm sewer;complete as Linear
2804 specified Feet 365.00 360.00 -5.00 $29.00 $145.00
Remove 33"-60"storm Linear
2806 sewer;complete as specified Feet 35.00 35.00 $51.00
Abandon storm sewer
manholes and inlets;
2810 complete as specified Each 9.00 8.00 -1.00 $387.00 $387.00
Remove storm sewer
manholes and inlets;
2812 complete as specified Each 7.00 6.00 -1.00 1 $561.00 $561.00
Connect to existing storm
sewer main;complete as
2850 specified Each 7.00 4.00 -3.00 $799.00 $2,397.00
Connect to existing storm
sewer lateral;complete as
2852 s ecified Each 3.00 2.00 -1.00 $475.00 $475.00
Connect to existing storm
sewer manhole;complete as
2856 specified Each 3.00 1 3.00 $929.00
Page 5 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Storm sewer utility line
opening(ULO);complete as
2914 specified Each 6.00 1.00 -5.00 $465.00 $2,325.00
Excavation special(storm);
2950 complete as specified Tons 150.00 0.00 1 -150.00 $25.00 $3,750.00
Bentonite slurry dam(storm);
2952 complete as specified Each 3.00 0.00 -3.00 $225.O0 $675.00
Furnish and install 8"sanitary
sewer(relay);complete as Linear
3000 specified Feet 1,315.00 1,321.20 1 6.20 $134.00 $830.80
Furnish and install 10"
sanitary sewer(relay); Linear
3002 complete as specified Feet 114.00 112.70 -1.30 $145.00 $188.50
Furnish and install 12"
sanitary sewer(relay); Linear
3004 complete as specified Feet 127.00 99.90 -27.10 $137.00 $3,712.70
Furnish and install 33"
sanitary sewer(relay); Linear
3015 complete as specified Feet 10.00 0.00 -10.00 $250.00 $2,500.00
Furnish and install 60"
sanitary sewer(relay); Linear
3024 complete as specified Feet 20.00 0.00 -20.00 $425.00 $8,500.00
Furnish and install 8"sanitary
sewer drop;complete as Vertical
3060 specified Feet 1 26.00 7.37 -18.63 $436.00 $8,122.68
Furnish and install standard
sanitary sewer manhole(4'
diameter);complete as Vertical
3100 specified Feet 112.00 97.52 -14.48 $300.00 $4,344.00
Furnish and install standard
sanitary sewer manhole(5'
diameter);complete as Vertical
3102 specified Feet 12.00 0.00 -12.00 1 $439.00 $5,268.00
Furnish and install sanitary
sewer manhole junction
chamber M-6;complete as
3113 specified Each 1.00 0.00 -1.00 $13,870.00 $13,870.00
Furnish and install external
sanitary sewer manhole
chimney seal;complete as
3114 specified Each 15.00 16.00 1.00 $489.00 $489.00
Furnish and install external
sanitary sewer manhole
chimney seal extension;
3116 Icomplete as specified Each 1 2.00 2.00 $412.00
Furnish and install internal
sanitary sewer manhole
chimney seal;complete as
3118 specified Each 2.00 1.00 1 -1.00 $412.00 $412.00
Furnish and install internal
sanitary sewer manhole
chimney seal extension;
3120 complete as specified Each 2.00 0.00 -2.00 $361.00 $722.00
Rebuild sanitary sewer
manhole(5'diameter); Vertical
3138 complete as specified Feet 8.00 0.00 -8.00 $210.00 $1,680.00
Furnish and install 8"x 6"
sanitary sewer factory wyes
or tees;complete as
3210 specified Each 9.00 15.00 6.00 $141.00 $846.00
Page 6 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT QUANTITIES NET NET UNIT CONTRACT CONTRACT
NUMBER QUANTITY INSTALLED INCREASE DECREASE PRICE PRICE PRICE
Furnish and install 6"sanitary
sewer"Insert-A-Tee"or"Kor-
N-Tee';complete as
3222 specified Each 6.00 0.00 -6.00 $217.00 $1,302.00
Furnish and install 4"/6"
sanitary sewer lateral(relay); Linear
3234 complete as specified Feet 1 956.00 1,029.50 73.50 $100.00 $7,350.00
Furnish and install 4"/6"
sanitary sewer riser(relay); Linear
3235 complete asspecified Feet 139.00 44.00 -95.00 $100.00 $9,500.00
Furnish and install sanitary
sewer lateral marker balls;
3236 complete as specified Each 58.00 60.00 2.00 $52.00 $104.00
Furnish and install clay
3238 dams;complete as specified Each 29.00 29.00 $119.00
Furnish and install
connection to existing 8"
sanitary sewer mains;
3300 complete as specified Each 2.00 2.00 $986.00
Furnish and install
connection to existing 12"
sanitary sewer mains;
3304 1 complete as specified Each 3.00 3.00 1 $1,283.00
Furnish and install
connection to existing 33"
sanitary sewer mains;
3315 complete asspecified Each 1 1.00 1.00 $1,627.00
Furnish and install
connection to existing 60"
sanitary sewer mains;
3324 complete as specified Each 2.00 0.00 1 -2.00 $2,788.00 $5,576.00
Furnish and install sanitary
sewer concrete collars;
3330 complete as specified Each 1.00 1.00 $1,935.00
Core into existing manhole;
3332 complete asspecified Each 6.00 4.00 -2.00 $5.81.00 $1,162.00
Rock excavation;complete Cubic
3600 as specified Yards 40.00 0.00 -40.00 $0.01 $0.40
Closed circuit televising; Linear
3700 complete as specified Feet 1,586.00 1,520.00 -66.00 $2.00 $132.00
Closed circuit televising-
using push camera;complete
3710 as specified Each 5.00 21.00 16.00 $206.00 $3,296.00
Abandon sanitary sewer
manholes;complete as
3800 specified Each 6.00 6.00 $755.00
Abandon 8"sanitary sewer; Linear
3802 Icomplete as specified Feet 143.00 143.00 $15.00
Abandon 10"sanitary sewer; Linear
3804 complete as specified Feet 281.00 281.00 $18.00
i
Abandon 12"sanitary sewer; Linear
3806 complete as specified Feet 236.00 1 236.00 $22.00
Abandon 36"sanitary sewer; Linear
3820 complete as specified Feet 997.00 997.00 $21.00
Remove sanitary sewer
manholes;complete as
3852 specified Each 4.00 4.00 1 $774.00
Page 7 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE T DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Remove sanitary sewer; Linear
3854 complete as specified Feet 280.00 275.20 -4.80 $76.00 $364.80
Sanitary sewer utility line
opening(ULO);complete as
3890 specified Each 1 3.00 0.00 -3.00 $650.00 $1,950.00
Excavation special(sanitary);
3892 complete as specified Tons 30.00 0.00 -30.00 $25.00 $750.00
Furnish and install 15"
sanitary sewer grouting;
3942 complete asspecified Each 1.00 0.00 -1.00 $876.00 $876.00
Furnish and install 60"
sanitary sewer grouting;
3964 complete as specified Each 1.00 0.00 -1.00 $2,266.00 $2,266.00
Furnish sanitary sewer
manhole grouting setup;
3974 complete as specified Each 4.00 4.00 1 $742.00
Furnish and install sanitary
sewer manhole grouting;
3975 complete as specified Gallons 40.00 33.73 -6.27 $15.00 $94.05
Furnish sanitary sewer
manhole cementitious liner
3976 setup;complete as specified Each 1.00 0.00 -1.00 $721.00 $721.00
Furnish and install sanitary
sewer structural cementitious
liner-PERMACAST by AP/M
PERMAFORM;complete as Vertical
3977 specified Feet 10.00 0.00 1 -10.00 $268.00 $2,680.00
Furnish and install 4"ductile
iron water main(relay)with
polywrap;complete as Linear
4000 specified Feet 25.00 7.50 -17.50 $132.00 $2,310.00
I Furnish and install 6"ductile
iron water main(relay)with
polywrap;complete as Linear
4002 specified Feet 65.00 101.20 36.20 $145.00 $5,249.00
Furnish and install 8"ductile
iron water main(relay)with
polywrap;complete as Linear
4004 specified Feet 570.00 472.50 -97.50 1 $100.00 $9,750.00
Furnish and install 12"ductile
iron water main(relay)with
polywrap;complete as Linear
4008 specified Feet 1 10.00 64.50 54.50 $200.00 $10,900.00
Furnish and install 16"ductile
iron water main(relay)with
polywrap;complete as Linear
4010 specified Feet 1,670.00 1,709.90 39.90 $150.00 $5,985.00
Furnish and install 18"ductile
iron water main(relay)with
polywrap;complete as Linear
4012 specified Feet 5.00 0.00 -5.00 $664.00 $3,320.00
Furnish and install 24"ductile
iron water main(relay)with
polywrap;complete as Linear
4016 specified Feet 100.00 68.00 -32.00 $203.00 $6,496.00
Furnish and install V water
service(relay);complete as Linear
4036 specified Feet 614.00 764.00 150.00 $90.00 $13,500.00
Page 8 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACTT CONTRACT
PRICE PRICE
Furnish and install 1-1/4"
water service(relay); Linear
4037 complete as specified Feet 18.00 19.00 1.00 $90.00 $90.00
Furnish and install 1"
corporation and stop box;
4048 1 complete asspecified Each 1 26.00 27.00 1.00 $814.00 $814.00
Furnish and install 1-1/4"
corporation and stop box;
4050 complete as specified Each 1.00 0.00 -1.00 $1,170.00 $1,170.00
Furnish and install water
service clay dams;complete
4055 as specified Each 27.00 26.00 1 -1.00 $119.00 $119.00
Furnish and install
connections to existing 4"
water main;complete as
4056 specified Each 1.00 1.00 $860.00
Furnish and install
connections to existing 6"
water main;complete as
4058 specified Each 1 1.00 1.00 $1,153.00
Furnish and install
connections to existing 8"
water main;complete as
4060 specified Each 3.00 2.00 1 -1.00 $1,686.00 $1,686.00
Furnish and install
connections to existing 12"
water main;complete as
4064 specified Each 1 1.00 2.00 1.00 $2,218.00 $2,218.00
Furnish and install
connections to existing 16"
water main;complete as
4066 specified Each 2.00 2.00 1 $3,560.00
Furnish and install
connections to existing 18"
water main;complete as
4068 specified Each 1 1.00 1.00 $2,670.00
Temporary water main; Lump
4080 complete asspecified Sum 1.00 1.00 $1,893.00
Furnish and install 8"x 4"
water main tee;complete as
4109 specified Each 1.00 1.00 1 $464.00
Furnish and install 8"x 6"
water main tee;complete as
4110 Ispecified Each 1 2.00 1.00 -1.00 $515.00 $515.00
Furnish and install 16"x 6"
water main tee;complete as
4137 specified Each 5.00 5.00 1 $1,542.00
Furnish and install 24"x 16"
water main tee;complete as
4168 specified Each 1.00 1.00 $4,666.00
Furnish and install 16"11-1/4
degree water main bend;
4222 complete as specified Each 1 2.00 0.00 -2.00 $1,431.00 $2,862.00
Furnish and install 4"45
degree water main bend;
4235 complete as specified Each 2.00 1 2.00 $209.00
Furnish and install 6"45
degree water main bend;
4236 com fete as specified Each 14.00 12.00 -2.00 $270.00 $540.00
Furnish and install 8"45
degree water main bend;
4237 complete ass specified Each 8.00 4.00 -4.00 $350.00 $1,400.00
Page 9 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Furnish and install 16"45
degree water main bend;
4240 complete as specified Each 6.00 12.00 6.00 $1,470.00 $8,820.00
Furnish and install 24"45
degree water main bend;
4243 complete as specified Each 1 4.00 0.00 -4.00 1 $3,211.00 $12,844.00
Furnish and install 8"x 6"
water main reducer;
4264 complete as specified Each 1.00 0.00 -1.00 $305.00 $305.00
Furnish and install 12"x 8"
water main reducer 4270 complete as specified Each 2.00 1.00 -1.00 $546.00 $546.00
Furnish and install 18"x 16"
water main reducer;
4282 complete as specified Each 1.00 1.00 $1,620.00
Furnish and install 24"x 16"
water main reducer;
4295 complete as specified Each 2.00 1 2.00 $2,630.00
Cut and cap existing 8"water
4354 main;complete asspecified Each 1.00 0.00 -1.00 $736.00 $736.00
Cut and cap existing 12"
water main;complete as
4358 specified Each 2.00 0.00 -2.00 $996.00 $1,992.00
Cut and cap existing 16"
water main;complete as
4360 Ispecified Each 2.00 1 2.00 1 $1,624.00
Furnish and install 4"water
main gate valve;complete as
4400 specified Each 1.00 1.00 $1,046.00
Furnish and install 6"water
main gate valve;complete as
4401 specified Each 1 6.00 6.00 $1,207.00
Furnish and install 8"water
main gate valve;complete as
4402 specified Each 3.00 2.00 -1.00 $1,637.00 $1,637.00
Furnish and install 16"water
main gate valve;complete as
4405 specified Each 7.00 7.00 $6,903.00
Furnish and install 24"water
main gate valve;complete as
4408 specified Each 1 2.00 2.00 1 $18,088.00
Furnish and install 18"x 8"
tapping valve and sleeve;
4465 complete as specified Each 1.00 1.00 $5,442.00
Furnish and install hydrant;
4500 complete as specified Each 6.00 7.00 1.00 $3,994.00 $3,994.00
Furnish and install 36"water
main casing pipe;complete Linear
4734 as specified Feet 1 30.00 30.00 1 $213.00
Rock excavation;complete Cubic
4800 as specified Yards 40.00 0.00 -40.00 $0.01 $0.40
Abandon water main on
Hazel Street;complete as Lump
4900 specified Sum 1.00 1.00 $1,006.00
Remove water main; Linear
4920 complete as specified Feet 335.00 235.00 -100.00 $45.00 $4,500.00
Excavation special(water);
4990 complete as specified Tons 24.75 0.00 -24.75 $25.00 $618.75
Furnish and install pull box
(steel);24"x 36";complete
5016 as specified Each 19.00 19.00 $979.00
Page 10 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Adjust pull box;complete as
5025 specified Each 19.00 0.00 -19.00 $5.00 $95.00
Furnish and install 3"
Schedule 40 PVC;complete Linear
5130 as specified Feet 3,670.00 3,679.00 9.00 $7.00 $63.00
Connect to existing conduit;
5184 complete as specified Each 1.00 1.00 $129.00
Furnish and install 4 gauge
red-coated wire;complete as Linear
5230 specified Feet 5,120.00 5,273.00 153.00 $1.00 $153.00
Furnish and install 4 gauge
black-coated wire;complete Linear
5231 as specified Feet 5,120.00 5,273.00 153.00 1 $1.00 $153.00
Furnish and install 8 gauge
red-coated wire;complete as Linear
5250 specified Feet 410.00 389.00 -21.00 $1.00 $21.00
Furnish and install 8 gauge
black-coated wire;complete Linear
5251 as specified Feet 410.00 1 389.00 -21.00 $1.00 $21.00
Furnish and install 8 gauge
green-coated wire;complete Linear
5252 as specified Feet 4,010.00 4,156.00 146.00 $1.00 $146.00
Furnish and install 12 gauge
red-coated wire;complete as Linear
5270 specified Feet 1 750.00 420.00 -330.00 1 $1.00 $330.00
Furnish and install 12 gauge
black-coated wire;complete Linear
5271 as specified Feet 750.00 420.00 -330.00 $1.00 $330.00
Furnish and install 12 gauge
green-coated wire;complete Linear
5272 as specified Feet 750.00 420.00 1 -330.00 $1.00 $330.00
Furnish and install fuse
5380 holder;complete as specified Each 1 40.00 42.00 2.00 $52.00 $104.00
Furnish and install 5A fuse;
5392 complete as specified Each 1 40.00 1 42.00 2.00 1 $5.00 $10.00
Install light pole and pole arm
and acorn pole top light,"City
Supplied,"complete as
5410 specified Each 19.00 19.00 $515.00
Furnish and install Type 5
5504 base;complete as specified Each 19.00 19.00 1 $773.00
SECTION I(BID ITEMS 1011 -5504)SUBTOTAL: $174,506.13 ($250,746.67)
NET DECREASE: ($76,240.54)
ADDITIONAL WORK REQUIRED:
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Mobilization;complete as Lump
A-1050 specified Sum 1.00 1.00 $30,000.00
Removing concrete and
asphalt sidewalk and
driveway;complete as Square
A-1120 specified Feet 1 434.30 1 431.50 1 1 -2.80 1 $2.00 $5.60
Unclassified excavation; Cubic
A-1200 Icomplete as specified Yards 1 98.20 1 95.00 -3.20 $28.00 $89.60
Page 11 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITY INSTALLED INCREASE DECREASE PRICE
PRICE PRICE
8"concrete pavement
doweled;HES;with base in
place and grading;complete Square
A-1314B as specified Yards 835.00 838.00 3.00 $83.00 $249.00
Drilled dowel bars; 1 1/4";
A-1354 complete as specified Each 1 27.00 26.00 1 -1.00 $15.00 $15.00
Adjust manholes and inlets;
A-1360 I complete as specified Each 3.00 3.00 $386.00
Turf restoration on Fernau Square
A-1370 Court;complete as specified Yards 525.00 300.00 -225.00 $15.00 $3,375.00
Cold weather covering
(concrete pavement)-single
visquine;complete as Square
A-1380 specified Yards 823.90 898.00 74.10 $0.01 $0.74
Cold weather covering
(concrete pavement)-double
visquine;complete as Square
A-1382 specified Yards 276.00 0.00 -276.00 $4.40 $1,214.40
Cold weather covering
(concrete pavement)-double
visquine with 6"hay; Square
A-1384 complete as specified Yards 1 276.00 0.00 1 -276.00 $11.00 $3,036.00
Up-charge for late season
cold weather concrete
pavement;complete as Cubic
A-1390 specified Yards 186.00 226.00 40.00 $9.00 $360.00
12"radius curb with 6"CABC
and grading;complete as Linear
A-1410 specified Feet 285.00 264.40 -20.60 $11.00 $226.60
6"concrete sidewalk/
driveway/ramp(HES)with 3"
CABC and grading;complete Square
A-1514 as specified Feet 965.00 903.40 -61.60 $9.00 $554.40
No.4 reinforcing rods-
deformed;epoxy-coated; Linear
A-1550 complete as specified Feet 60.00 60.00 $2.00
Cold weather covering
(sidewalk)-single visquine; Square
A-1580 complete as specified Feet 965.00 903.40 -61.60 $1.10 $67.76
Cold weather covering
(sidewalk)-double visquine; Square
A-1582 complete as specified Feet 1 316.00 0.00 1 -316.00 $2.20 $695.20
Cold weather covering
(sidewalk)-double visquine
with 6"hay;complete as Square
A-1584 specified Feet 316.00 0.00 -316.00 $3.30 $1,042.80
Up-charge for late season
cold weather concrete
sidewalk;complete as Cubic
A-1590 specified Yards 18.00 16.70 1 -1.30 $11.00 $14.30
Sawing existing pavement; Linear
A-1700 complete ass ecified Feet 45.00 41.00 -4.00 $6.00 $24.00
Furnish and install 12"storm Linear
A-2003 sewer;complete as specified Feet 57.00 62.00 5.00 $102.00 $510.00
Furnish and install storm
sewer marker balls;complete
A-2404 as specified Each 1.00 1.00 $58.00
Furnish and install storm
sewer clay dams;complete
A-2406 as specified Each 1.00 1.00 $127.00
Page 12 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE T DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Furnish;install;maintain;and
remove Type D modified inlet
protection;complete as
A-2508 specified Each 1 2.00 2.00 1 $116.00
Sediment removal-Type D
modified inlet protection;
A-2510 complete as specified Each 2.00 0.00 -2.00 $23.00 $46.00
Furnish;install;maintain;and
remove stone bag;complete
A-2516 I asspecified Each 6.00 0.00 -6.00 $12.00 $72.00
Connect to existing storm
sewer manhole;complete as
A-2856 specified Each 1.00 1.00 $1,011.00
Furnish and install external
sanitary sewer manhole
chimney seal;complete as
A-3114 ispecified Each 1 1.00 1.00 $524.00
Furnish and install external
sanitary sewer manhole
chimney seal extension;
A-3116 complete as specified Each 1.00 1.00 $441.00
Furnish and install 8"x 6"
sanitary sewer factory wyes
or tees;complete as
A-3210 ispecified Each 1.00 1.00 $202.00
Furnish and install 6"sanitary
sewer lateral (new);complete Linear
A-3232 as specified Feet 55.00 60.00 5.00 $136.00 $680.00
Furnish and install sanitary
sewer lateral marker balls;
A-3236 complete as specified Each 2.00 2.00 $58.00
Furnish and install clay
A-3238 dams;complete as specified Each 1.00 1.00 $127.00
Closed circuit televising; Linear
A-3700 complete as specified Feet 25.00 0.00 -25.00 $22.00 $550.00
ADDITIONAL WORK REQUIRED:WORK UNIT A(BID ITEMS A-1050 -A-3700)-SUBTOTAL: $1,799.74 ($11,028.66)
NET DECREASE: ($9,228.92)
WORK UNIT B
ADDITIONAL WORK REQUIRED:
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Removing concrete and
asphalt sidewalk and
driveway;complete as Square
B-1120 specified Feet 315.70 313.60 -2.10 $2.00 $4.20
Unclassified excavation; Cubic
B-1200 complete asspecified Yards 71.80 69.50 -2.30 $28.00 $64.40
8"concrete pavement HES
removal and replacement;
including sawing;pavement
ties;dowel bars;bond
breaker;integral curb and
fine grading;turf restoration;
and traffic control;complete Square
B-1319 as specified Yards 1 850.00 852.70 1 2.70 $120.00 $324.00
Page 13 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
I
ITEM CONTRACT QUANTITIES NET NET UNIT
INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Crushed aggregate base
course;complete as
B-1340 specified Tons 140.00 139.00 -1.00 $17.00 $17.00
Adjust manholes and inlets;
B-1360 complete as specified Each 5.00 5.00 $386.00
Cold weather covering
j (concrete pavement)-single
visquine;complete as Square
B-1380 specified Yards 834.10 1 852.70 18.60 1 $0.01 $0.19
Cold weather covering
(concrete pavement)-double
visquine;complete as Square
B-1382 specified Yards 279.00 0.00 -279.00 $4.40 $1,227.60
Cold weather covering
(concrete pavement)-double
visquine with 6"hay; Square
B-1384 complete as specified Yards 1 279.00 0.00 1 -279.00 $11.00 $3,069.00
Up-charge for late season
cold weather concrete
pavement;complete as Cubic
B-1390 specified Yards 185.00 192.00 7.00 1 1 $11.00 $77.00
ADDITIONAL WORK REQUIRED:WORK UNIT B(BID ITEMS B-1120 -B-1390)-SUBTOTAL: $401.19 ($4,382.20)
NET DECREASE: ($3,981.01)
ALTERNATE 1
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Unclassified excavation; Cubic
1200-1 complete as specified Yards 900.00 135.96 -764.04 $28.00 $21,393.12
Turf restoration for
Meniominee Park asphalt
trail;Alternate 1;complete as Lump
1370A-1 ispecified Sum 1 1.00 1.00 1 $28,830.00
Base aggregate dense;3/4';
1800-1 complete as specified Tons 100.00 0.00 -100.00 $38.00 $3,800.00
Base aggregatedense;1 -
1801-1 1/4";complete as specified Tons 450.00 271.92 -178.08 $20.00 $3,561.60
Track coat;complete as
1900-1 specified Gallons 162.00 150.00 1 -12.00 $6.00 $72.00
4"asphaltic surface LT with
6"CABC and grading; Square
1916-1 complete as specified Yards 2,250.00 2,210.30 -39.70 $26.00 $1,032.20
Schedule 40 PVC;complete Linear
5130-1 as specified Feet 260.00 247.00 -13.00 $7.00 $91.00
Furnish and install 8 gauge
red-coated wire;complete as Linear
5250-1 specified Feet 2,170.00 2,219.00 49.00 $1.00 $49.00
Furnish and install 8 gauge
black-coated wire;complete Linear
5251-1 as specified Feet 2,170.00 2,219.00 49.00 $1.00 $49.00
Furnish and instal 8 gauge
green-coated wire;complete Linear
5252-1 as specified Feet 1 330.00 327.00 1 -3.00 $1.00 $3.00
Furnish and install 12 gauge
red-coated wire;complete as Linear
5270-1 specified Feet 120.00 100.00 -20.00 $1.00 $20.00
Furnish and install 12 gauge
black-coated wire;complete Linear
5271-1 as specified Feet 120.00 100.00 -20.00 $1.00 $20.00
Page 14 of 15
CONTRACT 19-04 CHANGE ORDER NO.#2(REVISED FINAL)
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Furnish and instil 12 gauge
green-coated wire;complete Linear
5272-1 as specified Feet 120.00 100.00 -20.00 $1.00 $20.00
Furnish and install fuse
5380-1 holder;complete as specified Each 12.00 10.00 -2.00 $52.00 $104.00
Furnish and install 5A fuse;
5392-1 complete as specified Each 1 12.00 10.00 -2.00 $5.00 $10.00
Install light pole and pole arm
and acorn pole top light;"City
Supplied";complete as
r5410-1 specified Each 6.00 5.00 -1.00 $515.00 $515.00
Furnish and install Type 5
5504-1 I base;complete as specified Each 6.00 1 5.00 1 1 -1.00 1 $773.00 $773.00
ALTERNATE 1 (BID ITEMS 1200-1 -5504-1)SUBTOTAL: $98.00 ($31,414.92)
NET DECREASE: ($31,316.92)
ADDITIONAL WORK REQUIRED:CO#2
ITEM CONTRACT QUANTITIES NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY INSTALLED INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
Remove and replace ball
field fence;complete as
2-20000 specified Each 0.00 1.00 1.00 $2,500.00 $2,500.00
R set new inlet;complete as Lump
2-20001 specified Sum 0.00 1.00 1.00 $1,549.29 $1,549.29
Time and materials 8-26
bypassing storm sewer; Lump
2-20002 complete as specified Sum 1 0.00 1.00 1.00 $1,320.00 $1,320.00
Time and materials cutting
manhole holes;complete as Lump
2-20003 specified Sum 0.00 1 1.00 1.00 $438.75 1 $438.75
Remove and replace 43 x 68
endwall with plate;complete
2-20004 as specified Each 0.00 1.00 1.00 $15,852.75 $15,852.75
Time and materials 9-3 539
Hazel storm lateral;complete Lump
2-20005 as specified Sum 0.00 1.00 1.00 $1,863.90 $1,863.90
Time and materials 6-3
cutting concrete collar; Lump
2-30000 1 complete as specified Sum 0.00 1.00 1.00 $2,240.00 $2,240.00
72"sanitary manhole; Vertical
2-30001 complete asspecified Feet 1 0.00 4.93 4.93 1 $582.00 $2,869.26
Sanitary manhole M6 wall; Lump
2-30002 complete as specified Sum 0.00 1.00 1.00 $2,500.00 $2,500.00
12"core into 6'manhole
2-30003 depth;complete as specified Each 0.00 1.00 1.00 $2,300.00 $2,300.00
3"water service casing; Linear
r
000 complete as specified Feet 0.00 10.00 10.00 $55.00 $550.00Cut hydrant;complete as
001 Ispecified Each 0.00 1.00 1.00 $575,00 $575.00
ADDITIONAL WORK CO#2(BID ITEMS 2-20000-2-40001)SUBTOTAL: $34,558.95 $0.00
NET INCREASE: $343558.95
NET DECREASE TO SECTION I: ($76,240.54)
NET DECREASE TO WORK UNIT A: ($9,228.92)
NET DECREASE TO WORK UNIT B: ($3,981.01)
NET DECREASE TO ALTERNATE 1: ($31,316.92)
NET INCREASE TO CO#2: $34,558.95
NET DECREASE TO CONTRACT: ($86,208.44)
Page 15 of 15