HomeMy WebLinkAbout0107483 BOSHKOSH
ON THE WATER
.lob.Address 1121 NEBRASKA ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner KAREN S WILLIAMS
Contractor OWNER
Category 111 - Single Family Addition
No 107483
Create Date 04/16/2004
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Constructing a 10' x 12' addition on the rear of the house. All work shall comply with applicable codes. The new walls shall be "tied" to
of Work [he existing walls at the top plate. A seperate permit is required for Elec and HVAC work.
HVAC Contractor OWNER
Electric Contractor HOMEOWNER
Fees: Valuation $11,200.00 Plan Approval
Issued By:
Plumbing Contractor
$0.00 Permit Fee Paid
Permit Voided
$84.00 Park Dedication $0.00
Date 04/16/2004 Final/O.P. 00/00/0000
Parcel Id # 0303010000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 1121 NEBRASKA ST
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.