Loading...
HomeMy WebLinkAbout0107479-Building SHKOSH ON THE WATER .lob.Address 1080 E SUNNYVlEW RD Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEL J/LISA GRUSCZYNSKI Contractor OWNER Category 142 - Decks, Patios, Ramps No 107479 Create Date 04/16/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Constructing a 10' x 30' deck off the front of the house. The deck shall be protected from prost with a minimum of 48" depth post holes. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $26.00 Park Dedication $0.00 Date 04/16/2004 Final/O.P. 00/00/0000 Parcel Id # 1560102300 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1080 E SUNNYVIEW RD OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST PROPERTY OWNER/CONTRACTOR: ~ CONSTRUCTION DATA: [] New Construction [] Addition TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) ZONING: [] Alteration x COMPLIANCE CHECKLIST DEFICIENT [] Use [] Lot Width [] Lot Area I--[ Lot Area Per Family [-I Flood Plain [] Front Yard [-'1 Front Yard Side Street DEFICIENT J~] Rear Yard [] Side Yards [] Building Area [] Parking Standards [] Off-Street Loading Standards [] Vision Clearance [] Transitional Yard Standards .DEFICIENT [] Landscape Standards [] Height [] Conditions of Approval [] Compliance with P.C. or BZA Conditions of Approval [] Signage Standards [] Mechanical Equip. Screening [] Parking Lot Lighting COMMENTS: REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or intedor work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. - APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: DATE: 2003