HomeMy WebLinkAbout06. 20-96 MARCH 10, 2020 20-96 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 20-06 TO AL
DIX CONCRETE, INC. FOR CONCRETE SIDEWALK (NEW AND
REHABILITATION) ($1,330,779.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for concrete
sidewalk (new and rehabilitation); and
WHEREAS,upon the opening and tabulation of bids, it appears that the following
is the most advantageous bid:
AL DIX CONCRETE, INC
401 Gertrude Street
Kaukauna, WI 54130
Total Bid: $1,330,779.00
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. Nos. 03110410-7480 Sidewalk Construction Fund Expenditures
03170410-7480-03304 Special Assessments Fund — Sidewalks
03210410-6806-04906 Contract Control— Sidewalk
05411867-6401-08673 Water Operating Budget—Mains
05411867-6401-08675 Water Operating Budget - Services
1
Cityo
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council �/ �
FROM: Justin Gierach, Engineering Division Manager/City Engineer �I l./i
DATE: March 5, 2020
RE: Award Bid for Public Works Contract No.20-06/
Concrete Sidewalk (New&Rehabilitation)
Al Dix Concrete, Inc./($1,330,779)
BACKGROUND
The purpose of this project is to repair existing sidewalks, driveway aprons,and handicap ramps;
install new sidewalks; and complete street or sidewalk repairs at Water Utility excavations. The
approximate boundary of the neighborhoods for sidewalk repair is north of East Irving
Avenue/Lincoln Avenue, east of Jackson Street/Harrison Street, west of Lake Winnebago, and
south of East Murdock Avenue/East Nevada Avenue. The 2019 program had an area bounded
by East Lincoln Avenue and Sterling Avenue on the north,Mount Vernon Street on the west,East
Irving Avenue on the south, and Lake Winnebago on the east that had to be removed from the
2019 program due to the shortage of available funds. This area will be included in the 2020
program.
ANALYSIS
There were two(2)bids received for the project. The low bid was received from Al Dix Concrete,
Inc. of Kaukauna, Wisconsin. The total bid is $1,330.779.
FISCAL IMPACT
Funding for the sidewalk rehabilitation portion of the project is in the 2020 Capital Improvements
Program(CIP) Sidewalk Section, including transfers from other projects that have come in under
budget. Funding for the Water Utility patches is included in the Water Utility Operating Budget.
Following is a summary of the available funds and the estimated total construction cost,including
ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees,
and other construction-related expenses. Property owners are invoiced for the cost of sidewalk
and driveway apron repairs abutting their property.
I:\Engineering\2020 CONTRACTS\20-06 Sidewalk f a e l of 2
Rehab\Project_Information\Correspondence\Memo\20-06 Memo for Bid Award 3-5-20.docx g
Estimated Total Construction
CIP Section CIP Funds Budgeted Cost
CIP-Sidewalk *$1,136,000 $1,135,890
Water Utility
Operating (See Note 1) $329,600 $329,538
Totals $1,465,600 $1,465,428
Note 1: Water Utility Operating Budget contains$376,500 for maintenance of Mains and Services. Only the amount
needed for repairing concrete pavement is shown as the funds are used for all maintenance items.
Note 2:the budget line item denoted with an asterisk(*)include budget transfers from other projects that have come
in under budget or are anticipated to come in under budget.
RECOMMENDATIONS
I recommend award to the low bidder, Al Dix Concrete, Inc.,for the amount of$1,330.779.
Approved:
(74
John Fitzpatrick
Assistant City Manager
Jc/tlt
I:\Engineering\2020 CONTRACTS\20-06 Sidewalk Page 2 of 2
Rehab\Project_Information\Correspondence\Memo\20-06 Memo for Bid Award 3-5-20.doc
Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Sid Opening: 03/02/2020 10:00 AM CST
Al Dix Concrete Inc Fischer-Ulman Construction,Inc.
401 Gertrude
Kaukauna,WI 54130
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Section 1: $1,330,779.00 $1,510,225.00
Removing concrete and
asphalt sidewalk and
driveway;complete as
1120 specified Square Feet 76,000.00 $2.00 $152,000.00 $2.50 $190,000.00
7"concrete pavement
removal and replacement;
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1308 complete ass ecified Square Yards 250.00 $71.00 $17,750,00 $80.00 $20,000,00
8"concrete pavement
removal and replacement;
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1318 complete asspecified Square Yards 2,000.00 $80.00 $160,000.00 $86.00 $172,000.00
8"concrete pavement HES
removal and replacement;
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1319 complete asspecified Square Yards 500.00 $86.00 $43,000,00 $91.00 $45,500,00
9"concrete pavement
removal and replacement;
including sawing;
pavement ties;dowel
bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1328 com lete ass ecified Square Yards 250.00 $91.00 $22,750.00 $99.00 $24,750.00
1/11111111 '1,onside.,-lkI—b� II C—I, n"e.d ia_2-zn P,g,1of4 3/3/2020
Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Sid Opening: 03/02/2020 10:00 AM CST
Al Dix Concrete Inc Fischer-Ulman Construction,Inc.
401 Gertrude
Kaukauna,WI 54130
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Adjust manholes and
inlets;complete as
1360 s iecified Each 10.00 $400.00 $4,000.00 $450.00 $4,500.00
Turf restoration,complete
1370 asspecified Square Yards 400.00 $12.00 $4,800.00 $15.00 $6,000.00
Cold weather covering
(concrete pavement)-
single visquine;complete
1380 asspecified Square Yards 400,001 $1.00 $400.00 $5.00 $2,000.00
Cold weather covering
(concrete pavement)-
double visquine;complete
1382 asspecified Square Yards 400.00 $1.00 $400.00 $6.50 $2,600.00
Cold weather covering
(concrete pavement)-
double visquine with 6'
1384 ha Complete asspecified Square Yards 100.00 $1.00 $100.00 $7.00 $700.00
Up-charge for late season
cold weather concrete
pavement;complete as
1390 specified Cubic Yards 500.00 $10.00 $5,000.00 $10.00 $5,000.00
12"radius curb with 6"
CABC and grading;
1410 complete asspecified Linear Feet 250.00 $16.00 $4,000.00 $13.25 $3,312.50
18"concrete curb and
gutter removal and
replacement;including
sawing;pavement ties;
dowel bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1428 complete ass ecified Linear Feet 200.00 $70.00 $14,000,00 $73.00 $14,600,00
24"concrete curb and
gutter removal and
replacement;including
sawing,pavement ties;
dowel bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1438 com lete ass ecified Linear Feet 800.00 $70.00 $56,000.00 $73.00 $58,400.00
e�e,,K ���,Kpn:n cor,iieAcra�an-nnsae.,-�ik ae b� II CI, n"B.e is_2-zn Page2of4 3/3/2020
Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Sid Opening: 03/02/2020 10:00 AM CST
Al Dix Concrete Inc Fischer-Ulman Construction,Inc.
401 Gertrude
Kaukauna,WI 54130
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
30"concrete curb and
gutter removal and
replacement;including
sawing;pavement ties;
dowel bars;bond breaker;
integral curb and fine
grading;turf restoration;
and traffic control;
1448 complete ass ecified Linear Feet 400.00 $70.00 $28,000,00 $73.00 $29,200,00
Sidewalk curb;complete
1460 ass ecified Linear Feet 100.00 $70.00 $7,000.00 $71.00 $7,100.00
4"concrete sidewalk with
3"CABC and grading;
1500 complete asspecified Square Feet 51,830.00 $5.10 $264,333.00 $5.75 $298,022.50
4"concrete sidewalk with
3"CABC and grading;in
existing subdivisions and
new walk ordered in;
1500A complete ass ecified Square Feet 18,010.00 $6.10 $109,861.00 $6.50 $117,065.00
4"concrete sidewalk with
3"CABC and grading;
water dept.locations;
1502 complete ass ecified Square Feet 1,500.00 $9.00 $13,500.00 $9.75 $14,625.00
6"concrete sidewalk/
driveway/ramp with 3"
CABC and grading;
1510 complete ass ecified Square Feet 23,900.00 $5.85 $139,815.00 $6.75 $161,325.00
6"concrete sidewalk/
driveway/ramp with 3"
CABC and grading;water
dept.locations;complete
1512 ass ecified Square Feet 1,000.00 $10.00 $10,000.00 $11.00 $11,000.00
8"concrete sidewalk/
driveway/ramp with 3"
CABC and grading;
1520 complete ass ecified Square Feet 500.00 $8.50 $4,250.00 $9.25 $4,625.00
Curb ramp detectable
warning field
(natural/non-painted);
1540 com lete ass ecified Square Feet 498.00 $40.00 $19,920.00 $50.00 $24,900.00
1/11111111 '1,onside.,-lkI—b� II C—I, n"B.e I _2-zn P,ge 3 of 3/3/2020
Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 03/02/2020 10:00 AM CST
Al Dix Concrete Inc Fischer-Ulman Construction,Inc.
401 Gertrude
Kaukauna,WI 54130
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
No.4 reinforcing rods-
deformed;epoxy-coated;
1550 complete ass ecified Linear Feet 500.00 $4.00 $2,000.00 $3.50 $1,750.00
Drilled No.4 sidewalk tie
bars-deformed;epoxy-
coated;complete as
1560 specified Each 10,000.00 $10.00 $100,000.00 $11.00 $110,000.00
Cold weather covering
(sidewalk)-single
visquine;complete as
1580 specified Square Feet 1,000.00 $1.00 $1,000.00 $1.50 $1,500.00
Cold weather covering
(sidewalk)-double
visquine;complete as
1582 specified Square Feet 1,000.00 $1.00 $1,000.00 $2.50 $2,500.00
Cold weather covering
(sidewalk)-double
visquine with 6"hay;
1584 complete asspecified Square Feet 1,000.00 $1.00 $1,000.00 $3.50 $3,500.00
Up-charge for late season
cold weather concrete
sidewalk,complete as
1590 specified Cubic Yards 500.00 $10.00 $5,000.00 $10.00 $5,000.00
Sawing existing
pavement;complete as
1700 s ecified Linear Feet 3,000.00 $8.00 $24,000.00 $9.00 $27,000.00
Profile saw cut concrete
curb;complete as
1720 specified Linear Feet 150.00 $70.00 $10,500,00 $75.00 $11,250,00
5"asphaltic surface MT
with 6"CABC and
grading;complete as
1915 specified Square Yards 250.00 $80.00 $20,000,00 $95.00 $23,750,00
4"asphaltic surface LT
with 6"CABC and
grading;complete as
1916 specified Square Yards 500.00 $80.00 $40,000,00 $95.00 $47,500,00
Break bottom of vault;
1990 com lete ass ecified Square Feet 2,000.00 $15.00 $30,000,00 $20.00 $40,000,00
Removal of vault wall;
1991 com lete ass ecif ed Linear Feet 350.00 $44.00 $15,400,00 $55.00 $19,250,00
Bid Total: $1,330,779.00 $1,510,225.00