Loading...
HomeMy WebLinkAbout06. 20-96 MARCH 10, 2020 20-96 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 20-06 TO AL DIX CONCRETE, INC. FOR CONCRETE SIDEWALK (NEW AND REHABILITATION) ($1,330,779.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for concrete sidewalk (new and rehabilitation); and WHEREAS,upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: AL DIX CONCRETE, INC 401 Gertrude Street Kaukauna, WI 54130 Total Bid: $1,330,779.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. Nos. 03110410-7480 Sidewalk Construction Fund Expenditures 03170410-7480-03304 Special Assessments Fund — Sidewalks 03210410-6806-04906 Contract Control— Sidewalk 05411867-6401-08673 Water Operating Budget—Mains 05411867-6401-08675 Water Operating Budget - Services 1 Cityo Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council �/ � FROM: Justin Gierach, Engineering Division Manager/City Engineer �I l./i DATE: March 5, 2020 RE: Award Bid for Public Works Contract No.20-06/ Concrete Sidewalk (New&Rehabilitation) Al Dix Concrete, Inc./($1,330,779) BACKGROUND The purpose of this project is to repair existing sidewalks, driveway aprons,and handicap ramps; install new sidewalks; and complete street or sidewalk repairs at Water Utility excavations. The approximate boundary of the neighborhoods for sidewalk repair is north of East Irving Avenue/Lincoln Avenue, east of Jackson Street/Harrison Street, west of Lake Winnebago, and south of East Murdock Avenue/East Nevada Avenue. The 2019 program had an area bounded by East Lincoln Avenue and Sterling Avenue on the north,Mount Vernon Street on the west,East Irving Avenue on the south, and Lake Winnebago on the east that had to be removed from the 2019 program due to the shortage of available funds. This area will be included in the 2020 program. ANALYSIS There were two(2)bids received for the project. The low bid was received from Al Dix Concrete, Inc. of Kaukauna, Wisconsin. The total bid is $1,330.779. FISCAL IMPACT Funding for the sidewalk rehabilitation portion of the project is in the 2020 Capital Improvements Program(CIP) Sidewalk Section, including transfers from other projects that have come in under budget. Funding for the Water Utility patches is included in the Water Utility Operating Budget. Following is a summary of the available funds and the estimated total construction cost,including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. Property owners are invoiced for the cost of sidewalk and driveway apron repairs abutting their property. I:\Engineering\2020 CONTRACTS\20-06 Sidewalk f a e l of 2 Rehab\Project_Information\Correspondence\Memo\20-06 Memo for Bid Award 3-5-20.docx g Estimated Total Construction CIP Section CIP Funds Budgeted Cost CIP-Sidewalk *$1,136,000 $1,135,890 Water Utility Operating (See Note 1) $329,600 $329,538 Totals $1,465,600 $1,465,428 Note 1: Water Utility Operating Budget contains$376,500 for maintenance of Mains and Services. Only the amount needed for repairing concrete pavement is shown as the funds are used for all maintenance items. Note 2:the budget line item denoted with an asterisk(*)include budget transfers from other projects that have come in under budget or are anticipated to come in under budget. RECOMMENDATIONS I recommend award to the low bidder, Al Dix Concrete, Inc.,for the amount of$1,330.779. Approved: (74 John Fitzpatrick Assistant City Manager Jc/tlt I:\Engineering\2020 CONTRACTS\20-06 Sidewalk Page 2 of 2 Rehab\Project_Information\Correspondence\Memo\20-06 Memo for Bid Award 3-5-20.doc Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Sid Opening: 03/02/2020 10:00 AM CST Al Dix Concrete Inc Fischer-Ulman Construction,Inc. 401 Gertrude Kaukauna,WI 54130 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: $1,330,779.00 $1,510,225.00 Removing concrete and asphalt sidewalk and driveway;complete as 1120 specified Square Feet 76,000.00 $2.00 $152,000.00 $2.50 $190,000.00 7"concrete pavement removal and replacement; including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1308 complete ass ecified Square Yards 250.00 $71.00 $17,750,00 $80.00 $20,000,00 8"concrete pavement removal and replacement; including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1318 complete asspecified Square Yards 2,000.00 $80.00 $160,000.00 $86.00 $172,000.00 8"concrete pavement HES removal and replacement; including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1319 complete asspecified Square Yards 500.00 $86.00 $43,000,00 $91.00 $45,500,00 9"concrete pavement removal and replacement; including sawing; pavement ties;dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1328 com lete ass ecified Square Yards 250.00 $91.00 $22,750.00 $99.00 $24,750.00 1/11111111 '1,onside.,-lkI—b� II C—I, n"e.d ia_2-zn P,g,1of4 3/3/2020 Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Sid Opening: 03/02/2020 10:00 AM CST Al Dix Concrete Inc Fischer-Ulman Construction,Inc. 401 Gertrude Kaukauna,WI 54130 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Adjust manholes and inlets;complete as 1360 s iecified Each 10.00 $400.00 $4,000.00 $450.00 $4,500.00 Turf restoration,complete 1370 asspecified Square Yards 400.00 $12.00 $4,800.00 $15.00 $6,000.00 Cold weather covering (concrete pavement)- single visquine;complete 1380 asspecified Square Yards 400,001 $1.00 $400.00 $5.00 $2,000.00 Cold weather covering (concrete pavement)- double visquine;complete 1382 asspecified Square Yards 400.00 $1.00 $400.00 $6.50 $2,600.00 Cold weather covering (concrete pavement)- double visquine with 6' 1384 ha Complete asspecified Square Yards 100.00 $1.00 $100.00 $7.00 $700.00 Up-charge for late season cold weather concrete pavement;complete as 1390 specified Cubic Yards 500.00 $10.00 $5,000.00 $10.00 $5,000.00 12"radius curb with 6" CABC and grading; 1410 complete asspecified Linear Feet 250.00 $16.00 $4,000.00 $13.25 $3,312.50 18"concrete curb and gutter removal and replacement;including sawing;pavement ties; dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1428 complete ass ecified Linear Feet 200.00 $70.00 $14,000,00 $73.00 $14,600,00 24"concrete curb and gutter removal and replacement;including sawing,pavement ties; dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1438 com lete ass ecified Linear Feet 800.00 $70.00 $56,000.00 $73.00 $58,400.00 e�e,,K ���,Kpn:n cor,iieAcra�an-nnsae.,-�ik ae b� II C­I, n"B.e is_2-zn Page2of4 3/3/2020 Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Sid Opening: 03/02/2020 10:00 AM CST Al Dix Concrete Inc Fischer-Ulman Construction,Inc. 401 Gertrude Kaukauna,WI 54130 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 30"concrete curb and gutter removal and replacement;including sawing;pavement ties; dowel bars;bond breaker; integral curb and fine grading;turf restoration; and traffic control; 1448 complete ass ecified Linear Feet 400.00 $70.00 $28,000,00 $73.00 $29,200,00 Sidewalk curb;complete 1460 ass ecified Linear Feet 100.00 $70.00 $7,000.00 $71.00 $7,100.00 4"concrete sidewalk with 3"CABC and grading; 1500 complete asspecified Square Feet 51,830.00 $5.10 $264,333.00 $5.75 $298,022.50 4"concrete sidewalk with 3"CABC and grading;in existing subdivisions and new walk ordered in; 1500A complete ass ecified Square Feet 18,010.00 $6.10 $109,861.00 $6.50 $117,065.00 4"concrete sidewalk with 3"CABC and grading; water dept.locations; 1502 complete ass ecified Square Feet 1,500.00 $9.00 $13,500.00 $9.75 $14,625.00 6"concrete sidewalk/ driveway/ramp with 3" CABC and grading; 1510 complete ass ecified Square Feet 23,900.00 $5.85 $139,815.00 $6.75 $161,325.00 6"concrete sidewalk/ driveway/ramp with 3" CABC and grading;water dept.locations;complete 1512 ass ecified Square Feet 1,000.00 $10.00 $10,000.00 $11.00 $11,000.00 8"concrete sidewalk/ driveway/ramp with 3" CABC and grading; 1520 complete ass ecified Square Feet 500.00 $8.50 $4,250.00 $9.25 $4,625.00 Curb ramp detectable warning field (natural/non-painted); 1540 com lete ass ecified Square Feet 498.00 $40.00 $19,920.00 $50.00 $24,900.00 1/11111111 '1,onside.,-lkI—b� II C—I, n"B.e I _2-zn P,ge 3 of 3/3/2020 Contract 20-06-Concrete Sidewalk(New and Rehabilitation)(#6730756) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Bid Opening: 03/02/2020 10:00 AM CST Al Dix Concrete Inc Fischer-Ulman Construction,Inc. 401 Gertrude Kaukauna,WI 54130 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension No.4 reinforcing rods- deformed;epoxy-coated; 1550 complete ass ecified Linear Feet 500.00 $4.00 $2,000.00 $3.50 $1,750.00 Drilled No.4 sidewalk tie bars-deformed;epoxy- coated;complete as 1560 specified Each 10,000.00 $10.00 $100,000.00 $11.00 $110,000.00 Cold weather covering (sidewalk)-single visquine;complete as 1580 specified Square Feet 1,000.00 $1.00 $1,000.00 $1.50 $1,500.00 Cold weather covering (sidewalk)-double visquine;complete as 1582 specified Square Feet 1,000.00 $1.00 $1,000.00 $2.50 $2,500.00 Cold weather covering (sidewalk)-double visquine with 6"hay; 1584 complete asspecified Square Feet 1,000.00 $1.00 $1,000.00 $3.50 $3,500.00 Up-charge for late season cold weather concrete sidewalk,complete as 1590 specified Cubic Yards 500.00 $10.00 $5,000.00 $10.00 $5,000.00 Sawing existing pavement;complete as 1700 s ecified Linear Feet 3,000.00 $8.00 $24,000.00 $9.00 $27,000.00 Profile saw cut concrete curb;complete as 1720 specified Linear Feet 150.00 $70.00 $10,500,00 $75.00 $11,250,00 5"asphaltic surface MT with 6"CABC and grading;complete as 1915 specified Square Yards 250.00 $80.00 $20,000,00 $95.00 $23,750,00 4"asphaltic surface LT with 6"CABC and grading;complete as 1916 specified Square Yards 500.00 $80.00 $40,000,00 $95.00 $47,500,00 Break bottom of vault; 1990 com lete ass ecified Square Feet 2,000.00 $15.00 $30,000,00 $20.00 $40,000,00 Removal of vault wall; 1991 com lete ass ecif ed Linear Feet 350.00 $44.00 $15,400,00 $55.00 $19,250,00 Bid Total: $1,330,779.00 $1,510,225.00 e�e,,K ,�,Kpn:n coriiaAcis�xn-nnsee.,-ik I c­,­, n"e.d I _2-zn Page4of4 3/3/2020