HomeMy WebLinkAbout0107478-Building (fence)ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION:
PRO PE RTY~'~C O NTRACTOR:
CONSTRUCTION DATA: J~ New Construction [] Addition
T~PE O~F CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
COMPLIANCE CHECKLIST
ZONING:
[] Alteration
DEFICIENT
DEFICIENT
DEFICIENT
Use
Lot Width
Lot Area
Lot Area Per Family
r-[ Flood Plain
[] Fron~ Yard
[] Fron~ Yard Side Street
[] Rear Yard
[] Side Yards
[] Building Area
[] Parking Standards
[] Off-Street Loading Standards
[] Vision Clearance
[] Transitional Yard Standards
[--I Landscape Standards
[] Height
[] Conditions of Approval
[] Compliance with P.C. or
BZA Conditions of Approval
[] Signage Standards
[] Mechanical Equip. Screening
[] Parking Lot Lighting
COMMENTS:
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the following: (I) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
Plan Cor~ission Action Required'
Variance(s) Required
-- RIEVIEWED BY: ~v~-~
DENIED
2003