Loading...
HomeMy WebLinkAbout0122721-Plumbing (water softener) i � CITY OF OSHKOSH No 122721 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 313 315 KNAPP ST Owner RONALD UCYNTHIA K BAEHMAN Create Date 07/26/2006 Contractor CULLIGAN WATER CONDITIONING Category 410-Residential-Interior Plan Bathtub Shower Water Softner 1 Wait.St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res.Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Sery Sink Soda Disp Misc. Fixtures Use/Nature DUPLEX(313)/INSTALL WATER SOFTNER — -------- — ____ of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 0608720100 Valuation $350.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Perrnit Voided� _ __ _ --- -- , Issued By( ) Y 1 1�J Date 11/29/2006 � In the performance of this work,I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perforrn the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 405 PROSPECT AVE N FOND DU LAC WI 54937 - 1498 Telephone Number 235-1490 OR 233-05 To schedule inspections please call the Inspection Request line at 236-5128 noting the Add�ess, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.