Loading...
HomeMy WebLinkAboutItem 3 - 831 Washington Ave – Rehabilitation Work - CombinedDE RS CONSTRUCTION, INC. Bailey -Binder, 2/14/2020 01000 GENERAL CONDITIONS 1-250 Weather Protection & Security Snow removal on construction site during construction Temporary weather enclosures Temporary service door, rear entry Temporary ground frost protection 1-304 Consumables Includes miscellaneous items purchased or taken from warehouse stock that is used in the course of the project and cannot be reused or returned, such as: saw blades, drill bits, fasteners, etc. 1-312 Field Supervision Superintendent labor for overseeing trade partners, suppliers, schedule, progress meetings, safety, layout, etc. 1-410 Construction Permits and Fees Building permit Demolition permit Plumbing permit HVAC permit Electrical permit See Selection Worksheet Contract Allowances 1-510 Temporary Utilities Temporary Toilet Facility Note: Owner is responsible for gas consumption during construction, including temporary heat Note: Owner is responsible for electrical consumption during construction 1-540 Construction Equip/Scaffolding Includes but not limited to labor, material and equipment costs associate with scaffolding, forklifts, cranes and boom lift use on the project site Note: Trade partners are responsible for providing their own equipment, safety precautions and costs associated with them 1-580 Project Identification/Sign DeLeers will provide signage onsite to identify jobsite and safety information 1-730 Construction Dumpster DeLeers to supply dumpster or legally dispose of construction debris 1-740 Project Cleaning Weekly housekeeping to keep the jobsite clean and safe Final cleaning: washing hard surface floors, wash cabinets and counter tops, wash windows inside and out, wash all plumbing fixtures, vacuum carpets, dust walls and ceilings, sweep crawl space/basement and wipe down mechanical equipment Note: Duct cleaning is not included but can be quoted at the owners request 1-780 Project Close Out Documents Provide electronic project documents of care and maintenance instructions and operations and maintenance manuals General Notes: DeLeers Safety Note: All trade partners and supplies are responsible to meet all OSHA policies and DeLeers Safety policies, if you do not have a copy please contact our office Standard colors for all selections unless specified 02000 SITEWORK 2-075 Concrete Removal/Demolition Saw cut and remove concrete floor slab at Lower Level and foundation wall opening 2-225 Selective Demolition Selective demolition of doors, windows, walls, floor coverings, ceilings, masonry, siding, roofing, interior finishes, casework etc. as noted on plan. 2-226 Hazardous Materials Abatement Abatement of hazardous materials such as asbestos and lead paint will be contracted by owner 2-315 Excavation and Fill Selective demolition of garage, two story sunroom, and section of drive as noted on plan. Site Clearing Tree as required for new garage Wood fence off corner of existing garage. Not perimeter fence. Erosion Control Per Code Excavate for foundation, driveways and walks per plan Excavate for 8" clean stone under basement slab. Furnished and installed by foundation contractor Excavate for garage slab Backfill Foundation Compacted granular fill Patios and sidewalks 6" compacted granular fill Driveways 8" of 3/4" crushed gravel Garage Compacted granular fill Top Soil Remove stockpile and reinstall after rough grading is complete Finish grade 6" top soil thickness import/export as needed 2-505 Site Utilities Water Line New 1-1/2" water line Note: Water trade partner to be responsible for application and cost of permit Note: Water trade partner to be responsible for tapping line at the street if needed and asphalt or concrete patching if needed Note: Water trade partner to be responsible for stubbing water line 5' into basement Sanitary Sewer Existing sewer line Public Utilities Existing electric and gas service 2-820 Fences & Gates Fences and gates Existing 2-905 Landscaping Note: Owner is responsible for design, coordination and installation 03000 CONCRETE 3-310 Cast in Place Concrete Foundations Footings per plan Wall size per plan Tar Damproofing Reinforcements Per plan 2 #4's horizontal on top and bottom of wall Drain Tile Wash stone with socked tile Provide and install 2" rigid foundation foam on walls Note: Concrete trade partner is responsible for determining if a pump or conveyer is needed Note: Bentonite water stop or equivalent to be used at all concrete cold joints Note: Concrete trade partners is responsible for all anchor bolts 3-320 Cast in Place Slab on Grade Basement 4" concrete, no reinforcement, machine trowel finish Furnished and install 8" clean stone under basement slab Emil vapor barrier, lap and tape seams and install per code Insulation 2" rigid insulation Radon sealed sump pit Interior tile at addition and excavated area of existing basement 3-320 Cast in Place Slab on Grade Continued Garage 4" concrete, reinforced, with #4 rebar 2' on center both ways, 18"x12" thickened edge with 2 - #5 rebar continuous, machine trowel finish Pitched to floor drains Driveway 4" concrete, reinforced, with #4 rebar 2' on center both ways, broom finish Control joints Saw cut Note: Excavator to have grade plus or minus 1 ", any additional fill by flatwork trade partner 04000 GENERAL MASONRY 4-200 Masonry Masonry Veneer See Selection Worksheet 04-A Masonry Veneer Fireplaces See Selection Worksheet 04-B Fireplaces 06000 WOOD & PLASTICS 6-100 Rough Carpentry Floor system Floor System Material Dimensional lumber Wood I -Joists Deflection rating L/360 Note: Supplier is responsible for specifying size of floor system per plan and span Note: Dimensional lumber floor system to include hangers, bridging, solid blocking, box joists and floor system beams. Note: Floor system supplier is responsible for supplying all hangers, strong backs, ribbon material, and floor system beams. Note: Floor system supplier is responsible for supplying loose framing lumber to complete floor systems Note: Notify general contractor two days prior to bid if there is any areas that will not be framed with trusses. If this notification is not received we will assume that all areas will be trussed. Subfloor OSB 100 day no sand 3/4" T&G Wall Construction Options Onsite framing Air barriers Block -It House Wrap, 1 layer Headers per plan Roof system Note: Roof system supplier is responsible valley trusses, hip trusses, sheeted gables, beams, hangers, and hurricane screws. Note: Notify general contractor two days prior to bid if there is any areas that will not be framed with trusses. If this notification is not received we will assume that all areas will be trussed. Note: Truss supplier is responsible for supplying loose framing lumber to complete truss systems. Note: Truss supplier is responsible for truss system engineering. Roof sheathing 5/8" OSB Note: Lumber supplier is responsible for supplying all H-clips. Sub fascia Note: 2x material as specified by plans Framing trade partner Note: Framing labor needed per plans to include: fasteners, material handling, crane, FHA posts, backing for draft stops, toilet accessory backing, frieze board details, soffit details, wind sheer bracing, eye brow framing Note: House wrap/weather barrier installed per manufactures installation guide. 6-210 Finish Carpentry Interior Trim see Selection Worksheet 06-A Interior Trim Fireplace Surrounds see Selection Worksheet 04-B Fireplaces 6-300 Porches, Decks & Railing See Selection Worksheet 06-D Decks & Railings 6-410 Cabinets and Casework Fireplace Surrounds see Selection Worksheet 04-B Fireplaces Cabinetry per design meeting See Selection Worksheet Contract Allowances 07000 MOISTURE/THERMAL CONTROL 7-210 Building Insulation See Selection Worksheet 07-A Insulation 7-310 Asphalt Shingles See Selection Worksheet 07-B Roofing Roof underlayment Roofing trade partner to furnish and install warranted roofing underlayment system per selected roofing material, with a minimum of Triflex 30 or equal underlayment Note: Sidewall to be flashed with step flashings (kick out flashing at the bottom of sidewall). Note: Headwall to be flashed with custom bent 5x6. Note: All valleys to be a w-valley with open cuts (1" open at the top of valley, tapered to 2" at the bottom of valley). Note: All valley flashing at crickets to be a minimum of 3" beyond sidewall. Note: Roofing trade partner to supply all fasteners (including copper nails if copper flashings are used). 7-460 Siding See Selection Worksheet 07-C Siding & Columns 7-500 Membrane Roofing See Selection Worksheet 07-B Roofing 7-621 Aluminum Soffit & Fascia See Selection Worksheet 07-D Gutters Fascia & Soffit 7-623 Aluminum Gutters & Downspouts See Selection Worksheet 07-D Gutters Fascia & Soffit 7-920 Joint Sealants Caulk windows, doors, overhead doors and exterior penetrations per manufactures specifications All windows, doors, overhead doors, penetrations and control joints should have a 3/16" minimum air space for caulk 08000 DOORS & WINDOWS 8-010 Residential Doors and Frames See Selection Worksheet 08-AA Doors & Hardware Note: Trade partner is responsible for verifying egress, natural light, vent and tempered glass codes 8-360 Overhead Doors See Selection Worksheet 08-AAA OH Doors 8-550 Wood Windows & Patio Doors See Selection Worksheet 08-B Pella Note: Trade partner is responsible for verifying egress, natural light, vent and tempered glass codes 8-710 Door Hardware See Selection Worksheet 08-AA Doors & Hardware 8-810 Glass & Glazing See Selection Worksheet 08-AA Doors & Hardware 8-830 Mirrors Framed mirror by owner at Powder Room 102 Custom plate mirrors to width of vanities at balance of Powder Rooms and Bathrooms, by DeLeers 09000 FINISHES 9-210 Gypsum Board & Plaster See Selection Worksheet Room Finish Selections Note: Plaster trade partner to inform DeLeers if dehumidification and heating equipment is needed 9-310 Floor & Wall Tile See Selection Worksheet Room Finish Selections See Selection Worksheet Room Finish Plan, Flooring See Selection Worksheet Room Finish Plan, Wall & Ceiling Note: Installer to include all underlayments, setting materials, grouts and sealers. Note: All showers to include full warranted install; Schluter, Wedi or equal. Fireplace Surround & Hearth See Selection Worksheet 04-B Fireplaces 9-640 Wood Flooring See Selection Worksheet Room Selections See Selection Worksheet Room Finish Plan, Flooring Note: Flooring trade partner to include wood stair nosing and finishing. Note: Flooring trade partner to sand and finish in place floors, include re -finishing of stair treads and landings. 9-650 Resilient Flooring & Base See Selection Worksheet Room Selections See Selection Worksheet Room Finish Plan, Flooring Note: Include all underlayments, adhesives and install labor 9-680 Carpeting See Selection Worksheet Room Selections See Selection Worksheet Room Finish Plan, Flooring 9-900 Painting Interior Trim see Selection Worksheet 06-A Interior Trim See Selection Worksheet 06-D Decks & Railings See Selection Worksheet 08-AA Doors & Hardware See Selection Worksheet 08-AAA OH Doors See Selection Worksheet Room Finish Selections Note: Painting trade partner is responsible for protecting installed surfaces, finishes and equipment (cover floors, cabinets, etc.) 10000 SPECIALTIES 10-185 Shower Partitions See Selection Worksheet 08-AA Doors & Hardware 10-305 Fireplaces See Selection Worksheet 04-B Fireplaces Note: HVAC trade partner is responsible for running gas lines 10-670 Storage Shelving Furnish and install plywood shelving at Mechanical/Storage Room. Shelf at floor level to be built-up off of floor with treated 2x4's, 2x2 wood wall cleats, 4- 2' deep plywood shelves, 1 x4 vertical supports at front edge of shelves. 10-810 Toilet Accessories See Selection Worksheet Contract Allowances 10-900 Closet Specialties Schulte melamine shelving or equal Note: trade partner to submit drawings with quote 11000 EQUIPMENT 11-451 Appliances See Selection Worksheet Contract Allowances Appliances to be owner purchased; DeLeers Construction to coordinate selections, obtain appliance specifications, schedule and supervise installation with vendor 15000 MECHANICAL 15-300 Fire Protection Design, furnish, install, and test a new wet pipe residential fire protection system for all of 3rd Floor and stairs (path of egress) to door at grade. Flush sprinkler heads. 15-400 Plumbing See Selection Worksheet 15-B Plumbing Fixtures Able See Selection Worksheet 15-B Plumbing 15-500 HVAC See Selection Worksheet 15-C HVAC 16000 ELECTRICAL 16-100 Electrical See Selection Worksheet 16-B Electrical h W ON 0. A o � a � w � � z a, o a.tloo z ate_ a, o a.S'o� o °. M � � y �ZZ: s tb O i 'cs Q a U o o� o O c o woo s,aalap 0ISS-LVE-ON d T06b6l kN q-1yo ate. V v.i! u.! aem I fs SLLbS IM'aiad a0 V allnS'awa zl!wIN SM 7N1 �N011 nIUSNO3 Oe0 3 ION iHmaAao aauapisa-d aapulq ajiTeg S w o I-1 11 IN III J .3 aj� 00 00 —liF z Li m �� x J �o a JG — J w S � Y Z Z — < p o'l --------------- -- F-fir-7r 7r r 7r 7r -fir wl N' I II II II it II II II I wZ z c II<ZII II TI W�W'� 40- �zl I II II — rc3K �� I II II II II II II —I "b F6 . o o roc w r > w wwJ O = - ane-,e - �zn z x woo --l-P 018SIVI'M d T 06f,6 lkN qsolqso anuaA-V ..i!.!y.Ak I f s SMIS ':)NI 'NO nnldISNO3 Oe0_A;ll ON IH9 dO D azmapisa-d j5pulqA5puq S1199190 woo waalap oaeseaI'M d TO6b6l kN gsolgso anuaAV v.i! u.! .Ak I fs SMIS IM'aiad a0 V al!n5 anus zl!w!N SZBI '7N1 'N01nnld1SNO3 Oe0 ;IlONIH9 dOD aauapisa-d aapulg- 5puq S 1i 9 9 �19 Q — — an°waa ILLI ul I 1 = I t 0 Iw� IL 1I � II L= I F 7I F Fl r--1r-7r' 7r-1r-7r,—,7r-1r IL 1L 1L 1L \L 1Lpl1L \L _� II / IIII IIII Illls II II I — ----->----- Ik—— — — — — — — — — — — R—— — — — — — — — — — — Q � I I I� i p 2 i�i �=-emu III wog 1-1-P O£BSL4£'OM d SLIVS IM —d ap y-41IS'-11C] z41WIN SM 'JNI 'Noujn'dISNOJ Sli33a3Q TOMS it11 `4soyq,o ifs aauapisa-d aapu!q al!uq ss aie ozaz AO 1H9121 d0]„ won vaalap O£BSL4£'OU d SLIVS IW—d ap y a�in5'ani�4 z41WIN SM '7N1 'NOI13f1211SNO3 Su33%-/I3Q TObbs it11 `4soyq,o ifs aauapisa-daapulg- al!uq ss aie ozaz AO 1H9121 d0]„ won vaalap O£BSL4£'OU d SLIVS IW—d ap y a�in5'ani�4 z41WIN SM '7N1 'NOI13f1211SNO3 Su33%-/I3Q TObbs it11 `4soyq,o ifs aauapisa-daapulg- al!uq ss aie ozaz AO 1H9121 d0]„ won vaalap O£BSL4£'OU d SLIVS IW—d ap y a�in5'ani�4 z41WIN SM '7N1 'NOI13f1211SNO3 Su33%-/I3Q TObbs it11 `4soyq,o ifs aauapisa-daapulg- al!uq ss aie ozaz AO IH9121 d0]„ w 0 0o W- SJDOIOP OISTLIVOU d T06f,5 lkN,qsolqso anuaA-V..i!.!y.Ak I fs SLIVS IW—d &CI V z41WIN SM 'NO i3nHISNO3 Oe0_A;ll ON IH9 dO D azmapisa-d -i5pulqA5puq S1199190 W- SJDOIOP OISTLIVOU d SLIVS IW—d &CI V z41WIN SM *3NI 'NOl13n211SNO3 sugg%-/Igo TOM,s azmaplsa-d.lapulq Xal!uq AO ION IH9 21 dOD 1 Ul 2 N", wog —alaP OISSI4£'ON d SUBS IM'aiad a0 V-1MS'anPO zl!-!N SM '7N1 'NOU:)n'I1SNO3 Su33l3Q 1005 IM 'y OWO 3nu3AV u-laull-A� I CS aauapisa-d aapujq ajipg s aie««sz INN Sad .30110N 1HOINAd00. W LU Z 0 Z_ 2 Q 3 z U wog —alaP 0£BSL4£'ON d SMIS IM'aiad a0 V allnS'anPO zl!-!N SM '7N1 'Nou:)n'I1SNO3 Su33l3Q IOMIS 1M V-11 sO anuany--2- -AN IfS aauapTsa� �apuig- aii�g ias aie o°ieez .30110N1HOIHAd00• 1 o hL-J� w 0 m won vaalap O£BSL4£'OU d SLIVS IW—d ap y a�in5'ani�O z41WIN SM '7N1 'NOI13f1211SNO3 Su33%-/I3Q 106b5 ]t11 `veOygsQ a�naoy voazunlsem i F8 aauapisa-d japing- ajiTeg ssaie ozaz „3JIlON 1H9121 AdOD, 0 -------------- ------------- 0 w U) 0 m won vaalap O£BSL4£'OU d SLIVS IW—d ap y a�in5'ani�O z41WIN SM '7N1 'NOI13f1211SNO3 Su33%-/I3Q 106b5 ]t11 `veOygsQ a�naoy voazunlsem i F8 aauapisa-d japing- ajiTeg ssaie ozaz „3JIlON 1H9121 AdOD, woo --laP 0£BSL4f'ON d I OM IS IM ` -11Tp anuany --N- -AN I CS =_ SM75 IM'aiad a0 V al!n5'an �O zl!w!N SZBL ..p .,. 7N1 'NOI17f1'd1SN07 33uaplsa'a japuTg- aiTL'g O1e °�` zOZ ; NiH�a°No�53O S u 3 3 �l 3 Q .d �0 Sad ;9 P .—S.a 5 x w ���ssaaowo E &$wU- Fcf M a JLH ill ql ICI � II IL 11 1111111111111 w ) M W