Loading...
HomeMy WebLinkAbout0107428-Building (siding)OSHKOSH ON THE WATER .lob Address 832 W 9TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CRAIG R PASKE Contractor OWNER Category 141 - Exterior Remodeling No 107428 Create Date 04/14/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Covering existing wood siding with vinyl siding. The lights will be left in place and sided around old fixtures. Quality Installations will be of Work doing the work. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $8,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $62.00 Park Dedication $0.00 Date 04/14/2004 Final/O.P. 00/00/0000 Parcel Id # 0605800000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 5715 GREEN VALLEY RD Agent/Owner OSHKOSH WI 54904 - 9700 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.