Loading...
HomeMy WebLinkAbout06. 20-66 FEBRUARY 25, 2020 20-66 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID TO FERGUSON WATERWORKS AND AUGUST WINTER AND SONS INC. FOR FOUR (4) GATE VALVES AND INSTALLATION FOR WASTEWATER DIVISION ($184,100.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for replacement of four (4) American Flow Control Series 2500 30" gate valves and installation of the water valves at the Wastewater Plant; and WHEREAS,upon the opening and tabulation of bids, it appears that the following are the most advantageous bids: FERGUSON WATERWORKS 5350 N Richmond Street Appleton, WI 54913 Total Bid Gate Valves: $117,300.00 and AUGUST WINTER AND SONS INC 2323 N ROEMER ROAD APPLETON, WI 54911 Total Bid Installation: $66,800.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bids are hereby accepted and the proper City officials are hereby authorized and directed to enter into appropriate agreements for the purpose of same, all according to plans, specifications, and bids on file. Money for this purpose is hereby appropriated from: Acct. No. 0322-1910-7206-65009 Capital Construction City Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Jon G.Urben, General Services Manager DATE: February 12,2020 RE: Award Bid to Ferguson Waterworks and August Winter and Sons Inc. for Four (4) Gate Valves and Installation for Wastewater Division($184,100.00) BACKGROUND The Common Council allocated$250,000.00 in the 2020 CIP for the replacement of four(4)influent water valves at the Wastewater Plant. These four remaining valves are original 1975 valves that have surpassed their useful service life and are obsolete. It is more cost effective to solicit bids separately for the valves and the installation. ANALYSIS Working with Wastewater staff,Purchasing prepared separate bid specifications for the three valves and the installation. The installation bid was advertised in the local newspaper. Both bids were posted on Onvia DemandStar and sent to known water valve suppliers and installers. Bids were due February 11, 2020. The bid tabs are attached. Based on the review of the low bid for both projects it was the consensus of staff that they both met all the minimum bid requirements. FISCAL IMPACT ,. The fiscal impact of the four valves bid is $66,800.00. The fiscal impact of the installation bid is $117,300.00. The total fiscal impact of both bids is $184,100.00. The 2020 CIP allocated $250,000.00 for this project. This project will be charged to A/N#03221910 7206 65009. RECOMMENDATION Purchasing recommends the Common Council award the valve bid to Ferguson Waterworks for $117,300.00 and the installation bid to August Winter and Sons Inc. for$66,800.00. Respectfully Submitted, Approved: Jon G.Urben, General Services Manager Mark A. Rohloff, City Manager City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 http://www.ci.oshkosh.wi.us BID TAB AMERICAN FLOW CONTROL SERIES 2500 30" GATE VALVES CITY OF OSHKOSH WASTEWATER TREATMENT PLANT BIDS DUE FEBRUARY 11, 2020 QTY 4 DELIVERY VENDOR INFORMATION American Flow Series 2500 30" Ferguson Waterworks 5350 N Richmond Street $117,300.00 1 -2 Weeks Appleton WI 54913 Technology International Inc 1349 S International PKWY $159,740.00 90 - 150 Days Suite 2411 Lake Mary FL 32746 BID TAB INSTALLATION OF CITY FURNISHED AMERICAN FLOW CONTROL SERIES 2500 30" GATE VALVES CITY OF OSHKOSH WASTEWATER TREATMENT PLANT BIDS DUE FEBRUARY 11, 2020 VENDOR INFORMATION BID BID BOND PREQUAL August Winter and Sons Inc 2323 N Roemer Road $66,800.00 YES YES Appleton WI 54911