Loading...
HomeMy WebLinkAbout0107290-Building (siding) �� CITY OF OSHKOSH No �o�2so �'J �NNEp OS+�KOSH BUILDING PERMIT -APPLICATION AND RECOR �,�,�.� ON THE WATER Job Address 1307 CONGRESS AVE Owner STEVEN J/TRISHA TALLEY �te 04/O6/2004 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building � Sign_ � Canopy � Fence � Raze � Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. � Projection I Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Flood Piain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature �FR/REPLACING THE EXISTING ALUMINUM SIDING WITH VINYL,DUE TO WIND STORM NO STRUCTURAL CHANGES of Work � ���y� �,v�r HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: /Jj1.Q Date 04/06/2004 Final/O.P. 00/00/0000 � Permit Voided Parcel Id# 1205170000 In the perFormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature ,���� �(�„�vj� Date /�p (� � AgenUOwner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of fnspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.