HomeMy WebLinkAbout0107290-Building (siding) �� CITY OF OSHKOSH No �o�2so
�'J �NNEp
OS+�KOSH BUILDING PERMIT -APPLICATION AND RECOR �,�,�.�
ON THE WATER
Job Address 1307 CONGRESS AVE Owner STEVEN J/TRISHA TALLEY �te 04/O6/2004
Designer Contractor OWNER
Category 141 -Exterior Remodeling Plan
Type � Building � Sign_ � Canopy � Fence � Raze �
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. � Projection I
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Flood Piain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature �FR/REPLACING THE EXISTING ALUMINUM SIDING WITH VINYL,DUE TO WIND STORM NO STRUCTURAL CHANGES
of Work � ���y� �,v�r
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00
Issued By: /Jj1.Q Date 04/06/2004 Final/O.P. 00/00/0000
� Permit Voided Parcel Id# 1205170000
In the perFormance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
Signature ,���� �(�„�vj� Date /�p (� �
AgenUOwner
Address Oshkosh WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
fnspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.