HomeMy WebLinkAbout0107408 BOSHKOSH
ON THE WATER
.lob .Address 1846 OHIO ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS J/CARA S DAVIS
Contractor OWNER
Category 142 - Decks, Patios, Ramps
No 107408
Create Date 04/13/2004
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Constructing a 19' x 27' deck off the rear of the house.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$1,900.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$26.00 Park Dedication $0.00
Date 04/13/2004 Final/O.P. 00/00/0000
Parcel Id # 1407550000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 1846 OHIO ST
Agent/Owner
OSHKOSH
WI 54902 - 6853 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: t ~'~[ ~ (~,~' o
PROPERTY OWNER/CONTRACTOR: <~
CONSTRUCTION DATA: [] New Construction [] Addition [] Alteration
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
ZONING:
COMPLIANCE CHECKLIST
DEFICIENT
Use
[] Lot Width
[] Lot Area
[] Lot Area Per Family
[] Flood Plain
[] Front Yard
[] Front Yard Side Street
COMMENTS:
DEFICIENT
J~ Rear Yard
[] Side Yards
[] Building Area
[] Parking Standards
r-] Off-Street Loading Standards
[] Vision Clearance
[] Transitional Yard Standards
DEFICIENT
[] Landscape Standards
[--I Height
[] Conditions of Approval
[] Compliance with P.C. or
BZA Conditions of Approval
[--~ Signage Standards
[--I Mechanical Equip. Screening
[] Parking Lot Lighting
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the following: (1) Alterations or intedor work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change ia
proposed.
APPROVED
DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY:
2003