Loading...
HomeMy WebLinkAbout0107365 BOSHKOSH ON THE WATER .lob Address 2015 MENOMINEE DR Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN M/JULIE LESCHKE Contractor LAIB RESTORATION INC Category 140 - Interior Remodeling No 107365 Create Date 04/12/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Installing a new header to create an opening for a french door. This header will carry the end of the beam located in the kitchen. The of Work point loads will be properly transferred. A new column pad and post will be installed to carry the load. This permit also includes the installation 3f kitchen cabinets, flooring, and the installation of a laundry chute. HVAC Contractor Plumbing Contractor GARTMAN MECHANICAL Electric Contractor WITZKE ELECTRIC INC Fees: Valuation $14,684.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Issued By: Date 04/12/2004 Final/O.P. 00/00/0000 Permit Voided Parcel Id # 1512100000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 21 W NEWYORKAVE OSHKOSH WI 54901 - 3757 Telephone Number 233-7026 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.