HomeMy WebLinkAbout0107365 BOSHKOSH
ON THE WATER
.lob Address 2015 MENOMINEE DR
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JOHN M/JULIE LESCHKE
Contractor LAIB RESTORATION INC
Category 140 - Interior Remodeling
No 107365
Create Date 04/12/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Installing a new header to create an opening for a french door. This header will carry the end of the beam located in the kitchen. The
of Work point loads will be properly transferred. A new column pad and post will be installed to carry the load. This permit also includes the installation
3f kitchen cabinets, flooring, and the installation of a laundry chute.
HVAC Contractor Plumbing Contractor GARTMAN MECHANICAL
Electric Contractor WITZKE ELECTRIC INC
Fees: Valuation $14,684.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00
Issued By: Date 04/12/2004 Final/O.P. 00/00/0000
Permit Voided
Parcel Id # 1512100000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 21 W NEWYORKAVE OSHKOSH WI 54901 - 3757 Telephone Number
233-7026
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.