Loading...
HomeMy WebLinkAbout0107279-Building (roof) /� CITY OF OSHKOSH No 107279 NEp OSHKOSH BUILDING PERMIT -APPLICATION AND REC ,a� ON THE WATER ����ti"'� Job Address 1113 CEAPE AVE Owner TODD D DOWLAND �q�ate Date 04/06/2004 Designer Contractor WERNER HOME IMPROVEMENTS LLC Category 141 -Exterior Remodeling Plan Type � Building � Sign _ � Canopy � Fence � Raze _ � Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection I Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/Re-roofing the house(complete tear off),NO STRUCTURAL WORK. of Work I I I i HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,095.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: 1 Date 04/06/2004 Final/O.P. 00/00/0000 � Permit Voided 'I Parcel Id#0805080000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit�plicatio within an e sement,the Ciry strongly urges the permit applicant to contact the easement � � holder(s)and to se e any e sary approv Is before starting such activity. Signature Date �� Agent/Owner Address 2147 POINT COMFORT RD OSHKOSH WI 54902 - 7513 Telephone Number 236-9109 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.