HomeMy WebLinkAbout0107340-Building (driveway)OSHKOSH
ON THE WATER
.lob .Address 729 MONROE ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner JEFFREY R/LISA SAUERBERG
Contractor OWNER
Category 256 - Parking Lots, Driveways
No 107340
Create Date 04/08/2004
Plan
Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR 12' wide asphalt driveway to detached gargae
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$1,400.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$26.00 Park Dedication $0.00
Date 04/08/2004 Final/O.P. 00/00/0000
Parcel Id # 1107720000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 729 MONROE ST OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: ~')-~, ~'-~',-~-~- ~"~-~
PROPER~NTRACTOR: ~ ,,_~--~ ~c_~_ (,.~-
CONSTRUCTION DATA: ~ New Construction ~ Addition
~PE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
ZONING:
[] Alteration
COMPLIANCE CHECKLIST
DEFICIENT
DEFICIENT
DEFICIENT
[] Use
[] Lot Width
[] Lot Area
Lot Area Per Family
Flood Plain
[] Fron~[ Yard
[] Fron~t Yard Side Street
[] Rear Yard
[] Side Yards
[] Building Area
~1 Parking Standards
~-] Off-Street Loading Standards
[] Vision Clearance
[-'] Transitional Yard Standards
[] Landscape Standards
[] Height
[] Conditions of Approval
[] Compliance with P.C. or
BZA Conditions of Approval
[] Signage Standards
[] Mechanical Equip. Screening
[] Parking Lot Lighting
COMMENTS:
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the fo/lowing: (1) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
APPROVED [] DENIED
Plan Commission Action Required'
Variance(s) Required
REVIEWED BY: ~
2003