Loading...
HomeMy WebLinkAbout0107293-Building (roof & windows)OSHKOSH ON THE WATER .lob .Address 218 HUDSON AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TANNAN PROPERTIES LLC Contractor OWNER Category 140 - Interior Remodeling No 107293 Create Date 04/07/2004 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature RENTAL/Re-roofing the house (complete tear off), installing 12 replacement windows (same size and location), replacing the paneling with of Work drywall, and installing new kitchen cabinets and countertops. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor UNKNOWN $12,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $84.00 Park Dedication $0.00 Date 04/07/2004 Final/O.P. 00/00/0000 Parcel Id # 0403490000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 430 NORTH KOELLER OSHKOSH WI 54902 - 0000 Telephone Number 231-2555 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.