Loading...
HomeMy WebLinkAbout0107278 BOSHKOSH ON THE WATER .lob Address 700 N WESTHAVEN DR Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner WESTHAVEN OFFICE LLC Contractor No 107278 Create Date NORTHCENTRAL CONSTRUCTION CORP. Category 223 - Alteration Offices, Banks, Professional Plan L2-22-0404 04/06/2004 Type I(~ Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Class of Const: Size 15,382 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 2 Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Office Building/Interior alterations to create office suite for Aurora in N 1/3 of first floor and on 4/5 of second floor (minus the SW 1/5 of this floor of Work level.)* State Trans ID 981208. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $230,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $754.00 Park Dedication $0.00 Date 04/06/2004 Final/O.P. 00/00/0000 Parcel Id # In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 631 S HICKORY ST FOND DU LAC WI 54935 - 0000 Telephone Number 920-929-9400 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.