HomeMy WebLinkAbout0107199-Building (roof) i,/i} CITY OF OSHKOSH � ►vo 107199
�:�.> >���.�
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD,� � ;
ON THE WATER S � �'
Job Address 2218 VINLAND ST Owner DARRYL S LEHMAN Crea e Date 04l01/2004
Designer Contractor OWNER
Category 141 -Exterior Remodeling Plan
Type � Building � Sign 0 Canopy �� Fence � Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection j
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier � Other
(.j Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/Tear off and replace existing roofing on house.'NO STRUCTURAL WORK.
--- ----- --_— -
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuatio $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00
Issued By: � Date 04/01/2004 Final/O.P. 00/00/0000
Y
� Permit Voided ', Parcel Id# 1218090000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perForm the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)an secure a necess approvals before starting such activity.
Signature { � Date ��1 `�)
AgenUOwner
Address Oshkosh WI 54901 - 0000 Telephone Number z ����3�
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure (how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.