Loading...
HomeMy WebLinkAboutItem VI A PLAN COMMISSION STAFF REPORT JANUARY 7,2020 ITEM VI A: SPECIFIC IMPLEMENTATION PLAN FOR A COMMERCIAL HOTEL DEVELOPMENT AT 1365 N.WESTFIELD STREET GENERAL INFORMATION Applicant: Steve Hoopman Property Owner: H2oshkosh Ave LLC/North Koeller Street Hotel Associates, LLC Action(s) Requested: The petitioner requests approval of a Specific Implementation Plan (SIP) amendment for a hotel development at 1365 N.Westfield Street. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Background Information Property Location and Type: A General Development Plan (GDP) for the subject property and several neighboring parcels was approved by the Common Council at the March 13, 2018 Council meeting. This GDP was to allow a hotel on the subject parcel and commercial and retail uses on the neighboring properties. As part of the GDP, a Certified Survey Map (CSM) was approved for the current two lot configuration. North Westfield Street was extended through the dedication of right-of- way to serve this parcel. The original GDP addressed the land use, site design/access, storm water management/utilities, landscaping, signage, site lighting and building facades. The Plan Commission recommended approval of the GDP at its March 6,2018 meeting. On August 28, 2018,the Common Council approved a GDP amendment for the subject parcel at 1365 N. Westfield Street and several neighboring parcels. This GDP amendment was for the hotel on the subject parcel and revised commercial and retail uses on the neighboring parcels. The Plan Commission recommended approval of the GDP amendment at the August 21, 2018 Plan Commission meeting. Since that time,Plan Commission has held numerous workshops pertaining to development of the area. The approximate 2.40 acre (104,418 sq. ft.) site along N. Westfield Street and N. Koeller Street will include a Marriott TownPlace extended stay hotel and associated surface parking. The subject parcel is zoned Corporate Business Park with a Planned Development Overlay (CBP- PD). The subject parcel is bounded by N.Westfield Street on the east and N. Koeller Street on the north. Most of the neighboring properties (west, south and east) are vacant but are zoned similarly to the subject parcel and are slated for commercial redevelopment. Lakeshore Park is just to the north of the subject parcel and the Lakeshore Park Master Plan was recently approved for the park. Subject Site Existing Land Use Zoning Vacant—Commercial—Proposed Marriott TownPlace Hotel CBP-PD Paqe 1 Adjacent Land Use and Zoning Existing Uses Zoning North Lakeshore Park Institutional (I) .............................................................................................................................................................................................................................................................................................................................................................................................................................................................. South Vacant—Planned Commercial CBP-PD .............................................................................................................................................................................................................................................................................................................................................................................................................................................................. East Vacant—Planned Commercial SR-2, CBP-PD .............................................................................................................................................................................................................................................................................................................................................................................................................................................................. West Vacant—Planned Commercial CBP-PD Comprehensive Plan Land Use Recommendation Land Use 2040 Land Use Recommendation Interstate Commercial The petitioners have had multiple conversations with Planning Services staff and Plan Commission regarding the proposed hotel development on this site. They further developed their proposal for the subject parcel and have filed a Specific Implementation Plan (SIP) application for review. The SIP includes the proposed 4-story, 60,483 sq. ft. 103-room Marriott TownPlace extended stay hotel and 113 associated surface parking spaces. The petitioners have stated that this project is part of the Oshkosh Avenue redevelopment and will be compatible with the heightened Corporate Business Park zoning standards. As part of this SIP approval process the petitioners have submitted site plans, storm water management plans,building elevations, photometric plans and lighting specifications, landscaping plans and a narrative stating their intent for the subject property and the Base Standard Modifications (BSMs) they have requested. AI. Perspective of the proposed hotel development for 1365 N. Westfield submitted by the applicants. ITEM VIA-SIP-1365 N. WESTFIELD STREET-HOTEL 2 Paqe 2 ANALYSIS Use The previously approved GDP and GDP amendment (2018) of the site was for the proposed hotel development. The applicants have further developed their plans and would like to finish the approval process. The submitted plans propose a 4-story, 60,483 sq. ft., 103-room extended stay hotel. The proposed commercial use is consistent with the 2040 Comprehensive Plan's Interstate Commercial land use for this area. Site Design&Access/Parking As part of the proposal, the applicants will create entirely new parking and access drives on the currently vacant parcel. The petitioners are proposing 113 total parking spaces between Lots 1 and 2 (see site plan and tables). Two access drives are proposed for the subject parcel. One access drive is proposed for the east side of the parcel off of N. Westfield Street. The second access drive is proposed for the north side of the parcel off of N. Koeller Street. Employees, customers and the general public will access the site with these two access drives or through the drive aisles leading up from the parcel immediately to the south. It is the applicants' intention that this property and the parcel to the west and south will function as one development despite the presence of multiple commercial uses on this and the neighboring property. Drive aisles will allow access between the subject site and the neighboring parcel. Cross access agreements will be required for the shared parking and access drives between the parcels. Access control variances (to be discussed in the accompanying Item VI B) will be required for the proposed lateral clearances of the two access drives. Additionally, the applicants have requested a Base Standard Modification (BSM) to allow 14 of the 113 required hotel parking spaces immediately to the west of the subject site on the neighboring parcel (Lot 2). Staff has discussed and is supportive of this BSM. Staff is of the opinion that the 14 stalls will allow the hotel to meet its parking requirement. Despite the location of the 14 spaces on the neighboring parcel, the layouts of the subject parcel and neighboring properties are designed to function as one site. Staff does not see issues with supporting the requested BSM for the parking location on Lot 2. Staff would recommend a condition requiring appropriate cross access agreements allowing shared access between Lots 1 and 2. 1365 N.WESTFIELD STREET REQUIRED PARKING—ONE SPACE PER ROOM FOR RENT, PLUS ONE SPACE FOR EACH EMPLOYEE ON THE LARGEST WORK SHIFT SPACES PROVIDED LOT 1 (SUBJECT PARCEL 99 SPACES LOT 2 14 SPACES ITEM VIA-SIP-1365 N. WESTFIELD STREET-HOTEL 3 Paqe 3 LOT 2 PARKING-14 PROPOSED LOT 1(SUBJECT PARCEL)PARKING- SPACES 99 PROPOSED SPACES NORTH KOELLER STREET x�. ga a os sr no .......... 'wax%siren— _ —— `\� ❑ RATH LANE PROP�SEO ('_,Y,PENS-1'y na 8 _ LQL I nvEucxE screnrx f` .a:t ago E _ �I-E 1.110 7T_ P ; AR> The site layout as proposed includes an impervious surface ratio (coverage by buildings and pavement) of 70.1% of the total site area. This leaves 29.9% of the site area for green space. The maximum impervious surface ratio for the Corporate Business Park district is 70%. Therefore, the applicants have requested a BSM to allow the site layout to exceed the 70%maximum impervious surface ratio allowed by code for Lot 1. Staff has reviewed this BSM and is supportive of the BSM with the understanding that Lot 2 will have a maximum impervious surface ratio of 65.7% as proposed. The impervious surface amount beyond the code maximum proposed for Lot 1 would be offset by Lot 2 staying below the code maximum. Lighting The original 2018 GDP and GDP amendment did not address site lighting and no photometric plans or light specifications were provided by the applicants. Now that the applicants have developed plans further for the site, they have submitted a photometric plan. The plan includes on-building and freestanding lighting. The applicants have provided information on the light fixtures. From the information provided, the free-standing light fixtures appear to meet the business park maximum height of 25'. According to the information provided by the applicants, the on-site illumination levels appear to be below the code maximum average of 3.0 footcandles for this property. Staff has determined that the light trespass at the north property line exceeds the code maximum allowance of 0.5 footcandles of illumination. A BSM is required to allow the heightened level of light trespass at the north property line. Due to the presence of Lakeshore Park and the lack of residential or commercial properties immediately across N. Koeller Street from the site, staff is supportive of granting the BSM for increased light levels at the north property line. Staff determined however, that in several locations on the applicants' photometric plan,the proposed light levels are deficient and do not meet the code minimum ITEM VI A-SIP-1365 N. WESTFIELD STREET-HOTEL 4 Paqe 4 illumination requirement of 0.4 footcandles for all parking, drive aisles and access drives used after sunset. These locations include the north and east access drives providing access from the streets and the drive aisles running along the west and south portions of the site. A hotel development is proposed for the site, therefore, many visitors could come and go after sunset when site lighting is important. Due to this, staff will require that the applicants subunit a revised photometric plan ensuring code-compliant levels of lighting on the site for all areas, including areas currently deficient. This revised photometric plan will be a requirement for the Site Plan Review process. See below photometric plan for areas of the site currently not in compliance with the ordinance. - AREAS OF DEFICENT AREA OF INCREASED LIGHTING LIGHT TRESPASS -NORTH KOELLE STREET T.� I I PROPOSED 4-STORY HOTEL m ------ LU u " b AREAS OF DEFICENT" Z SITE LIGHTING PLAN 7/ LIGHTING Area of increased light trespass (on the north edge of the site) and areas of deficient lighting on the northwest, west, south and southeast edges of the site as shown on the applicants'photometric plan. Signage The original GDP and GDP amendment addressed signage. A condition of GDP approval was that no freestanding signage would be permitted for the subject parcel. The applicants have therefore not proposed any freestanding(monument, pylon, dual post, etc.) signage for this property. A BSM was approved to allow signage for this development as part of a shared monument sign located at the corner of Oshkosh Avenue and N. Westfield Street. The signage proposed for this development consists solely of on-building wall signage. The signage is consistent with Marriott's current corporate standards. It appeared that the signage area was less than 15% of the overall facade area for each facade. The applicants provided detailed sign specifications as part of the submittal. However, several sign size options were possible for each sign shown in the Marriott standards. Staff is therefore requiring that the applicants ITEM VI A-SIP-1365 N. WESTFIELD STREET-HOTEL 5 Paqe 5 clarify the dimensions and areas of each proposed wall sign. Staff will require this updated sign information for the Site Plan Review process. TOWNEPLACE SUITES MRKRIOTT - • } Eu 116 On-building wall signage as included in the petitioner's sign package(above). Landscaping The original GDP and GDP amendment addressed landscaping. The applicants submitted a landscaping plan showing minimal landscaping for the site. Staff had made the applicants aware that the Corporate Business Park (CBP) district requires more intensive landscaping than what the applicants initially submitted. For the SIP, the applicants have submitted a more intensive landscaping plan. The plan proposes various trees and shrubs for street frontage, yard,building foundation and paved area landscaping. The applicants submitted breakdowns for required and proposed landscaping points (see below). Staff noticed that in most categories the proposed landscaping points exceed the ordinance minimums. However, the proposed number of landscaping points for the street frontages is currently deficient. The CBP standards require that 50% of the required yard landscaping points be reallocated to street frontages. Staff will require that the applicants provide the required street frontage points. Staff will require that the applicants submit and updated landscaping plan/landscaping information as part of the Site Plan Review process. LANDSCAPING CATEGORY POINTS REQUIRED POINTS SUPPLIED BUILDING 813 linear feet/100 linear feet x 40 FOUNDATION points=325 Points 426 Points 55,733 sq.ft. /10,000 sq. ft. x 50 PAVED AREAS points=525 Points 1,386 Points 642 linear feet/100 linear feet x 100 points=642 Points+50% of required Yard points(175 points)_ STREET FRONTAGE 817 Points 787 Points 17,261 sq.ft. /1,000 sq.ft. x 20 points=350 Points- 175 points reallocated to street frontages per Corporate Business Park= 175 YARDS Points 642 Points TOTAL 1,882 Points 3,220 Points ITEM VI A-SIP-1365 N. WESTFIELD STREET-HOTEL 6 Paqe 6 m+c NORTH KDELLER STREET {u'�;-'`,•.:,,..:•.. nuP :our cc«w f amc ewa II 4 Q m� MATH LANE S � u" �,a«7S •:ICJ 1 miP psi f i ,ww IipoP ti75nry rID � :W lPuo_ n�PPOPN�� �n l■ i"W �fei HTiR (p'P ' 1 4 4 Uzi — � R 3 M{nt.! •{>)xs MPu Gh lyc `rll �! '1 0[ 1MIr I 151 f \. yaf. I!Ilu—lice 4� la)nil� J 71}im{� ��[+Ivl Y4+ {59n1 Z r 3 _ ''—_ Illltlltlllll - IIIII III F .Y-•�.�.j 4 � �"�` .'•v � —_�—_ I �{-t I I �+� � fill—Hrl 1111 r I� T .. LJ UUU �J Ll ";r x� ' — — IIII IfIII III II III II T.a.. F n I l u 1 1 1 1 I I i I/ BLII➢PW � + .:w.rc..meimn------------ - ---�'� 05HKO5H AVENUE Landscaping plan submitted by the applicants. Storm Water Management The Department of Public Works has reviewed the plans submitted to date and has stated that they will require full site plan review and additional information. Storm water requirements will be addressed during the Site Plan Review process. Building The applicants have submitted building plans and elevations. The site plan shows the proposed location and footprint of the hotel on the site. The footprint of the building and proposed placement of the building coupled with the proposed site layout means that the building footprint will encroach approximately 12' into the required 30' front yard setback on the north side of the site along N. Koeller Street. The encroachment into the setback will necessitate a BSM. Staff is supportive of the BSM. The main massing of the building will still be located outside of the required 30' front setback and the portion of the building to be located within the setback is one story tall. Therefore, the massing of the building will not overpower the street edge and staff does not see issues. The developers of the subject parcel (Lot 1) and adjacent parcel (Lot 2) are treating the parcels collectively as a triple frontage lot and one overall development. The proposed location of the hotel building allows the applicants to locate all of the required parking away from the street frontage,which is the intent of the CBP standards. The BSM for the building to encroach into the front yard setback would negate the need for any ITEM VIA—SIP—1365 N. WESTFIELD STREET—HOTEL 7 Paqe 7 dimensional or locational BSMs for the proposed patio/outdoor seating area on the north side of the building, since that seating area is currently proposed behind the furthest edge of the hotel building. The elevations submitted by the applicants propose a combination of EFIS, fiber cement panels, stone,brick, glass and aluminum. According to the information provided by the applicants, the elevations all exceed the 75%minimum facade area required for Class I materials. Staff believes that the building as proposed meets the ordinance requirement of facade divisions into base, middle and top zones. Staff believes that the applicants could provide increased articulation to differentiate the base from the middle zones,but will defer to the Plan Commission on this point. The applicants requested a BSM for facade articulation and believed that they had some zones of the facades that exceeded 40 linear feet without articulation. Staff reviewed the facades and is of the opinion that the facades meet the intent of the ordinance for facade articulation. AMMICRN u Mffl[rauE lk U. i"'H BUILDING ELEVATION -�- Z - - ----:-smd -arm 61 Q Z w= F; ER]WBUILDING ELEVATION r1WEST 9UILDING ELEVATION �n�I r�5OUT VILDING ELEVATION -201 Elevations submitted by the applicants —currently elevations meet the Class I material percentage of 75% of the area for each MARRIOTT HOTEL ELEVATIONS facade far the Corporate Business Park district. The table to the CLASS I MATERIAL PERCENTAGES right shows the proposed percentage of facade area clad in Class I FAQADE REQUIRED PROPOSED materials against the code minimum requirement for the NORTH 75% 81.36% Corporate Business Park district. SOUTH 75% 81.36% EAST 75% 80.11% WEST 75% 75.29% ITEM VI A-SIP-1365 N. WESTFJELD STREET-HOTEL 8 Paqe 8 Conclusion The petitioners are requesting approval of an SIP to allow a hotel development at 1365 N. Westfield Street. They have submitted site plans, parking/access drive/circulation layouts, landscaping and photometric plans, signage information,building elevations and a narrative stating their intentions for the site and requesting a number of base standard modifications for the site. The proposal will require BSMs for the following: • to allow some of the site's parking to be located on the neighboring property • the impervious surface ratio for the site to exceed 70% • light levels at the north property line to exceed the maximum level of 0.5 footcandles allowed by code • to allow signage for this development to be part of shared signage at the corner of Oshkosh Avenue and N.Westfield Street • to allow a reduction in front yard (N. Koeller Street) setback from 30 feet to approximately 18 feet. The applicants plan to exceed the code standards for required landscaping. This will help offset the BSMs the applicants are requesting. The applicants provide 171% of the landscaping points required for the site. The additional landscaping will visually enhance the site. Staff is supportive of the requested BSMs and does not have concerns with the proposed development as long as the applicants submit revised photometric, landscaping and signage plans for staff review as part of the Site Plan Review process. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387(C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City's Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (f) The proposed Planned Development project design does not detract from areas of natural beauty surrounding the site. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. ITEM VI A-SIP-1365 N. WESTFIELD STREET-HOTEL 9 Paqe 9 (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. (j) For Planned Development projects that are proposed to be developed in phases, the applicants can provide a timeline for development and can demonstrate that the project would be successful even if all phases were not or could not be completed. Staff recommends approval of the Specific Implementation Plan amendment as proposed with the findings listed above and the proposed following conditions: 1. Base Standard Modification to allow 14 of the required 103 parking spaces to be located on Lot 2 (adjacent parcel) 2. Applicants shall obtain cross access agreements to allow shared parking/access between this property and the neighboring parcel. 3. Base Standard Modification to allow an increase in impervious surface ratio for this parcel from code maximum of 70% to 70.1% for the site. 4. Base Standard Modification to allow light trespass at the north property line to exceed the code maximum allowance of 0.5 footcandles. 5. Applicants shall submit a revised photometric plan for Department of Community Development review. 6. Base Standard Modification to allow signage for this property to be located with shared signage at the corner of Oshkosh Avenue and N. Westfield Street. 7. No freestanding signage shall be located at 1365 N. Westfield Street. 8. Final landscaping plan and information to be reviewed and approved by the Department of Community Development. 9. Base Standard Modification to allow a reduction in front yard (N. Koeller Street) setback from 30' to 18'. ITEM VIA-SIP-1365 N. WESTFIELD STREET-MOTEL 10 Paqe 10 SUBMIT TO: City of Oshkosh Dept.of Community Development 215 Church Ave.,P.O.Box 1 130 ��r0� Planned Development Application POh,WI 236-1 Oshkosh HONE For General Development Plan or Specific Implementation Plan **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner:Steve Hoopman Date:_11-26-2019 Petitioner's Address:_5105 1 Ah Maytha City: Oshkosh State: WI Zip:54901 Telephone #: (920) 216-1083 Email: hoopmans@firstweber.com Contact preference: X Phone X Email Status of Petitioner (Please Check): X Owner Y Representative Y Tenant Y Prospective Buyer Petitioner's Signature (required):Steve Hoopman Date:_1 1-26-2019 OWNER INFORMATION Owner(s): H2oshkosh Ave LLC/North Koeller Street Hotel Associates, LLC Date: 11-26-2019 Owner(s) Address: 51051 Ah Maytha City: Oshkosh State: WI Zip:54901 Telephone #: ( ) some Email: some Contact preference: ❑ Phone ❑ Email Ownership Status (Please Check): Y Individual Y Trust X Partnership Y Corporation Property Owner Consent:(required) By signature hereon, I/We acknowledge that City officials and/or employees may,in the performance of their functions,enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner's Signature: Steve Hoopman Member Date:_1 1-26-2019 TYPE OF REQUEST: ❑ General Development Plan (GDP) X General Development Plan (GDP) Amendment X Specific Implementation Plan (SIP) ❑ Specific Implementation Plan (SIP) Amendment SITE INFORMATION Address/Location of Proposed Project: Oshkosh Ave Proposed Project Type: New construction of 103 Key Marriott TownPlace Suites Current Use of Property:_Vacant land Zoning:CBP-PD Land Uses Surrounding Your Site: North: Industrial- Park South Commercial Business Park Planned Development-Commercial East: Commercial Business Park Planned Development-Commercial West: Commercial Business Park Planned Development-Commercial ➢ It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal. Application fees are due at time of submittal. Make check payable to City of Oshkosh. Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City's website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm Sign Staff Date R?Jc� ❑ Proposed grading plan. ❑ Specific landscaping plan for the subject site, specifying the location, species, and installation size of plantings. The landscaping plans shall include a table summarizing all proposed species. ❑ Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor area, bulk, and visual character of such buildings. ❑ Engineering plans for all water and sewer systems,stormwater systems, roads, parking areas, and walkways. ❑ Signage plan for the project, including all project identification signs, concepts for public fixtures and signs, and group development signage themes that may or may not vary from City standards or common practices. ❑ Specific written description of the proposed SIP including: • Specific project themes and images. • Specific mix of dwelling unit types and/or land uses. • Specific residential densities and nonresidential intensities as described by dwelling units per acre, and landscaping surface area ratio and/or other appropriate measures of density and intensity. • Specific treatment of natural features, including parkland. • Specific relationship to nearby properties and public streets. • Statistical data on minimum lot sizes in the development, the precise areas of all development lots and pads; density/intensity of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission. A statement of rationale as to why PD zoning is proposed.This statement shall list the standard zoning requirements that, in the applicant's opinion,would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project. • A complete list of zoning standards that would not be met by the proposed SIP and the location(s) in which such exceptions/base standard modifications would occur. Phasing schedule, if more than one development phase is intended. ❑ Agreements, bylaws, covenants, and other documents relative to the operational regulations of the development and particularly providing for the permanent preservation and maintenance of common open areas and amenities. ❑ A written description that demonstrates how the SIP is consistent with the approved GDP and any and all differences between the requirements of the approved GDP and the proposed SIP. I hereby certify that to the best of my knowledge all required application materials are included with this application. I am aware that failure to submit the required completed application materials may result in denial or delay of the application request. Applicant's Signature (required): Steve Hoopman Date: 1 1-26-2019 Paqe 12 3 QUAM ENGINEERING, LLC Ke5i6ential and Commercial Site De51c3n Gon5Ultant5 PROJECT NARRATIVE Re: H2 Oshkosh Ave LLC/North Koeller Street Hotel Associates, LLC North Westfield Street/North Koeller Street Lot 1 of CSM No. 7411 The following application is being made on behalf of H2 Oshkosh Ave LLC/North Koeller Street Hotel Associates, LLC to make an amendment to the General Development Plan and request Specific Implementation Plan approval for the development of a four-story, 103-room extended stay hotel on Lot 1 of CSM No. 7411. This area is being re-developed in conjunction with the redevelopment of the entire area along Oshkosh Avenue into a Commercial Business Park Planned Development. The property is currently zoned Commercial Business Park Planned Development(CBP-PD). The surrounding land uses include Industrial to the north, Commercial Business Park Planned Development to the east and south and Commercial Business Park Planned Development to the west. The proposed development will be compatible with the surrounding zoning adjacent to the property. The proposed project fits into the comprehensive plan that has been adopted for this area in conjunction with the development of the Oshkosh Corporation global headquarters. It is the intention of this area to be part of the new gateway into the community and provide for some potential additional services to the surrounding area. There is no residential plan as a part of this development. The plan for construction is early spring of 2020 and completion by late fall 2020. All parking, landscape and development standards for this proposed development are being completed in conjunction with the newly developed standards. GDP/SIP requirements: • General/Specific project themes and images The development will consist of a four-story, 103-room extended stay hotel. The building design will consist of EFTS,Hardiepanel vertical siding, stone and brick which provides a modern balanced appearance that will blend in with the surrounding area. Specific materials are listed on page 9 of the Architectural Plans. • General/Specific mix of dwelling unit types and/or land uses The proposed hotel will be a four-story, 103-room extended stay facility. It will include studio and 1-bedroom suites with kitchenettes. The hotel will include laundry facilities, an indoor swimming pool, fitness center and community room. Specific room mix and amenities are shown on the Architectural Plans. • Specific non-residential intensities The total floor area for the hotel consists of 60,483 square feet,with the following areas per floor: I"floor: 17,331 sf, 2nd floor: 14,384 sf, 3rd floor: 14,384 sf and 4 b floor: 14,384 s£ The building height is 54' —6",which is less than the maximum allowable of 65'. The proposed site will include 29.9% open space and 70.1% impervious area. The total parking required for the hotel is 113 stalls and 113 parking stalls are provided. There are 122 Wisconsin Street ♦ West Bend, Wisconsin 53095 ♦ www.quamengineering.com Phone (262) 338-6641 ♦ E-mail kparish@quamengineering.com Paqe 13 99 parking stalls on Lot 1 with 14 additional stalls on Lot 2 for a total of 113 stalls. The exterior lighting will meet the code requirements. • General/Specific treatment of natural features The project is part of the overall Commercial Business Park Planned Development redevelopment and will be compatible with those standards. The development will drain to the regional detention ponds which provide peak runoff rate control. Stormwater quality will be provided on-site with a combination of bio-retention and Up-Flo filters prior to discharging to the City storm sewer system as shown on the civil plans included. • General/Specific relationship to nearby properties and public streets The project will be redeveloping the property adjacent to North Westfield Street and North Koeller Street. There will be two connections, one at the current access across from Casey's General Store and the other a proposed entrance onto North Koeller Street. Walking trails and recreational areas are located nearby that can be utilized by the extended stay guests. The proposed use is consistent with the nearby planned development and will work to serve the needs of the surrounding community. • General relationship of the project to the Comprehensive Plan The area surrounding this development was recently rezoned to CBP-PD which matches the current zoning for this property. • Statistical data on minimum lot sizes in the development The property consists of one lot which is Lot 1 of CSM No. 7411 consisting of 2.397 acres. The total floor area for the hotel consists of 60,483 square feet,with the following areas per floor: I"floor: 17,331 sf, 2"d floor: 14,384 sf, 3'd floor: 14,384 sf and 4"' floor: 14,384 sf. The building height is 54' —6",which is less than the maximum allowable of 65'. The proposed site will include 29.9% open space and 70.1% impervious area. The total parking required for the hotel is 113 stalls and 113 parking stalls are provided. • A statement to the rationale as to why the PD zoning is proposed. The area surrounding this development was recently rezoned to CBP-PD which matches the current zoning for this property. • A complete list of zoning standards that would not be met by the proposed SIP 1) Impervious area exceeds 70%maximum 2) Hotel encroaches in setback along North Koeller Street. 3) Parking for hotel lot requires 14 spaces located on Lot 2 to meet the required stall count of 113. 4) Building articulation greater than 40'. • Phasing schedule. The project will be constructed in one phase. Paqe 14 SIP CASEYS MARKETING CO CITY OF OSHKOSH 1365 N WESTFIELD ST 1 SE CONVENIENCE BLVD PO BOX 1130 PC:01-07-20 ANKENY IA 50021 OSHKOSH WI 54903 LAKE SHORE DEVELOPMENT OF OSHKOSH LLC PRIME SPACE LLC HIGHWAY 21 HOSPITALITY GROUP LLC 230 OHIO ST 200 1325 N SUMMER RANGE RD 5108 I AH MAY TAH RD OSHKOSH WI 54902 DE PERE WI 54115 OSHKOSH WI 54901 H2OSHKOSH AVE LLC/ N KOELLER ST HOTEL ASSOCIATES LLC/ STEVE HOOPMAN 5105 I AH MAY TAH RD OSHKOSH WI 54901 Paqe 15 13:i►tiT:Y.AJJ17� ♦O �y 68 / o �V 10�p0 �4. • N SS 11j A �' SS CA' 28. 60.00, S 3 m p -H- 9 156.91' 114.95' 60'()0' O O 19.33' O 17.91' SA A33 N 1 S?A ��g6 1 1844 1820 113.4r 11 00 48.00' 9�• 1�5.19 RZ 1 N 1 in=0.02 mi tin= 120ft City of Oshkosh maps and data are intended to be used for general identification purposes only,and ( i y the City of Oshkosh assumes no liability for the accuracy of the information. Those using the of information are responsible for verifying accuracy. For full disclaimer please go to Printing Date: 1212312019 Oshkosh www.ci.oshkosh.wi.us/GlSdisclaimer Prepared by:City of Oshkosh,WI J:\GIS\Planning\Plan Commission Site Plan Map Template\Plan Commission Site Plan Map Template.mxd P agElser:lm&k -PD O � o O G CBP-PD Z v MR-12 MULTIPLE SR-2 UMU MULTIPLE I SR �A `•P N M U CBP-PD ► OM SMU-PD SUBJECT SITE SR-5� SR-5 SR=9 4� I-PD (P MR-20 c � z C co 'i SR=5 SMU SJ U-PD A /I JJJ \� f�IlJ rr J ICI r N 1 in=0.09mi J J 1 in=500 ft City of Oshkosh maps and data are intended to be used for general identification purposes only,and ( i Y the City of Oshkosh assumes no liability for the accuracy of the information. Those using the of information are responsible for verifying accuracy. For full disclaimer please go to Printing Date: 1212312019 Oshkosh www.ci.oshkosh.wi.us/GlSdisclaimer Prepared by:City of Oshkosh,WI J:\GIS\Planning\Plan Commission Site Plan Map Template\Plan Commission Site Plan Map Template.mxd P agElser jrnli�ak OR - s yyJ + Y k Aw 6 r of �x Al Able �. ' '' '�• ',tom �A`� ." i ' .E.. /•4e .. a -. .. N 1 in=0.02 mi tin= 100ft ` City of Oshkosh maps and data are intended to be used for general identification purposes only,and C"i f the City of Oshkosh assumes no liability for the accuracy of the information. Those using the of information are responsible for verifying accuracy. For full disclaimer please go to Printing Date: 1 215120 1 9 Oshkosh www.ci.oshkosh.wi.us/GlSdisclaimer Prepared by:City of Oshkosh,WI J:\GIS\Planning\Plan Commission Site Plan Map Template\Plan Commission Site Plan Map Template.mxd P agElser:lm@ak