Loading...
HomeMy WebLinkAbout0107164-Building (fence)OSHKOSH ON THE WATER .lob Address 1713 JACKSON ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CORLISSPEHLENBERGER Contractor RAMMER FENCE Category 251 - Fences No 107164 Create Date 03/31/2004 Plan Type Building (~ Sign (~ Canopy O Fence (~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Poured Concrete Concrete Block Occupancy Permit Park Dedication 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. (~ Floating Slab (~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size L~ Projection Canopies Signs Use/Nature SFR/ Constructing a 6' high fence along the south side property line for the rear 74' and 3' high open style pickett fence for the front yard. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $5,200.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $50.00 Park Dedication $0.00 Date 03/31/2004 Final/O.P. 00/00/0000 Parcel Id # 1209570000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3120 SHELDON DR OSHKOSH WI 54904 - 0000 Telephone Number 233-2444 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.