Loading...
HomeMy WebLinkAbout0107156-Building (foundation)0 OSHKOSH ON THE WATER Job Address 1900 W FERNAU AVE Designer Category 210 - Addition Industrial CITY OF OSHKOSH No 107156 BUILDING PERMIT - APPLICATION AND RECORD 7 Owner FERNAU PROPERTIES INC /ROBERT MCMAE Create Date 03/301,,04 Contractor KELLER STRUCTURES Plan K8 -18 -0304 Type Building O Sign ;J Canopy Fence O Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation 0 Poured Concrete O Floating Slab G Pier O Other O Concrete Block O Post O Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use /Nature IIND Addition / FOUNDATION ONLY - Addition per State Transaction ID # 968887. All Mech equip is required to be screened per zoning of Work requirements. Landscape plan required prior to above grade permit being issued. HVAC Contractor Electric Contractor Fees: Valuation Issued By: y Plumbing Contractor Plan Approval $0.00 Permit Fee Paid $139.00 Park Dedication $0.00 Date 03/30/2004 Final /O.P. 00 /00 /0000 �i Permit Voided Parcel Id # 1225000400 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) andJo sec re any, nec efore starting sucactivity. ���U Signature ab �� Date s JC/ Address PO BOX 620 KAUKAUNA r WI 54130 - 0000 Telephone Number 414 - 766 -5795 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING /LAND USE COMPLIANCE CHECKLIST JOB LOCATION: 1900 W. FERNAU AVE ZONING: M -3 PROPERTY OWNER/CONTRACTOR: FOX VALLEY MATERIAL MANAGEMENT / KELLER STRUCTURES CONSTRUCTION DATA: ❑ New Construction M Addition II Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) 12,664 SQ,FT. BUILDING ADDITION, FOUNDATION ONLYH COMPLIANCE CHECKLIST DEFICIENT DEFICIENT DEFICIENT The submitted landscape plan does not provide the tree species type and size at planting, as required by Section 30- 35(H)(2)(e) of the City Zoning Ordinance. An approved landscape plan shall be required before work above the foundation may commence. Chamco Approval per Penny Wilz, E -MAIL, 03/18/2004 Locations and details of all rooftop or ground level mechanical equipment not present on plans. Any and all rooftop or ground level mechanical equipment must be screened from view of the adjacent streets. REVIEW AUTHORITY As per Section 30 -5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. Plan Commission Action Required Variance(s) Required REVIEWED BY: Matt Tuck r i��) [] DENIED DATE: 03/26/2004 2003 Use ❑ Rear Yard Landscape Standards Lot Width ❑ Side Yards ❑ Height Lot Area ❑ Building Area L] Conditions of Approval ❑ Lot Area Per Family ❑ Parking Standards Compliance with P.C. or Flood Plain L] Off - Street Loading Standards BZA Conditions of Approval ❑ Front Yard ❑ Vision Clearance ❑ Signage Standards Front Yard Side Street ❑ Transitional Yard Standards ID Mechanical Equip. Screening Parking Lot Lighting COMMENTS: The submitted landscape plan does not provide the tree species type and size at planting, as required by Section 30- 35(H)(2)(e) of the City Zoning Ordinance. An approved landscape plan shall be required before work above the foundation may commence. Chamco Approval per Penny Wilz, E -MAIL, 03/18/2004 Locations and details of all rooftop or ground level mechanical equipment not present on plans. Any and all rooftop or ground level mechanical equipment must be screened from view of the adjacent streets. REVIEW AUTHORITY As per Section 30 -5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. Plan Commission Action Required Variance(s) Required REVIEWED BY: Matt Tuck r i��) [] DENIED DATE: 03/26/2004 2003 Page 1 of Noe, Brian From: Dannhoff, Allyn J. Sent: Thursday, March 18, 2004 1:51 To: Noe, Brian Subject: FW: FVMM FYI - - - -- Original Message---- - From: Penny K. Wilz [mai Ito: pw ilz@chamco.org] Sent: Thursday, March 18, 2004 1:45 PM To: Tucker, Matt W Cc: Dannhoff, Allyn J. Subject: FVMM Matt & Allyn- - Please be advised that Chamco has approved the expansion plans as presented by Keller Structures for Fox Valley Material Management in our NWIP. I will confirm at a later date in writing with more detail and be sure to CC yous -- Thx Penny 3/29/04