HomeMy WebLinkAbout0107156-Building (foundation)0
OSHKOSH
ON THE WATER
Job Address 1900 W FERNAU AVE
Designer
Category 210 - Addition Industrial
CITY OF OSHKOSH
No 107156
BUILDING PERMIT - APPLICATION AND RECORD
7
Owner FERNAU PROPERTIES INC /ROBERT MCMAE Create Date 03/301,,04
Contractor KELLER STRUCTURES
Plan K8 -18 -0304
Type Building O Sign
;J Canopy
Fence O Raze
Zoning
Class of Const:
Size
Unfinished /Basement 0 Sq. Ft.
Rooms 0
Height 0 Ft.
❑ Projection
Finished /Living 0 Sq. Ft.
Bedrooms 0
Stories
Canopies 0
Garage 0 Sq. Ft.
Baths 0
Signs 0
Foundation 0 Poured Concrete O Floating Slab
G Pier
O Other
O Concrete Block O Post
O Treated Wood
Occupancy Permit Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use /Nature IIND Addition / FOUNDATION ONLY - Addition per State Transaction ID # 968887. All Mech equip is required to be screened per zoning
of Work requirements. Landscape plan required prior to above grade permit being issued.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: y
Plumbing Contractor
Plan Approval $0.00 Permit Fee Paid $139.00 Park Dedication $0.00
Date 03/30/2004 Final /O.P. 00 /00 /0000
�i Permit Voided
Parcel Id # 1225000400
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) andJo sec re any, nec efore starting sucactivity. ���U Signature ab �� Date s
JC/
Address PO BOX 620
KAUKAUNA
r
WI 54130 - 0000 Telephone Number 414 - 766 -5795
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING /LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: 1900 W. FERNAU AVE ZONING: M -3
PROPERTY OWNER/CONTRACTOR: FOX VALLEY MATERIAL MANAGEMENT / KELLER STRUCTURES
CONSTRUCTION DATA: ❑ New Construction M Addition II Alteration
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) 12,664 SQ,FT. BUILDING ADDITION,
FOUNDATION ONLYH
COMPLIANCE CHECKLIST
DEFICIENT DEFICIENT DEFICIENT
The submitted landscape plan does not provide the tree species type and size at planting, as
required by Section 30- 35(H)(2)(e) of the City Zoning Ordinance. An approved landscape plan
shall be required before work above the foundation may commence.
Chamco Approval per Penny Wilz, E -MAIL, 03/18/2004
Locations and details of all rooftop or ground level mechanical equipment not present
on plans. Any and all rooftop or ground level mechanical equipment must be
screened from view of the adjacent streets.
REVIEW AUTHORITY
As per Section 30 -5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: Matt Tuck r i��)
[] DENIED
DATE: 03/26/2004
2003
Use
❑
Rear Yard
Landscape Standards
Lot Width
❑
Side Yards
❑
Height
Lot Area
❑
Building Area
L]
Conditions of Approval
❑
Lot Area Per Family
❑
Parking Standards
Compliance with P.C. or
Flood Plain
L]
Off - Street Loading Standards
BZA Conditions of Approval
❑
Front Yard
❑
Vision Clearance
❑
Signage Standards
Front Yard Side Street
❑
Transitional Yard Standards
ID
Mechanical Equip.
Screening
Parking Lot Lighting
COMMENTS:
The submitted landscape plan does not provide the tree species type and size at planting, as
required by Section 30- 35(H)(2)(e) of the City Zoning Ordinance. An approved landscape plan
shall be required before work above the foundation may commence.
Chamco Approval per Penny Wilz, E -MAIL, 03/18/2004
Locations and details of all rooftop or ground level mechanical equipment not present
on plans. Any and all rooftop or ground level mechanical equipment must be
screened from view of the adjacent streets.
REVIEW AUTHORITY
As per Section 30 -5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: Matt Tuck r i��)
[] DENIED
DATE: 03/26/2004
2003
Page 1 of
Noe, Brian
From: Dannhoff, Allyn J.
Sent: Thursday, March 18, 2004 1:51
To: Noe, Brian
Subject: FW: FVMM
FYI
- - - -- Original Message---- -
From: Penny K. Wilz [mai Ito: pw ilz@chamco.org]
Sent: Thursday, March 18, 2004 1:45 PM
To: Tucker, Matt W
Cc: Dannhoff, Allyn J.
Subject: FVMM
Matt & Allyn- -
Please be advised that Chamco has approved the expansion plans as presented by Keller Structures for Fox Valley Material
Management in our NWIP.
I will confirm at a later date in writing with more detail and be sure to CC yous --
Thx
Penny
3/29/04