HomeMy WebLinkAbout0106931-Plumbing (new toilet/shower fixture)
CITY OF OSHKOSH
106931
No
OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address800 OREGON STOwnerSOUTH OF THE BORDER LLCCreate Date02/17/2004
ContractorO'NEILL ENTERPRISE INCCategoryPlan
440 - Industrial-Interior
Bathtub0Shower1Ejector/Grind0Dip Well0F Prep Sink0Gar Drain0
Whirlpool0Floor Drain0Water Softner0Drink Ftn0Serv Sink00
Soda Disp
Lavatory20Local Waste0Wait. St.0Shamp Sink00
Lndry TrayCoffee Maker
Toilet20Clothes Wshr0Ice Chest0Flr/Wst Sink0
0
Lndry Stndp
Int Grease Trap
Res. Sink00Bidet0Exam Sink0Catch Basin0
Disposal0
Ext Grease Trap
Bar Sink000Wash Ftn0
Beer Tap0Sculry Sink
Dishwasher
RPZ Valve0
Water Heater000Urinal0
Sump PumpDent. Oper.0Hand Sink
0
Eye Wash Statn
Site Drain000Standp Rec0
Classrm SinkLab Sink0Plaster Sink
Roof Drain000Ice Maker0
Breakrm SinkSterilizer0Surgeons Sink
Use/Nature REPLACEMENT TOILET AND LAVS AND NEW SHOWER FIXTURE NOT INCLUDED ON PERMIT #106422
of Work
SizeMaterialType#Conn. Type
Sanitary Sewer0
0
0
0
0
Storm Sewer0
0
0
0
0
Water Service0
0
0
0
Parcel Id #
0
0300970000
$0.00Permit Voided
Valuation$3,000.00Plan ApprovalPermit Fees$35.00
Issued ByDate03/18/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Signature
Agent/Owner
Address5575 CTY RD NPICKETTWI54964-0000Telephone Number920-428-4700 589-2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.